Description:
|
| | |
Insp - FINAL FINAL Building
|
|
Date Completed:
|
| | |
1/27/2022
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Miscellaneous
|
|
Date Completed:
|
| | |
12/16/2021
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Change Status to RENEWED
|
|
Date Completed:
|
| | |
9/23/2021
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Change Status to RENEWED
|
|
Date Completed:
|
| | |
9/23/2021
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp Reminder (1st - non bldg)
|
|
Date Completed:
|
| | |
12/31/2021
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Updated/Add'l Info Recv'd
|
|
Date Completed:
|
| | |
6/16/2021
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Insp - Foundation Footing
|
|
Date Completed:
|
| | |
5/13/2021
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Rough-in Plumbing
|
|
Date Completed:
|
| | |
4/22/2021
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Insp - Foundation Footing
|
|
Date Completed:
|
| | |
3/18/2021
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Contractor License/Bond Info
|
|
Date Completed:
|
| | |
9/23/2021
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Issue Building Permit (F)
|
|
Date Completed:
|
| | |
9/24/2020
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Final Building
|
|
Date Completed:
|
| | |
1/27/2022
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Blower Airtight Test
|
|
Date Completed:
|
| | |
1/27/2022
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Parking
|
|
Date Completed:
|
| | |
12/16/2021
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Exterior Lighting
|
|
Date Completed:
|
| | |
1/27/2022
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Drywell/Alt Drainage
|
|
Date Completed:
|
| | |
1/27/2022
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Insulation: Ceiling
|
|
Date Completed:
|
| | |
12/16/2021
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Insulation: Floors
|
|
Date Completed:
|
| | |
12/16/2021
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Insp - Insulation: Walls
|
|
Date Completed:
|
| | |
6/11/2021
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Airseal
|
|
Date Completed:
|
| | |
12/1/2021
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Mechanical Systems
|
|
Date Completed:
|
| | |
1/27/2022
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Mechanical Systems
|
|
Date Completed:
|
| | |
1/27/2022
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Propane Tank
|
|
Date Completed:
|
| | |
1/27/2022
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Gas Line: Exterior
|
|
Date Completed:
|
| | |
1/27/2022
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Gas Line: Interior
|
|
Date Completed:
|
| | |
7/6/2021
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Framing
|
|
Date Completed:
|
| | |
4/22/2021
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Rough-in Plumbing
|
|
Date Completed:
|
| | |
4/22/2021
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Ext. Shear Wall Nailing
|
|
Date Completed:
|
| | |
4/22/2021
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Straps (hold downs)
|
|
Date Completed:
|
| | |
4/22/2021
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Underground Plumbing
|
|
Date Completed:
|
| | |
3/18/2021
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Underground Plumbing
|
|
Date Completed:
|
| | |
4/22/2021
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Insp - Foundation Stem Wall
|
|
Date Completed:
|
| | |
4/28/2021
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Insp - Foundation Footing
|
|
Date Completed:
|
| | |
4/22/2021
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Setbacks
|
|
Date Completed:
|
| | |
4/22/2021
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Building Permit Application(F)
|
|
Date Completed:
|
| | |
7/29/2020
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Septic System Finaled
|
|
Date Completed:
|
| | |
8/18/2020
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
RAP Review Complete-U
|
|
Date Completed:
|
| | |
9/1/2020
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Consistency Review-U
|
|
Date Completed:
|
| | |
8/13/2020
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Env. Sensitive Area Review-U
|
|
Date Completed:
|
| | |
8/13/2020
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Stormwater Review-U
|
|
Date Completed:
|
| | |
8/13/2020
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Contractor License/Bond Info
|
|
Date Completed:
|
| | |
9/24/2020
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Plan Check
|
|
Date Completed:
|
| | |
8/25/2020
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Potable Water Approval
|
|
Date Completed:
|
| | |
8/4/2020
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Septic Review Complete-U
|
|
Date Completed:
|
| | |
8/18/2020
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
App Substantially Complete-U
|
|
Date Completed:
|
| | |
8/6/2020
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Case Entered
|
|
Date Completed:
|
| | |
7/29/2020
|
|
Disposition:
|
| | |
|
|
|
Title:
|
| | |
WATER/SEPTIC CROSSING
|
|
Wording
|
| | |
Any areas where a water line and sewer force main cross shall meet requirements of installation compliant with Department of Ecology Sewage Works Desgin.
|
|
|
Title:
|
| | |
C-DRAINAGE & EROSION CONTROL
|
|
Wording
|
| | |
Design and maintain adequate buffers of undisturbed native vegetation to minimize off-site impacts of surface water runoff, erosion, and sedimentation.
|
|
|
Title:
|
| | |
C-DRAINAGE & EROSION CONTROL
|
|
Wording
|
| | |
Natural vegetation shall be retained to the maximum extent possible in construction and operation of any use. All development shall ensure that soil erosion and sedimentation of drainage ways will be controlled to prevent damage to adjoining property and downstream drainage channels and receiving waters.
|
|
|
Title:
|
| | |
C-DRAINAGE & EROSION CONTROL
|
|
Wording
|
| | |
Any area cleared or graded and not covered with gravel or an impervious surface shall be seeded immediately on completion of the project. If erosion is probable, areas with exposed soil shall be protected by temporary means during and following construction until seeding is established. All disturbances should at least be revegetated with grasses and forbs; including shrubs and trees as appropriate in the revegetation effort. Use of plant species native to the county is encouraged.
|
|
|
Title:
|
| | |
C-EROSION CONTROL MEASURES
|
|
Wording
|
| | |
Erosion control measures must be in place prior to any clearing, grading, or construction. These control measures must be effective to prevent stormwater runoff from carrying soil and other pollutants into surface water or storm drains that lead to waters of the state. Sand, silt, clay particles, and soil will damage aquatic habitat and are considered to be pollutants.
|
|
|
Title:
|
| | |
C-BMPS
|
|
Wording
|
| | |
The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.
|
|
|
Title:
|
| | |
C-SEPA EXEMPT
|
|
Wording
|
| | |
Washington Department of Parks and Recreation determined that this proposal is categorically exempt from review under the State Environmental Policy Act (SEPA) pursuant to WAC 197-11-800(1(b)(iv); WAC 197-11-800(2)(c); WAC 197-11-800(2)(d)(i)(ix); WAC 197-11-800(2)(e); WAC 197-11-800(2)(g); WAC 197-11-800(23)(b)(c); and WAC 197-11-800(24)(g).
|
|
|
Title:
|
| | |
C-MARK CLEARING LIMITS
|
|
Wording
|
| | |
THE LIMITS OF CLEARING SHALL BE CLEARLY MARKED ON THE PROPERTY. PLASTIC, METAL, OR STAKE WIRE FENCING SHALL BE INSTALLED AS SHOWN ON THE APPROVED SITE PLAN PRIOR TO BEGINNING ANY GROUND-DISTURBING ACTIVITIES, AND SHALL BE INSTALLED TO COMPLY WITH SPECIFICATIONS IN THE 2019 STORMWATER MANAGEMENT MANUAL FOR WESTERN WASHINGTON. HEAVY EQUIPMENT SHALL NOT DISTURB TOP SOIL OR VEGETATION BEYOND THE CLEARING LIMITS.
|
|
|
Title:
|
| | |
C-SOIL STOCKPILES
|
|
Wording
|
| | |
Soil in stockpiles should be stabilized or protected with sediment-trapping measures to prevent soil loss. All exposed areas of final grade or areas that are not scheduled for work, whether at final grade or otherwise, shall not remain exposed and un-worked for more than two days, between October 1 and April 30. Between May 1 and September 30, no soils shall remain exposed and un-worked for more than 7 days.
|
|
|
Title:
|
| | |
C-CONFIRMED ESAS
|
|
Wording
|
| | |
The application was reviewed by the Jefferson County Department of Community Development staff on 8/13/2020 for the potential presence of Environmentally Sensitive Areas (ESAs) under the provisions of the Unified Development Code (UDC). The following ESAs were confirmed to be present on the subject property: seismic. The proposal is located outside any shoreline jurisdiction and outside of any 150 foot FWHCA buffer.
|
|
|
Title:
|
| | |
C-GEOHAZARD AREAS
|
|
Wording
|
| | |
Geologically Hazardous Areas in Jefferson County are characterized by slope, soil type, geologic material, and groundwater that may combine to create problems with slope stability, erosion, and water quality during and after construction or during natural events such as earthquakes or severe rainstorms.
|
|
|
Title:
|
| | |
C-APPROVAL FOR
|
|
Wording
|
| | |
This approval is for 12 new campsites and one comfort station only. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits.
|
|
|
Title:
|
| | |
C-SITE PLAN CHANGES
|
|
Wording
|
| | |
The site plan as submitted with the 12 new campsitesw and 1 comfort station application on July 28, 2020 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated August 13, 2020 shall be resubmitted for review and approval by Jefferson County Department of Community Development.
|
|
|
Title:
|
| | |
C-PEDESTRIAN CIRCULATION
|
|
Wording
|
| | |
Paths shall have a standard unobstructed width of six feet or the minimum standards contained in the Jefferson County nonmotorized transportation and recreational trails plan, whichever is greater.
|
|
|
Title:
|
| | |
C-PEDESTRIAN CIRCULATION
|
|
Wording
|
| | |
Paths shall be visually distinguished from roads, driveways, and parking spaces.
|
|
|
Title:
|
| | |
C-PARKING
|
|
Wording
|
| | |
Parking shall be consistent with Jeffeson County Code (JCC) Section 18.30.100.
|
|