Description:
|
| | |
Inspection Reminder Sent (1st)
|
|
Date Completed:
|
| | |
11/28/2022
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Insp - Insulation: Floors
|
|
Date Completed:
|
| | |
11/1/2022
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Change Status to RENEWED
|
|
Date Completed:
|
| | |
4/5/2022
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Override - Activity Holds
|
|
Date Completed:
|
| | |
4/5/2022
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Inspection Reminder Sent (2nd)
|
|
Date Completed:
|
| | |
2/28/2022
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Inspection Reminder Sent (1st)
|
|
Date Completed:
|
| | |
12/15/2021
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Insp - Underground Plumbing
|
|
Date Completed:
|
| | |
6/10/2021
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Change Status to RENEWED
|
|
Date Completed:
|
| | |
2/23/2021
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Override - Activity Holds
|
|
Date Completed:
|
| | |
2/23/2021
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Inspection Reminder Sent (1st)
|
|
Date Completed:
|
| | |
10/20/2020
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Issue Building Permit (F)
|
|
Date Completed:
|
| | |
1/7/2020
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Override - Activity Holds
|
|
Date Completed:
|
| | |
1/7/2020
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Updated/Add'l Info Recv'd
|
|
Date Completed:
|
| | |
12/30/2019
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Additional Info Request-EH
|
|
Date Completed:
|
| | |
11/6/2019
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Final Building
|
|
Date Completed:
|
| | |
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Insp - Smoke & CO
|
|
Date Completed:
|
| | |
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Insp - Blower Airtight Test
|
|
Date Completed:
|
| | |
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Insp - Mechanical Systems
|
|
Date Completed:
|
| | |
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Insp - Insulation: Ceiling
|
|
Date Completed:
|
| | |
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Insp - Insulation: Floors
|
|
Date Completed:
|
| | |
6/2/2021
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Insulation: Walls
|
|
Date Completed:
|
| | |
11/1/2022
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Ext. Shear Wall Nailing
|
|
Date Completed:
|
| | |
5/7/2021
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Propane Tank
|
|
Date Completed:
|
| | |
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Insp - Gas Line: Exterior
|
|
Date Completed:
|
| | |
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Insp - Gas Line: Interior
|
|
Date Completed:
|
| | |
6/10/2021
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Airseal
|
|
Date Completed:
|
| | |
8/5/2022
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Rough-in Plumbing
|
|
Date Completed:
|
| | |
7/29/2022
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Framing
|
|
Date Completed:
|
| | |
8/5/2022
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Underground Plumbing
|
|
Date Completed:
|
| | |
4/23/2021
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Miscellaneous
|
|
Date Completed:
|
| | |
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Updated/Add'l Info Recv'd
|
|
Date Completed:
|
| | |
10/29/2019
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
A Clock Interrupt
|
|
Date Completed:
|
| | |
10/29/2019
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Additional Info Request-BLD
|
|
Date Completed:
|
| | |
10/29/2019
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Post Holes
|
|
Date Completed:
|
| | |
8/19/2020
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Setbacks
|
|
Date Completed:
|
| | |
3/10/2020
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Address Posted
|
|
Date Completed:
|
| | |
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Updated/Add'l Info Recv'd
|
|
Date Completed:
|
| | |
10/23/2019
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
A Clock Interrupt
|
|
Date Completed:
|
| | |
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Additional Info Request-EH
|
|
Date Completed:
|
| | |
1/3/2020
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Miscellaneous
|
|
Date Completed:
|
| | |
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Insp - WRIA 17Water Meter Insp
|
|
Date Completed:
|
| | |
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Building Permit Application(F)
|
|
Date Completed:
|
| | |
9/23/2019
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
WRIA 17 Instr Flow Req
|
|
Date Completed:
|
| | |
9/24/2019
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Septic System Finaled
|
|
Date Completed:
|
| | |
11/16/2019
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Address Review Complete
|
|
Date Completed:
|
| | |
9/23/2019
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
RAP Review Complete-U
|
|
Date Completed:
|
| | |
11/21/2019
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Consistency Review-U
|
|
Date Completed:
|
| | |
10/1/2019
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Env. Sensitive Area Review-U
|
|
Date Completed:
|
| | |
10/1/2019
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Stormwater Review-U
|
|
Date Completed:
|
| | |
10/1/2019
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Contractor License/Bond Info
|
|
Date Completed:
|
| | |
9/23/2019
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Potable Water Approval
|
|
Date Completed:
|
| | |
11/21/2019
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Plan Check
|
|
Date Completed:
|
| | |
10/29/2019
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Septic Review Complete-U
|
|
Date Completed:
|
| | |
1/3/2020
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
App Substantially Complete-U
|
|
Date Completed:
|
| | |
10/1/2019
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Case Entered
|
|
Date Completed:
|
| | |
9/23/2019
|
|
Disposition:
|
| | |
|
|
|
Title:
|
| | |
WELL USE IN PUD SERVICE AREA
|
|
Wording
|
| | |
The PUD has allowed the use of the on site well for potable use for this property until the water main from the public source is available. This approval is allowed provided that when the public source is avaliable the owner of the property will connect to the public source and decommission the well-see NTT 628128 and parcel tag.
|
|
|
Title:
|
| | |
APPROVAL FOR NSFR ONLY
|
|
Wording
|
| | |
This approval is for a new single family residence only. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits.
|
|
|
Title:
|
| | |
SITE PLAN CHANGES
|
|
Wording
|
| | |
The site plan as submitted with the new single family residence application on September 23, 2019 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated October 1, 2019 shall be resubmitted for review and approval by Jefferson County Department of Community Development.
|
|
|
Title:
|
| | |
UNPERMITTED STRUCTURE
|
|
Wording
|
| | |
The property currently has an unpermitted garage on the property. The garage was identified as an agricultural building on the site map. However, a site visit confirms the use of a garage. The owners elect to permit as a garage with a BWOP rather than remove plumbing and other non-agriculture related items. The assessor's office taxes the building as a garage built in 2017. FINAL INSPECTION AND CERTIFICATE OF OCCUPANCY FOR THE SINGLE FAMILY RESIDENCE WILL NOT BE ISSUED UNTIL THE BWOP FOR THE GARAGE HAS BEEN APPROVED AND FINALED under BLD19-00558.
|
|
|
Title:
|
| | |
CRITICAL AREAS
|
|
Wording
|
| | |
The Geographic Information Systems mapping review identified the following Critical Areas on the subject property: Geologically Hazardous Areas (Seismic Hazard), Critical Aquifer Recharge Area
|
|
|
Title:
|
| | |
GEOHAZARD AREA
|
|
Wording
|
| | |
Geologically Hazardous Areas in Jefferson County are characterized by slope, soil type, geologic material, and groundwater that may combine to create problems with slope stability, erosion, and water quality during and after construction or during natural events such as earthquakes or severe rainstorms.
|
|
|
Title:
|
| | |
CARA
|
|
Wording
|
| | |
Critical Aquifer Recharge Areas may require special protection measures to mitigate water quality degradation. The submitted proposal does not require additional aquifer protection measures. However, during construction the project shall follow the Best Management Practices (BMPs) and facility design standards as identified and defined in the Stormwater Management Manual for the Puget Sound Basin.
|
|
|
Title:
|
| | |
SMALL STORMWATER
|
|
Wording
|
| | |
The applicant is proposing to create or add 1300 square feet of impervious surface and 3812 square feet of land disturbing activities. JCC 18.30.060 and 18.30.070 require your proposal comply with Minimum Requirement #2 (Construction Stormwater Pollution Prevention) of the Department of Ecology Stormwater Management Manual for Western Washington to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.
|
|
|
Title:
|
| | |
PLANNER
|
|
Wording
|
| | |
scc
|
|
|
Title:
|
| | |
SEPTIC - No Assurance future dev.
|
|
Wording
|
| | |
Approval of this permit does not provide any assurance of future approvals for onsite sewage disposal on the property or use of any existing septic systems. Actions taken to date and proposed as part of this project may limit or prevent future development of an onsite sewage system. Future proposals must meet current code at the time of application.
|
|
|
Title:
|
| | |
Septic - Stormwater setbacks
|
|
Wording
|
| | |
SEPTIC SYSTEM COMPONENT SETBACKS TO STORMWATER MANAGEMENT FACILITIES -
Any interceptor/curtain drain or foundation drain, or any other source of water that is downgradient or below MUST be setback a minimum of 30’ from any septic system dispersal area (drainfield) and 5’ from any septic tanks.
Splash blocks must be directed away from ALL septic components.
Subsurface stormwater infiltration, subsurface soil dispersal systems with NO discharge point must be located a minimum of 10 ft. downgradient of the drainfield.
|
|
|
Title:
|
| | |
WRIA-Chimacum Sub-basin
|
|
Wording
|
| | |
The project is located within WRIA 17 and thus is subject to compliance with the WA State Department of Ecology In Stream Flow Rule for that region. The parcel is located within the Chimacum sub-basin; as such, state regulations require the following:
1. Water use shall be limited to domestic use only, and such use shall not include outdoor irrigation. "Domestic use" means use of water associated with human health and welfare requirements, including water used for drinking, bathing, sanitary requirements, cooking, laundering and other incidental household uses, including potable domestic water requirements associated with commercial and industrial purposes. (WAC 173-517-150(8))
2. INSTALLATION OF A WATER METER, MEETING DEPARTMENT OF ECOLOGY SPECIFICATIONS, IS REQUIRED FOR ALL NEW USES THROUGHOUT THE WATERSHED. (WAC 173-517-180) BROCHURES WITH SPECIFICATIONS ARE ENCLOSED WITH THE PERMIT.
Refer to enclosed documents for more information, see Ecology web site at http://www.ecy.wa.gov/programs/wr/instream-flows/quilsnowbasin.html or contact Ecology at 360-407-6300.
|
|