Permit Case Summary

Case Number: Search Help

Case Number:BLD2020-00368 Case Status:Finaled Date Received:7/28/2020
Description:12 NEW CAMPSITES AND 1 COMFORT STATION Date Issued:9/24/2020
Applicant: STATE OF WASHINGTON PARK & REC Expiration Date:9/24/2022 12:00:00 AM
Site Address:306996 HWY 101 Case Finaled:1/27/2022
Parcel No:502021001 Other Cases Parcel Data Map It More Details Parcels Images

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: Insp - FINAL FINAL Building
Date Completed: 1/27/2022
Disposition: DONE
Description: Insp - Miscellaneous
Date Completed: 12/16/2021
Disposition: DONE
Description: Change Status to RENEWED
Date Completed: 9/23/2021
Disposition: DONE
Description: Change Status to RENEWED
Date Completed: 9/23/2021
Disposition: DONE
Description: Insp Reminder (1st - non bldg)
Date Completed: 12/31/2021
Disposition:
Description: Updated/Add'l Info Recv'd
Date Completed: 6/16/2021
Disposition:
Description: Insp - Foundation Footing
Date Completed: 5/13/2021
Disposition: DONE
Description: Insp - Rough-in Plumbing
Date Completed: 4/22/2021
Disposition:
Description: Insp - Foundation Footing
Date Completed: 3/18/2021
Disposition: DONE
Description: Contractor License/Bond Info
Date Completed: 9/23/2021
Disposition: DONE
Description: Issue Building Permit (F)
Date Completed: 9/24/2020
Disposition: DONE
Description: Insp - Final Building
Date Completed: 1/27/2022
Disposition: DONE
Description: Insp - Blower Airtight Test
Date Completed: 1/27/2022
Disposition: DONE
Description: Insp - Parking
Date Completed: 12/16/2021
Disposition: DONE
Description: Insp - Exterior Lighting
Date Completed: 1/27/2022
Disposition: DONE
Description: Insp - Drywell/Alt Drainage
Date Completed: 1/27/2022
Disposition: DONE
Description: Insp - Insulation: Ceiling
Date Completed: 12/16/2021
Disposition: DONE
Description: Insp - Insulation: Floors
Date Completed: 12/16/2021
Disposition:
Description: Insp - Insulation: Walls
Date Completed: 6/11/2021
Disposition: DONE
Description: Insp - Airseal
Date Completed: 12/1/2021
Disposition: DONE
Description: Insp - Mechanical Systems
Date Completed: 1/27/2022
Disposition: DONE
Description: Insp - Mechanical Systems
Date Completed: 1/27/2022
Disposition: DONE
Description: Insp - Propane Tank
Date Completed: 1/27/2022
Disposition: DONE
Description: Insp - Gas Line: Exterior
Date Completed: 1/27/2022
Disposition: DONE
Description: Insp - Gas Line: Interior
Date Completed: 7/6/2021
Disposition: DONE
Description: Insp - Framing
Date Completed: 4/22/2021
Disposition: DONE
Description: Insp - Rough-in Plumbing
Date Completed: 4/22/2021
Disposition: DONE
Description: Insp - Ext. Shear Wall Nailing
Date Completed: 4/22/2021
Disposition: DONE
Description: Insp - Straps (hold downs)
Date Completed: 4/22/2021
Disposition: DONE
Description: Insp - Underground Plumbing
Date Completed: 3/18/2021
Disposition: DONE
Description: Insp - Underground Plumbing
Date Completed: 4/22/2021
Disposition:
Description: Insp - Foundation Stem Wall
Date Completed: 4/28/2021
Disposition:
Description: Insp - Foundation Footing
Date Completed: 4/22/2021
Disposition: DONE
Description: Insp - Setbacks
Date Completed: 4/22/2021
Disposition: DONE
Description: Building Permit Application(F)
Date Completed: 7/29/2020
Disposition: DONE
Description: Septic System Finaled
Date Completed: 8/18/2020
Disposition: DONE
Description: RAP Review Complete-U
Date Completed: 9/1/2020
Disposition: DONE
Description: Consistency Review-U
Date Completed: 8/13/2020
Disposition: DONE
Description: Env. Sensitive Area Review-U
Date Completed: 8/13/2020
Disposition: DONE
Description: Stormwater Review-U
Date Completed: 8/13/2020
Disposition: DONE
Description: Contractor License/Bond Info
Date Completed: 9/24/2020
Disposition: DONE
Description: Plan Check
Date Completed: 8/25/2020
Disposition: DONE
Description: Potable Water Approval
Date Completed: 8/4/2020
Disposition: DONE
Description: Septic Review Complete-U
Date Completed: 8/18/2020
Disposition: DONE
Description: App Substantially Complete-U
Date Completed: 8/6/2020
Disposition: DONE
Description: Case Entered
Date Completed: 7/29/2020
Disposition:

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: WATER/SEPTIC CROSSING
Wording Any areas where a water line and sewer force main cross shall meet requirements of installation compliant with Department of Ecology Sewage Works Desgin.

Title: C-DRAINAGE & EROSION CONTROL
Wording Design and maintain adequate buffers of undisturbed native vegetation to minimize off-site impacts of surface water runoff, erosion, and sedimentation.

Title: C-DRAINAGE & EROSION CONTROL
Wording Natural vegetation shall be retained to the maximum extent possible in construction and operation of any use. All development shall ensure that soil erosion and sedimentation of drainage ways will be controlled to prevent damage to adjoining property and downstream drainage channels and receiving waters.

Title: C-DRAINAGE & EROSION CONTROL
Wording Any area cleared or graded and not covered with gravel or an impervious surface shall be seeded immediately on completion of the project. If erosion is probable, areas with exposed soil shall be protected by temporary means during and following construction until seeding is established. All disturbances should at least be revegetated with grasses and forbs; including shrubs and trees as appropriate in the revegetation effort. Use of plant species native to the county is encouraged.

Title: C-EROSION CONTROL MEASURES
Wording Erosion control measures must be in place prior to any clearing, grading, or construction. These control measures must be effective to prevent stormwater runoff from carrying soil and other pollutants into surface water or storm drains that lead to waters of the state. Sand, silt, clay particles, and soil will damage aquatic habitat and are considered to be pollutants.

Title: C-BMPS
Wording The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.

Title: C-SEPA EXEMPT
Wording Washington Department of Parks and Recreation determined that this proposal is categorically exempt from review under the State Environmental Policy Act (SEPA) pursuant to WAC 197-11-800(1(b)(iv); WAC 197-11-800(2)(c); WAC 197-11-800(2)(d)(i)(ix); WAC 197-11-800(2)(e); WAC 197-11-800(2)(g); WAC 197-11-800(23)(b)(c); and WAC 197-11-800(24)(g).

Title: C-MARK CLEARING LIMITS
Wording THE LIMITS OF CLEARING SHALL BE CLEARLY MARKED ON THE PROPERTY. PLASTIC, METAL, OR STAKE WIRE FENCING SHALL BE INSTALLED AS SHOWN ON THE APPROVED SITE PLAN PRIOR TO BEGINNING ANY GROUND-DISTURBING ACTIVITIES, AND SHALL BE INSTALLED TO COMPLY WITH SPECIFICATIONS IN THE 2019 STORMWATER MANAGEMENT MANUAL FOR WESTERN WASHINGTON. HEAVY EQUIPMENT SHALL NOT DISTURB TOP SOIL OR VEGETATION BEYOND THE CLEARING LIMITS.

Title: C-SOIL STOCKPILES
Wording Soil in stockpiles should be stabilized or protected with sediment-trapping measures to prevent soil loss. All exposed areas of final grade or areas that are not scheduled for work, whether at final grade or otherwise, shall not remain exposed and un-worked for more than two days, between October 1 and April 30. Between May 1 and September 30, no soils shall remain exposed and un-worked for more than 7 days.

Title: C-CONFIRMED ESAS
Wording The application was reviewed by the Jefferson County Department of Community Development staff on 8/13/2020 for the potential presence of Environmentally Sensitive Areas (ESAs) under the provisions of the Unified Development Code (UDC). The following ESAs were confirmed to be present on the subject property: seismic. The proposal is located outside any shoreline jurisdiction and outside of any 150 foot FWHCA buffer.

Title: C-GEOHAZARD AREAS
Wording Geologically Hazardous Areas in Jefferson County are characterized by slope, soil type, geologic material, and groundwater that may combine to create problems with slope stability, erosion, and water quality during and after construction or during natural events such as earthquakes or severe rainstorms.

Title: C-APPROVAL FOR
Wording This approval is for 12 new campsites and one comfort station only. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits.

Title: C-SITE PLAN CHANGES
Wording The site plan as submitted with the 12 new campsitesw and 1 comfort station application on July 28, 2020 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated August 13, 2020 shall be resubmitted for review and approval by Jefferson County Department of Community Development.

Title: C-PEDESTRIAN CIRCULATION
Wording Paths shall have a standard unobstructed width of six feet or the minimum standards contained in the Jefferson County nonmotorized transportation and recreational trails plan, whichever is greater.

Title: C-PEDESTRIAN CIRCULATION
Wording Paths shall be visually distinguished from roads, driveways, and parking spaces.

Title: C-PARKING
Wording Parking shall be consistent with Jeffeson County Code (JCC) Section 18.30.100.


Case Findings
Below is a list of findings for this permit case. Findings typically record facts that the staff are using as the basis of their permit processing decisions.
Title: F-General PMT Notice
Wording NOTICE: This permit does not excuse the proponent from complying with other local, state, and federal ordinances, regulations, or statutes applicable to the proposed development, but consistent with RCW 90.58. Development pursuant to this permit shall be undertaken subject to the applicable policies and performance standards of the Jefferson County Shoreline Management Master Program and the Jefferson County Unified Development Code.