Case Number:BLD2018-00421 Case Status:Finaled Date Received:9/13/2018
Description:NSFR SEP18-00162/SEP10-00040 Date Issued:10/30/2018
Applicant: HABITAT FOR HUMANITY OF EAST Expiration Date:10/30/2020 12:00:00 AM
Site Address:61 C ST Case Finaled:11/27/2019
Parcel No:996400705 Other Cases Parcel Data Map It More Details Parcels Images

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: File Archived
Date Completed: 12/9/2019
Disposition:
Description: Certificate of Occupancy-F
Date Completed: 11/27/2019
Disposition: DONE
Description: Insp - FINAL FINAL Building
Date Completed: 11/27/2019
Disposition: DONE
Description: Change Status to RENEWED
Date Completed: 10/22/2019
Disposition: DONE
Description: Updated/Add'l Info Recv'd
Date Completed: 10/22/2019
Disposition: DONE
Description: Updated/Add'l Info Recv'd
Date Completed: 10/22/2019
Disposition: DONE
Description: Inspection Reminder Sent (1st)
Date Completed: 10/11/2019
Disposition:
Description: Insp - Int. Shear Wall Nailing
Date Completed: 9/9/2019
Disposition: DONE
Description: Insp - Wallboard Nailing
Date Completed: 9/9/2019
Disposition: DONE
Description: Change Status to RENEWED
Date Completed: 8/29/2019
Disposition: DONE
Description: Inspection Reminder Sent (1st)
Date Completed: 8/18/2019
Disposition:
Description: Insp - Foundation Footing
Date Completed: 5/17/2019
Disposition: DONE
Description: Insp - Underground Plumbing
Date Completed: 2/4/2019
Disposition: DONE
Description: Issue Building Permit (F)
Date Completed: 10/30/2018
Disposition: DONE
Description: Insp - Smoke & CO
Date Completed: 11/27/2019
Disposition: DONE
Description: Insp - Blower Airtight Test
Date Completed: 11/27/2019
Disposition: DONE
Description: Insp - Wallboard Nailing
Date Completed: 9/4/2019
Disposition: FAIL
Description: Insp - Final Building
Date Completed: 11/27/2019
Disposition: DONE
Description: Insp - Address Posted
Date Completed: 11/27/2019
Disposition: DONE
Description: Insp - Drywell/Alt Drainage
Date Completed: 2/19/2019
Disposition: DONE
Description: Insp - Int. Shear Wall Nailing
Date Completed: 9/4/2019
Disposition: FAIL
Description: Insp - Insulation: Ceiling
Date Completed:
Disposition:
Description: Insp - Insulation: Floors
Date Completed: 3/7/2019
Disposition: DONE
Description: Insp - Insulation: Walls
Date Completed: 8/16/2019
Disposition: DONE
Description: Insp - Airseal
Date Completed: 8/12/2019
Disposition: DONE
Description: Insp - Framing
Date Completed: 7/30/2019
Disposition: DONE
Description: Insp - Rough-in Plumbing
Date Completed: 7/30/2019
Disposition: DONE
Description: Insp - Ext. Shear Wall Nailing
Date Completed: 5/21/2019
Disposition: DONE
Description: Insp - Straps (hold downs)
Date Completed:
Disposition:
Description: Insp - Foundation Stem Wall
Date Completed: 1/15/2019
Disposition: DONE
Description: Insp - Footing Drains
Date Completed: 2/19/2019
Disposition: DONE
Description: Insp - Foundation Footing
Date Completed: 12/20/2018
Disposition: DONE
Description: Insp - Erosion Control
Date Completed:
Disposition:
Description: Insp - Setbacks
Date Completed: 12/20/2018
Disposition: DONE
Description: Add SF Dwelling Inspection Set
Date Completed:
Disposition:
Description: Final Public Works Approval
Date Completed: 11/26/2019
Disposition: DONE
Description: Building Permit Application(F)
Date Completed: 9/13/2018
Disposition: DONE
Description: Septic System Finaled
Date Completed: 11/25/2019
Disposition: DONE
Description: Address Review Complete
Date Completed: 10/18/2018
Disposition: DONE
Description: RAP Review Complete-U
Date Completed: 9/18/2018
Disposition: DONE
Description: Consistency Review-U
Date Completed: 10/25/2018
Disposition: DONE
Description: Env. Sensitive Area Review-U
Date Completed: 10/25/2018
Disposition: DONE
Description: Stormwater Review-U
Date Completed: 10/25/2018
Disposition: DONE
Description: Contractor License/Bond Info
Date Completed: 9/13/2018
Disposition: DONE
Description: Plan Check
Date Completed: 10/23/2018
Disposition: DONE
Description: Potable Water Approval
Date Completed: 10/16/2018
Disposition: DONE
Description: Septic Review Complete-U
Date Completed: 10/26/2018
Disposition: DONE
Description: Case Entered
Date Completed: 9/13/2018
Disposition:
Description: App Substantially Complete-U
Date Completed: 9/13/2018
Disposition: DONE

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: PLANNER
Wording DWJ

Title: BMPs
Wording The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.


Case Findings
Below is a list of findings for this permit case. Findings typically record facts that the staff are using as the basis of their permit processing decisions.
Title: F-Site Plan Changes
Wording The site plan as submitted with the Building Permit application on September 13, 2018 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated October 25, 2018 shall be resubmitted for review and approval by Jefferson County Department of Community Development.

Title: F-Approval for _____ Only
Wording This approval is for a Single Family Residence only. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits.