Description:Below is the scope of work for the proposed project. The information requested is pertaining to shoreline permits or a shoreline exemptions as well as what may be required for critical areas review.
Provide new electrical vehicle charging station, concrete pad and in grade junction box. Provide a 3' bollard and concrete base for charging stations. Provide new conduit and conductors for electric vehicle charging station requiring trenching and backfilling. Trenching will be a at least 24" wide. Provide new panelboard to serve exicting panelboard loads and new car charging stations in place of old. Concrete will be embedded to 5 feet for the bollard and charging station.
Provide in-grade lockable junction box for future electrical vehicle chargin station location.
The length of the conduit/trenching proposed is 165 feet and at least 24" wide.
The size of the charging station and the associated impervious surface will be a maximum of 2'X2' concrete footing per station and stations are 12" wide and 10" deep.
|
Date Issued:3/11/2021 |