Title:
|
| | |
FINDING: POTENTIAL CAs
|
|
Wording
|
| | |
The application was reviewed by Jefferson County Permit Center staff on 9/1/94 for the potential presence of critical areas regulated under the provisions of the Ordinance, and the following critical areas were confirmed as potentially present on the subject property: landslide hazard area.
|
|
|
Title:
|
| | |
FINDING: CONFIRMED CAs
|
|
Wording
|
| | |
Acting upon the above information, Jefferson County staff conducted a site inspection of the subject property on 9/12/94 and confirmed the existence of the following critical areas and/or their associated buffers on the property: landslide hazard area.
|
|
|
Title:
|
| | |
FINDING: OTHER RELEVANT INFO
|
|
Wording
|
| | |
Staff discussed site visit with applicant on 9/16/94 and informed Mr. John Dowd that a geotech report would be required since a portion of the proposed building footprint lies within the landslide hazard area and its buffer. The landslide hazard area, in this instance, is a steep slope associated with an acess road located immediately above the proposed building site. Both the Critical Areas Ordinance and the building inspector required a geotech report to determine the structural modifications necessary for the proposed garage to be built within a landslide hazard area. On 10/17/94, a geotech report entitled "Structural Calculations for Workshop and Retaining Wall for John Dowd - Project 94304" was submitted to the Permit Center by MC Squared, Inc. of Olympia Washington. This report meets the requirements and concerns of both the Critical Areas Ordinance and the County's building inspector.
|
|
|
Title:
|
| | |
DEVELOPMENT PLOT PLAN
|
|
Wording
|
| | |
The proposed development shall be located on the subject property exactly as identified on the Universal Plot Plan, or other Site Plan, approved by the County as part of the triggering permit application.
|
|
|
Title:
|
| | |
CONSTRUCTION ACTIVITIES
|
|
Wording
|
| | |
Proposed project shall be built according to the specifications outlined in above mentioned geotech report submitted by MC Squared Inc. of Olympia, Washington. All construction activities, including the storage and preparation of materials, shall not encroach upon the designated geologically hazardous area, or its associated buffer, except as absolutely necessary to complete the project.
|
|
|
Title:
|
| | |
DO NOT ALTER LANDSLIDE BUFFER
|
|
Wording
|
| | |
No alteration shall be made to the landslide hazard area buffer without prior authorization by the Critical Area Administrator.
|
|