Permit Case Summary

Case Number: Search Help

Case Number:BLD2020-00146 Case Status:Finaled Date Received:4/14/2020
Description:MANUFACTURED HOME INSTALLATION-Vin Number 2521 KID 6274 AB SEP96-00338 Date Issued:5/21/2020
Applicant: STO LLC Expiration Date:5/21/2021 12:00:00 AM
Site Address:104 SUNSET MEADOWS LN Case Finaled:5/17/2021
Parcel No:971900009 Other Cases Parcel Data Map It More Details Parcels Images

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: Insp - FINAL FINAL Building
Date Completed: 5/17/2021
Disposition: DONE
Description: Insp - Final Building
Date Completed: 5/17/2021
Disposition: DONE
Description: Inspection Reminder Sent (1st)
Date Completed: 3/29/2021
Disposition:
Description: Insp - Footing Drains
Date Completed: 12/31/2020
Disposition: DONE
Description: Issue Mobile Home Permit (F)
Date Completed: 5/21/2020
Disposition: DONE
Description: Insp - Drywell/Alt Drainage
Date Completed: 12/31/2020
Disposition: DONE
Description: Insp - Address Posted
Date Completed:
Disposition:
Description: Insp - Skirting & Ventilation
Date Completed: 12/31/2020
Disposition: DONE
Description: Insp - Blocking & Tie Down
Date Completed: 10/22/2020
Disposition: DONE
Description: Insp - MH Foundation
Date Completed: 8/20/2020
Disposition: DONE
Description: Insp - Setbacks
Date Completed: 8/20/2020
Disposition: DONE
Description: Add Manufactured Home Insp Set
Date Completed:
Disposition:
Description: Updated/Add'l Info Recv'd
Date Completed: 5/6/2020
Disposition: DONE
Description: Building Permit Application(F)
Date Completed: 4/17/2020
Disposition: DONE
Description: Septic System Finaled
Date Completed: 3/15/2021
Disposition: DONE
Description: Address Review Complete
Date Completed: 4/17/2020
Disposition: DONE
Description: RAP Review Complete-U
Date Completed: 4/30/2020
Disposition: DONE
Description: Consistency Review-U
Date Completed: 4/30/2020
Disposition: DONE
Description: Env. Sensitive Area Review-U
Date Completed: 4/30/2020
Disposition: DONE
Description: Stormwater Review-U
Date Completed: 4/30/2020
Disposition: DONE
Description: Contractor License/Bond Info
Date Completed: 4/17/2020
Disposition: DONE
Description: Plan Check
Date Completed: 5/6/2020
Disposition: DONE
Description: Potable Water Approval
Date Completed: 5/7/2020
Disposition: DONE
Description: Septic Review Complete-U
Date Completed: 4/22/2020
Disposition: DONE
Description: App Substantially Complete-U
Date Completed: 4/30/2020
Disposition: DONE
Description: Case Entered
Date Completed: 4/15/2020
Disposition:

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: APPROVAL FOR NEW MAN HOME ONLY
Wording This approval is for a new manufactured home only. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits.

Title: SITE PLAN CHANGES
Wording The site plan as submitted with the manufactured home application on April 14, 2020 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated April 30, 2020 shall be resubmitted for review and approval by Jefferson County Department of Community Development.

Title: CRITICAL AREAS
Wording The Geographic Information Systems mapping review identified the following Critical Areas on the subject property: Critical Aquifer Recharge Area

Title: CARA
Wording Aquifer Recharge Areas in Jefferson County are characterized by porous geological formations that allow percolation of the surface water into the soils and the underlying zone of saturation. Aquifers are geologic formations that contain sufficient saturated permeable material to yield significant quantities of water to wells and springs. Aquifers serve as the source of drinking water within most of the rural portions of Jefferson County. Critical Aquifer Recharge Areas may require special protection measures to mitigate water quality degradation. The submitted proposal does not require additional aquifer protection measures. However, during construction the project shall follow the Best Management Practices (BMPs) and facility design standards as identified and defined in the Stormwater Management Manual for the Puget Sound Basin.

Title: BMPS
Wording The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.

Title: MEDIUM STORMWATER
Wording The applicant is proposing to create or add 2697 square feet of impervious surface and 2697 square feet of land disturbing activities. JCC 18.30.060 and 18.30.070 require the project applicant submit a stormwater plan meeting Minimum Requirements #1 through #5 of the Department of Ecology Stormwater Management Manual for Western Washington. The stormwater plan shall address measures to control stormwater, erosion and sediment during construction and shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.

Title: STORMWATER PLAN
Wording A Stormwater Plan has been submitted and approved by the Department of Community Development. Once the subject permit has been issued the applicant shall fully implement the provisions of the submitted plan. No clearing for roadways or utilities shall occur on the project site until clearing necessary for the installation of temporary sedimentation and erosion control measures have been completed.

Title: DRYWELL
Wording The applicant has proposed and been approved to utilize downspout full infiltration to manage stormwater from roof areas. The soils were evaluated by using the septic soil logs and found to have three or more feet of permeable soils and the anticipated water table is at least 1 foot below the bottom of the proposed drywell. The drywell will be designed per the requirements of the Stormwater Management Manual for Western Washington BMP T5.10. The drywell shall by 5 x 12 x 4 cubic feet.

Title: SHEET FLOW
Wording The applicant has proposed and been approved to utilize sheet flow dispersion for driveway stormwater management. The sheet flow shall be designed per the requirements of the stormwater manual. A 2-foot wide gravel transition zone and 10-feet of vegetated flow path are required.

Title: PLANNER
Wording scc

Title: Water line/Septic system setback
Wording Unless specifically approved throught the septic approval, 10' minimum separation required between the water line and any onsite sewage system components including sewage transport lines.