Permit Case Summary

Case Number: Search Help

Case Number:BLD2017-00171 Case Status: Date Received:4/19/2017
Description:INTERIOR RENOVATION- WITH INCREASE TO PITCH OF ROOF (2ND FLOOR WAS 704SQ. FT NEW PROPOSED SQ. FT IS 995) SEP13-00035 Date Issued:8/3/2020
Applicant:STEPHEN F PETERSON Expiration Date:8/3/2021 12:00:00 AM
Site Address:144 QUIET PL Case Finaled:
Parcel No:502155001 Other Cases Parcel Data Map It More Details Parcels Images

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: Inspection Reminder Sent (2nd)
Date Completed: 12/15/2021
Disposition:
Description: Inspection Reminder Sent (1st)
Date Completed: 9/3/2021
Disposition:
Description: Final Planning Approval
Date Completed: 5/12/2021
Disposition: DONE
Description: Insp - Shower Pan
Date Completed: 3/11/2021
Disposition: DONE
Description: Insp - Gas Line: Exterior
Date Completed:
Disposition:
Description: Insp - Gas Line: Interior
Date Completed:
Disposition:
Description: Insp - Airseal
Date Completed: 12/23/2020
Disposition: DONE
Description: Issue Building Permit (F)
Date Completed: 8/3/2020
Disposition: DONE
Description: Updated/Add'l Info Recv'd
Date Completed: 9/25/2018
Disposition:
Description: Insp - Final Building
Date Completed: 8/31/2021
Disposition: DONE
Description: Insp - Smoke & CO
Date Completed: 8/31/2021
Disposition: DONE
Description: Insp - Wallboard Nailing
Date Completed: 1/13/2021
Disposition: DONE
Description: Insp - Insulation: Walls
Date Completed: 12/23/2020
Disposition: DONE
Description: Insp - Framing
Date Completed: 12/10/2020
Disposition: DONE
Description: Insp - Rough-in Plumbing
Date Completed: 12/10/2020
Disposition: DONE
Description: A Clock Interrupt
Date Completed: 8/31/2017
Disposition: DONE
Description: Additional Info Request-BLD
Date Completed: 8/31/2017
Disposition: DONE
Description: Building Permit Application(F)
Date Completed: 4/21/2017
Disposition: DONE
Description: Septic System Finaled
Date Completed: 1/5/2022
Disposition: DONE
Description: Address Review Complete
Date Completed: 4/21/2017
Disposition: DONE
Description: Consistency Review-U
Date Completed: 4/21/2017
Disposition: DONE
Description: Contractor License/Bond Info
Date Completed: 4/21/2017
Disposition: DONE
Description: Plan Check
Date Completed: 8/31/2017
Disposition: DONE
Description: Septic Review Complete-U
Date Completed: 7/27/2020
Disposition: DONE
Description: Case Entered
Date Completed: 4/21/2017
Disposition:
Description: App Substantially Complete-U
Date Completed: 4/21/2017
Disposition: DONE

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: Septic Inspection
Wording ADDITIONAL SEPTIC SYSTEM INSPECTION REQUIRED PRIOR TO FINAL APPROVAL of this building permit. The septic system permitted under SEP18-00042 shall be completed and finaled prior to final approval of this building permit. The site is in violation due to connection of a second building to the septic system, corrections required.

Title: Septic - Stormwater setbacks
Wording SEPTIC SYSTEM COMPONENT SETBACKS TO STORMWATER MANAGEMENT FACILITIES - Any interceptor/curtain drain or foundation drain, or any other source of water that is downgradient or below MUST be setback a minimum of 30’ from any septic system dispersal area (drainfield) and 5’ from any septic tanks. Splash blocks must be directed away from ALL septic components. Subsurface stormwater infiltration, subsurface soil dispersal systems with NO discharge point must be located a minimum of 10 ft. downgradient of the drainfield.