Description:
|
| | |
Insp - FINAL FINAL Building
|
|
Date Completed:
|
| | |
6/30/2020
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Issue Building Permit (F)
|
|
Date Completed:
|
| | |
1/7/2020
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Final Building
|
|
Date Completed:
|
| | |
6/30/2020
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Miscellaneous
|
|
Date Completed:
|
| | |
6/30/2020
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Building Permit Application(F)
|
|
Date Completed:
|
| | |
12/6/2019
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Septic System Finaled
|
|
Date Completed:
|
| | |
6/30/2020
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Contractor License/Bond Info
|
|
Date Completed:
|
| | |
12/31/2019
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Plan Check
|
|
Date Completed:
|
| | |
12/20/2019
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Potable Water Approval
|
|
Date Completed:
|
| | |
12/31/2019
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Septic Review Complete-U
|
|
Date Completed:
|
| | |
1/2/2020
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Case Entered
|
|
Date Completed:
|
| | |
12/6/2019
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
App Substantially Complete-U
|
|
Date Completed:
|
| | |
|
|
Disposition:
|
| | |
|
|
|
Title:
|
| | |
PURPOSE OF APPLICATION
|
|
Wording
|
| | |
The purpose of this application is to correct a long outstanding violation of building an ADU on the property without permits. The ADU is to be converted into storage with a bathroom.
|
|
|
Title:
|
| | |
HOLD-PLUMBING REMOVED
|
|
Wording
|
| | |
On December 4, 2019 an inspection by JCEPH verified that the kitchen sink and stove have been removed from the kitchen and the sewer line and water lines have been cut and filled with expanding foam. Photos are in the septic file.
|
|
|
Title:
|
| | |
HOLD-INSPECT PLUMBING
|
|
Wording
|
| | |
Prior to final approval, the sealed water and sewer line must be either cut inside the wall and covered by drywall or a box may be constructed to meet the intent of enclosing them behind the wall. Whatever method is used, the plumbing connections must not be exposed within the cabinet.
|
|
|
Title:
|
| | |
HOLD-SEAL COUNTER TOP OPENING
|
|
Wording
|
| | |
Prior to final inspection the opening in the countertop where the kitchen sink was located must be filled to create an uninterupted surface.
|
|
|
Title:
|
| | |
HOLD-SEPTIC DEFICIENCIES
|
|
Wording
|
| | |
The maintenance inspection done on 4/9/19 had 2 deficiencies that must be corrected prior to final:
1. "Barricade protection zone against vehicular traffic"
2. "The audible alarm has been replaced by not removing the old speaker and just rewiring in a new speaker which sits inside the panel making it hard to hear. New speaker needs to be placed where the old speaker was".
After the barricades are in place contact this office at 360-385-9444 to schedule an inspection of them and to determine if the auditable alarm is adequate. A fee may be required for that inspection.
|
|