Title:
|
| | |
FINDING: POTENTIAL CAs
|
|
Wording
|
| | |
The application was reviewed by Jefferson County Permit Center staff on 12/13/94 for the potential presence of critical areas regulated under the provisions of the Ordinance, and the following critical areas were confirmed as potentially present on the subject property: landslide hazard area.
|
|
|
Title:
|
| | |
FINDING: CONFIRMED CAs
|
|
Wording
|
| | |
Acting upon the above information, Jefferson County staff conducted a site inspection of the subject property on 12/14/94 and confirmed the existence of the following critical areas and/or their associated buffers on the property: landslide hazard area.
|
|
|
Title:
|
| | |
FINDING: OTHER RELEVANT INFO
|
|
Wording
|
| | |
Subject parcel is mapped in the Coastal Zone Atlas of Washington as having "unstable" slopes and showing "unstable recent slides" in the near vicinity. Staff visit to site on 12/14/94 found the slope to exceed 45 degrees (estimated to be 55 degrees), well vegetated with scattered second growth Douglas firs, and a moderate shrub understory of ocean spray, snowberry and some salal. Bank look as if it had some minor amounts of debris dumped over the side at one time which has since become incorporated into the bank. However, this bank appears to be stable in its present condition and vegetative cover.
|
|
|
Title:
|
| | |
FINDING: OTHER RELEVANT INFO
|
|
Wording
|
| | |
Subject plot plan shows the northeast corner of the proposed home to be 24 feet from the top of the bank. The northwest corner is shown to be 34 feet from the top of the bank. A minimum required set-back from the top of the bank of 30 feet is normally required, however due to heavy vegetative cover and the presence of large second growth trees, and the use of buffer averaging (29 feet), staff believes the minimum requirement is met.
|
|
|
Title:
|
| | |
GEO HAZARD CUSTOM CONDITION
|
|
Wording
|
| | |
A minimum buffer of 34 and 24 feet shall be maintained from the northwest and northeast corners of the proposed building and the top of the bank. The Administrator authorizes this reduced buffer under sub-section 9.507 because the slope is considered to be adequately vegetated to maintain stability.
|
|
|
Title:
|
| | |
LANDSLIDE/VEGETATION/BUFFER
|
|
Wording
|
| | |
Landslide hazard area and its buffer shall remain naturally vegetated. Should buffer disturbance occur during construction, replanting with native vegetation shall be required by the Critical Area Administrator. No alteration shall be made to the landslide hazard area or its buffer without prior authorization by the Critical Area Administrator.
|
|
|
Title:
|
| | |
DEVELOPMENT & PLOT PLAN
|
|
Wording
|
| | |
The proposed development shall be located on the subject property exactly as identified on the Universal Plot Plan, or other Site Plan, approved by the County as part of the triggering permit application.
|
|