Permit Case Summary

Case Number: Search Help

Case Number:BLD2019-00558 Case Status: Date Received:12/16/2019
Description:pole building, garage with bathroom SEP16-00134 Date Issued:1/14/2020
Applicant:DALE & GAYLE COOK Expiration Date:1/14/2023 12:00:00 AM
Site Address:221 LILLIAN ST Case Finaled:
Parcel No:901101018 Other Cases Parcel Data Map It More Details

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: Inspection Reminder Sent (1st)
Date Completed: 11/28/2022
Disposition:
Description: Change Status to RENEWED
Date Completed: 4/5/2022
Disposition: DONE
Description: Override - Activity Holds
Date Completed: 4/5/2022
Disposition:
Description: Inspection Reminder Sent (2nd)
Date Completed: 2/28/2022
Disposition:
Description: Inspection Reminder Sent (1st)
Date Completed: 12/15/2021
Disposition:
Description: Change Status to RENEWED
Date Completed:
Disposition:
Description: Override - Activity Holds
Date Completed: 10/11/2021
Disposition:
Description: Change Status to RENEWED
Date Completed: 9/20/2021
Disposition: DONE
Description: Override - Activity Holds
Date Completed: 9/20/2021
Disposition:
Description: Inspection Reminder Sent (2nd)
Date Completed: 9/3/2021
Disposition:
Description: Inspection Reminder Sent (1st)
Date Completed: 3/29/2021
Disposition:
Description: Issue Building Permit (F)
Date Completed: 1/14/2020
Disposition: DONE
Description: Override - Activity Holds
Date Completed: 1/14/2020
Disposition:
Description: Insp - Final Building
Date Completed:
Disposition:
Description: Insp - Wallboard Nailing
Date Completed:
Disposition:
Description: Insp - Insulation: Ceiling
Date Completed:
Disposition:
Description: Insp - Insulation: Walls
Date Completed:
Disposition:
Description: Insp - Framing
Date Completed:
Disposition:
Description: Insp - Rough-in Plumbing
Date Completed:
Disposition:
Description: Insp - Underground Plumbing
Date Completed:
Disposition:
Description: Insp - WRIA 17Water Meter Insp
Date Completed:
Disposition:
Description: Updated/Add'l Info Recv'd
Date Completed: 12/30/2019
Disposition: DONE
Description: Additional Info Request-EH
Date Completed: 1/3/2020
Disposition: DONE
Description: Building Permit Application(F)
Date Completed: 12/16/2019
Disposition: DONE
Description: WRIA 17 Instr Flow Req
Date Completed: 1/3/2020
Disposition: DONE
Description: Address Review Complete
Date Completed: 12/16/2019
Disposition: DONE
Description: Septic System Finaled
Date Completed: 11/15/2019
Disposition: DONE
Description: RAP Review Complete-U
Date Completed: 1/6/2020
Disposition: DONE
Description: Env. Sensitive Area Review-U
Date Completed: 1/6/2020
Disposition: DONE
Description: Consistency Review-U
Date Completed: 1/6/2020
Disposition: DONE
Description: Stormwater Review-U
Date Completed: 1/6/2020
Disposition: DONE
Description: Contractor License/Bond Info
Date Completed: 12/16/2019
Disposition: DONE
Description: Plan Check
Date Completed: 1/14/2020
Disposition: DONE
Description: Septic Review Complete-U
Date Completed: 1/3/2020
Disposition: DONE
Description: Potable Water Approval
Date Completed: 1/3/2020
Disposition: DONE
Description: Case Entered
Date Completed: 12/16/2019
Disposition:
Description: App Substantially Complete-U
Date Completed: 12/16/2019
Disposition: DONE

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: WELL ON SITE
Wording The well on site has been granted approval for use as a potable water source by the PUD provided that when potable water from the PUD is available, the applicant will connect and decommission the well. SEE BLD19-00432 and NTT 628128

Title: WELL USE RESTRICTIONS
Wording The property is regulated under WRIA 17 instream flow rule for the Chimacum subbasin. The water use is limited to interior use only and the well must have a meter installed in accordance with Ecology's requirements per BLD19-432.

Title: APPROVAL FOR BWOP GAR ONLY
Wording This approval is for an after the fact permit for a garage with a bathroom built without permits only. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits.

Title: SITE PLAN CHANGES
Wording The revised site plan as submitted with the BWOP garage with bathroom application on December 30, 2019 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated January 6, 2020 shall be resubmitted for review and approval by Jefferson County Department of Community Development

Title: CRITICAL AREAS
Wording The Geographic Information Systems mapping review identified the following Critical Areas on the subject property: Critical Aquifer Recharge Area

Title: CARA
Wording Aquifer Recharge Areas in Jefferson County are characterized by porous geological formations that allow percolation of the surface water into the soils and the underlying zone of saturation. Aquifers are geologic formations that contain sufficient saturated permeable material to yield significant quantities of water to wells and springs. Aquifers serve as the source of drinking water within most of the rural portions of Jefferson County. Critical Aquifer Recharge Areas may require special protection measures to mitigate water quality degradation. The submitted proposal does not require additional aquifer protection measures. However, during construction the project shall follow the Best Management Practices (BMPs) and facility design standards as identified and defined in the Stormwater Management Manual for the Puget Sound Basin.

Title: SMALL STORMWATER
Wording The applicant is proposing to create or add 1152 square feet of impervious surface and 0 square feet of land disturbing activities. JCC 18.30.060 and 18.30.070 require your proposal comply with Minimum Requirement #2 (Construction Stormwater Pollution Prevention) of the Department of Ecology Stormwater Management Manual for Western Washington to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.

Title: BMPS
Wording The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.

Title: PLANNER
Wording scc