Permit Case Summary

Case Number: Search Help

Case Number:BLD2018-00043 Case Status:Finaled Date Received:1/31/2018
Description:ADDITION AND ALTERATION TO EXISTING SINGLE FAMILY RESIDENCE. SEP74-00016 WALK-OUT BASEMENT &CRAWL SPACE TO HAVE PONYWALLS & FDN. REPLACED TO CREATE LOWER LEVEL Date Issued:7/2/2018
Applicant:KRISTINE EASTERDAY Expiration Date:7/2/2020 12:00:00 AM
Site Address:170 SUNSET BLVD Case Finaled:9/13/2019
Parcel No:938100305 Other Cases Parcel Data Map It More Details Parcels Images

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: Certificate of Occupancy-F
Date Completed: 9/13/2019
Disposition: DONE
Description: Insp - FINAL FINAL Building
Date Completed: 9/13/2019
Disposition: DONE
Description: Change Status to RENEWED
Date Completed: 2/20/2019
Disposition: DONE
Description: Inspection Reminder Sent (1st)
Date Completed: 1/18/2019
Disposition:
Description: Insp - Gas Line: Interior
Date Completed: 12/5/2018
Disposition: DONE
Description: Insp - Miscellaneous
Date Completed: 10/1/2018
Disposition: DONE
Description: Insp - Underground Plumbing
Date Completed: 9/14/2018
Disposition: DONE
Description: Issue Building Permit (F)
Date Completed: 7/2/2018
Disposition: DONE
Description: Updated/Add'l Info Recv'd
Date Completed: 6/27/2018
Disposition: DONE
Description: Plan Check
Date Completed: 5/9/2018
Disposition: DONE
Description: Initiate Revision
Date Completed: 5/3/2018
Disposition: DONE
Description: Updated/Add'l Info Recv'd
Date Completed: 5/3/2018
Disposition: DONE
Description: Updated/Add'l Info Recv'd
Date Completed: 4/23/2018
Disposition:
Description: Issue Building Permit (F)
Date Completed: 3/1/2018
Disposition: DONE
Description: Insp - Final Building
Date Completed: 9/13/2019
Disposition: DONE
Description: Insp - Smoke & CO
Date Completed: 9/13/2019
Disposition: DONE
Description: Insp - Wallboard Nailing
Date Completed: 12/20/2018
Disposition: DONE
Description: Insp - Insulation: Ceiling
Date Completed: 9/13/2019
Disposition: DONE
Description: Insp - Insulation: Floors
Date Completed: 10/1/2018
Disposition: DONE
Description: Insp - Insulation: Walls
Date Completed: 9/13/2019
Disposition: DONE
Description: Insp - Airseal
Date Completed: 11/30/2018
Disposition: DONE
Description: Insp - Framing
Date Completed: 11/30/2018
Disposition: DONE
Description: Insp - Rough-in Plumbing
Date Completed: 11/30/2018
Disposition: DONE
Description: Insp - Ext. Shear Wall Nailing
Date Completed: 10/30/2018
Disposition: DONE
Description: Insp - Straps (hold downs)
Date Completed: 11/30/2018
Disposition: DONE
Description: Insp - Under Floor Framing
Date Completed: 11/30/2018
Disposition: DONE
Description: Insp - Foundation Stem Wall
Date Completed: 8/10/2018
Disposition: DONE
Description: Insp - Foundation Footing
Date Completed: 7/24/2018
Disposition: DONE
Description: Insp - Setbacks
Date Completed: 7/24/2018
Disposition: DONE
Description: A Clock Interrupt
Date Completed: 2/26/2018
Disposition: DONE
Description: Additional Info Request-EH
Date Completed: 2/26/2018
Disposition: DONE
Description: Building Permit Application(F)
Date Completed: 1/31/2018
Disposition: DONE
Description: Septic System Finaled
Date Completed: 9/29/2010
Disposition: DONE
Description: Address Review Complete
Date Completed: 1/31/2018
Disposition: DONE
Description: Consistency Review-U
Date Completed: 2/5/2018
Disposition: DONE
Description: Env. Sensitive Area Review-U
Date Completed: 2/5/2018
Disposition: DONE
Description: Stormwater Review-U
Date Completed: 2/5/2018
Disposition: DONE
Description: Contractor License/Bond Info
Date Completed: 1/31/2018
Disposition: DONE
Description: Plan Check
Date Completed: 2/27/2018
Disposition: DONE
Description: Septic Review Complete-U
Date Completed: 2/26/2018
Disposition: DONE
Description: Case Entered
Date Completed: 1/31/2018
Disposition:
Description: App Substantially Complete-U
Date Completed: 1/31/2018
Disposition: DONE

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: PLANNER
Wording DWJ

Title: BMPs
Wording The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.


Case Findings
Below is a list of findings for this permit case. Findings typically record facts that the staff are using as the basis of their permit processing decisions.
Title: F-Site Plan Changes
Wording The site plan as submitted with the Building Permit application on January 30, 2018 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated February 5, 2018 shall be resubmitted for review and approval by Jefferson County Department of Community Development.

Title: F-Approval for _____ Only
Wording This approval is for an New Addition to an Existing, Permitted Single Family Residence only. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits.