Description:
|
| | |
Issue Building Permit (F)
|
|
Date Completed:
|
| | |
11/18/2022
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Final Planning Approval
|
|
Date Completed:
|
| | |
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Final Planning Approval
|
|
Date Completed:
|
| | |
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Updated/Add'l Info Recv'd
|
|
Date Completed:
|
| | |
10/21/2022
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Place HOLD on case
|
|
Date Completed:
|
| | |
11/17/2022
|
|
Disposition:
|
| | |
HOLD
|
|
|
Description:
|
| | |
Updated/Add'l Info Recv'd
|
|
Date Completed:
|
| | |
5/2/2022
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
DRD Reviewer Letter (F)
|
|
Date Completed:
|
| | |
3/23/2022
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Ntc of App +14-Publish-U
|
|
Date Completed:
|
| | |
3/16/2022
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Ntc of App +14-APO-U
|
|
Date Completed:
|
| | |
3/16/2022
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
A Clock Interrupt
|
|
Date Completed:
|
| | |
3/16/2022
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Additional Info Request-DRD
|
|
Date Completed:
|
| | |
3/16/2022
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Updated/Add'l Info Recv'd
|
|
Date Completed:
|
| | |
2/16/2022
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
A Clock Interrupt
|
|
Date Completed:
|
| | |
3/9/2022
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Additional Info Request-DRD
|
|
Date Completed:
|
| | |
3/9/2022
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Additional Info Request-EH
|
|
Date Completed:
|
| | |
2/16/2022
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Miscellaneous
|
|
Date Completed:
|
| | |
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Insp - Miscellaneous
|
|
Date Completed:
|
| | |
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Insp - Miscellaneous
|
|
Date Completed:
|
| | |
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Insp - Exterior Lighting
|
|
Date Completed:
|
| | |
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Insp - Smoke & CO
|
|
Date Completed:
|
| | |
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Insp - Ext. Shear Wall Nailing
|
|
Date Completed:
|
| | |
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Insp - Framing
|
|
Date Completed:
|
| | |
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Insp - Rough-in Plumbing
|
|
Date Completed:
|
| | |
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Insp - Straps (hold downs)
|
|
Date Completed:
|
| | |
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Insp - Foundation Footing
|
|
Date Completed:
|
| | |
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Insp - Underground Plumbing
|
|
Date Completed:
|
| | |
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Insp - Setbacks
|
|
Date Completed:
|
| | |
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Insp - Address Posted
|
|
Date Completed:
|
| | |
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Final Public Works Approval
|
|
Date Completed:
|
| | |
|
|
Disposition:
|
| | |
HOLD
|
|
|
Description:
|
| | |
DRD Approval (Zoning)
|
|
Date Completed:
|
| | |
3/16/2022
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Final Public Works Approval
|
|
Date Completed:
|
| | |
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Final Planning Approval
|
|
Date Completed:
|
| | |
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Septic System Finaled
|
|
Date Completed:
|
| | |
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Address Review Complete
|
|
Date Completed:
|
| | |
4/18/2022
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
RAP Review Complete-U
|
|
Date Completed:
|
| | |
12/16/2021
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Consistency Review-U
|
|
Date Completed:
|
| | |
11/14/2022
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Env. Sensitive Area Review-U
|
|
Date Completed:
|
| | |
3/16/2022
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Stormwater Review-U
|
|
Date Completed:
|
| | |
11/14/2022
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Contractor License/Bond Info
|
|
Date Completed:
|
| | |
4/18/2022
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Plan Check
|
|
Date Completed:
|
| | |
1/3/2022
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Potable Water Approval
|
|
Date Completed:
|
| | |
2/18/2022
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Septic Review Complete-U
|
|
Date Completed:
|
| | |
11/16/2022
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Case Entered
|
|
Date Completed:
|
| | |
12/9/2021
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
App Substantially Complete-U
|
|
Date Completed:
|
| | |
3/16/2022
|
|
Disposition:
|
| | |
DONE
|
|
|
Title:
|
| | |
Bld Custom Condition
|
|
Wording
|
| | |
Tenant improvement permit will be required as a deferred submittal to establish occupancy classification and fire separation.
|
|
|
Title:
|
| | |
COMMERICAL SIGN
|
|
Wording
|
| | |
Business signs require a Commercial Sign Permit from Jefferson County Department of Community Development.
|
|
|
Title:
|
| | |
ALLOWED USES
|
|
Wording
|
| | |
The applicants have not identified current business leases at the time of this application. The proposed new 7,500 square foot industrial building shall only be used for warehousing and light industrial activities allowed in the Glen Cove Business Park, as defined in JCC 18.20.220, JCC 18.10.120 L definitions, and 18.10.230 W definitions. All other uses are prohibited without seperate permit approval by the Jefferson County Department of Community Development.
|
|
|
Title:
|
| | |
APPROVAL FOR INDUSTRIAL BLD ONLY
|
|
Wording
|
| | |
This APPROVAL is for a New Industrial Shell Building only. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits.
|
|
|
Title:
|
| | |
SITE PLAN CHANGES
|
|
Wording
|
| | |
The revised site plan as submitted with the New Industrial Shell Building application on May 12th, 2022 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated November 9th, 2022 shall be resubmitted for review and approval by Jefferson County Department of Community Development.
|
|
|
Title:
|
| | |
CRITICAL AREAS
|
|
Wording
|
| | |
Jefferson County Department of Community Development reviewed the application and the county GIS mapping system for the presence of critical areas and concluded that the property DOES NOT contain critical areas. However, future proposals will be subject to a new critical area review and conditions may be added if critical areas are found on the property.
|
|
|
Title:
|
| | |
IDP
|
|
Wording
|
| | |
Washington State Department of Archaeology and Historic Preservation (DAHP) has identified parcel 986702401 as a high probability area for cultural resources. DAHP has instructed Jefferson County to implement an Inadvertent Discovery Plan in lieu of an archaeological excavation permit and survey. All contractors and personnel shall be familiar with the inadvertent discovery plan as attached to this permit. If any possible historic, archaeological and/or cultural artifacts are inadvertently discovered, the applicant shall immediately stop all work on the project and shall notify the Washington Department of Archaeology and Historic Preservation, Jefferson County Department of Community Development, and affected tribes.
|
|
|
Title:
|
| | |
BMPS
|
|
Wording
|
| | |
The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.
|
|
|
Title:
|
| | |
LARGE STORMWATER
|
|
Wording
|
| | |
The applicant is proposing to create or add 17,000 square feet of impervious surface and 25,000 square feet of land disturbing activities. The 2019 Stormwater Management Manual for Western Washington (2019 SWMMWW) requires proponents of proposals that create more than 5,000 square feet of new impervious surface develop a Stormwater Site Plan that complies with Minimum Requirements #1 - #9 of the 2019 SWMMWW. The applicant shall follow the Jefferson County Department of Public Works (JCPW) Findings, JCPW Recommendations, and Public Works Department Fees Requirement section of the Stormwater Site Plan Review and Comments Memorandum dated October 24th, 2022.
|
|
|
Title:
|
| | |
PRECONSTRUCTION MEETING
|
|
Wording
|
| | |
Prior to commencing land disturbing activity, the proponent shall notify JCPW and arrange a Preconstruction Meeting.
|
|
|
Title:
|
| | |
PROJECT CONSTRUCTION SCHEDULE
|
|
Wording
|
| | |
In accordance with the Jefferson County Unified Development Code, Section 18.30.080 (1) (f): Clearing, grading, and construction of roads, and stormwater management facilities shall be inspected by JCPW. In order to enable the department to conduct inspections in a timely manner, the applicant shall notify the department regarding the project construction schedule.
|
|
|
Title:
|
| | |
ENGINEER LETTER
|
|
Wording
|
| | |
After construction is complete and prior to final DCD project approval, the proponent shall submit a letter to the Public Works Department, from the Engineer of Record (EOR), certifying that the stormwater management facilities have been constructed per the approved plans & specifications. If changes from the approved plans were made, the EOR shall submit an as-built drawing detailing those changes. It is the responsibility of the proponent to schedule inspections with the EOR, his designee &/or qualified inspection firm(s), approved by the EOR, to provide for said final certification.
|
|
|
Title:
|
| | |
STORMWATER AGREEMENT
|
|
Wording
|
| | |
To meet MR#9 Operation & Maintenance, and ensure that the approved stormwater management facilities are appropriately maintained for the life of the project, prior to final project approval, the proponent shall enter into a Stormwater Management Facility Maintenance Agreement with Jefferson County. The Public Works Department will send a copy of the Agreement to the proponent which has been signed by the Public Works Director. The proponent shall sign the Agreement before a notary, file it with the Jefferson County Auditor, and provide Public Works with a copy of the recorded document. County Auditor 2022 recording fees are $203.50 for the first page and $1 for each additional page. Fees are subject to change on an annual basis.
|
|
|
Title:
|
| | |
DEVELOPMENT STANDARDS
|
|
Wording
|
| | |
The proposal shall follow development standards, including parking, visual screening, and landscaping requirements,as specified in Chapter 18.30 JCC, and industrial use standards as specified in JCC 18.20.220.
|
|
|
Title:
|
| | |
UNREASONABLE EFFECTS
|
|
Wording
|
| | |
No use shall be made of equipment or material which produces unreasonable vibration, noise, dust, smoke, heat, glare, odor, or electrical interference to the detriment of the quiet use and enjoyment of adjoining property.
|
|
|
Title:
|
| | |
PLANNER
|
|
Wording
|
| | |
AH
|
|
|
Title:
|
| | |
LANDSCAPING PLAN
|
|
Wording
|
| | |
The applicant shall maintain a 10-foot landscaping buffer, as shown on the approved site plan approved November 9th, 2021, for the life span of the proposal pursuant to JCC 18.30.130(8). The 10-foot landscaping buffer shall remain in natural condition, shall be monitored to ensure the health of landscaping vegetation, and shall include a mix of evergreen and deciduous trees and shrubs generally interspersed to create a filtered screen that grows to at least eight feet in height within two growing seasons, pursuant to JCC 18.30.130. The buffers may contain septic drainfield and reserve areas, necessary utilities, and approved road connections. Staff will inspect the buffers to determine adequacy prior to final building permit occupancy. No disturbance to the 10-foot landscaping buffer shall occur without review and approval by the Jefferson County Department of Community Development.
|
|
|
Title:
|
| | |
FIRE SUPPRESSION
|
|
Wording
|
| | |
All fire suppression systems shall be inspected by the Fire District or County approved fire specialist.
|
|
|
Title:
|
| | |
SOLID WASTE MANAGEMENT
|
|
Wording
|
| | |
Ecology- Solid waste management specific condition. All grading and filling of land must utilize only clean fill. All other materials may be considered solid waste and permit approval may be required from the local jurisdictional health department prior to filling. All removed debris resulting from this project must be disposed of at an approved site. Contact the local jurisdictional health department for proper management of these materials.
|
|
|
Title:
|
| | |
WATER QUALITY/WATERSHED
|
|
Wording
|
| | |
Ecology- Water quality/watershed resources unit specific condition. Erosion control measures must be in place prior to any clearing, grading, or construction. These
control measures must be effective to prevent stormwater runoff from carrying soil and other pollutants into surface water or stormdrains that lead to waters of the state. Sand, silt, clay particles, and soil will damage aquatic habitat and are considered to be pollutants.
|
|
|
Title:
|
| | |
WATER QUALITY/WATERSHED
|
|
Wording
|
| | |
Ecology- Water quality/watershed resources unit specific condition.Any discharge of sediment-laden runoff or other pollutants to waters of the state is in violation of Chapter 90.48 RCW, Water Pollution Control, and WAC 173-201A, Water Quality Standards for
Surface Waters of the State of Washington, and is subject to enforcement action.
|
|
|
Title:
|
| | |
ADDITIONAL PERMITS
|
|
Wording
|
| | |
Ecology- Additional permits specific condition. The applicant shall contact the Washington State Department of Ecology to determine if additional permits or studies are required. Construction site operators must apply for a permit at least 60 days prior to discharging stor water from construction activities and must submit it on or before the date of the first public notice.
|
|
|
Title:
|
| | |
TOXICS CLEANUP PROGRAM
|
|
Wording
|
| | |
Ecology- Toxic cleanup program specific condition. There is one known or suspected contaminated site listed on Ecology’s “Facility Sites List” approximately 1/10th mile south of the proposed action.If contamination is discovered during construction, it must be reported to the WA Department of Ecology’s Southwest Regional Office. Contact the Environmental Report Tracking System Coordinator at (360)-407-6300. Contaminated soils or water may require special handling and/or disposal to protect site workers, visitors, public health, or the environment. A Phase I site assessment is recommended for this site to determine the potential for the presence of contamination originating from previous site activities or nearby activities not related to this site. If contamination is observed during the proposed development, sampling of the potentially contaminated media must be conducted. For assistance and information about subsequent cleanup and to identify the type of testing that will be required, contact Ecology's Toxics Cleanup Program at (360)-407-6300.
|
|