Description:
|
| | |
Updated/Add'l Info Recv'd
|
|
Date Completed:
|
| | |
6/19/2018
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Certificate of Occupancy-F
|
|
Date Completed:
|
| | |
6/14/2018
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Certificate of Occupancy-F
|
|
Date Completed:
|
| | |
6/12/2018
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - FINAL FINAL Building
|
|
Date Completed:
|
| | |
6/12/2018
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Final Building
|
|
Date Completed:
|
| | |
6/12/2018
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Temporary Cert of Occupancy(F)
|
|
Date Completed:
|
| | |
6/6/2018
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Updated/Add'l Info Recv'd
|
|
Date Completed:
|
| | |
5/22/2018
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Issue Building Permit (F)
|
|
Date Completed:
|
| | |
8/28/2017
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Food Service Review
|
|
Date Completed:
|
| | |
11/30/2017
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Septic Review Complete-U
|
|
Date Completed:
|
| | |
11/30/2017
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Foundation Stem Wall
|
|
Date Completed:
|
| | |
11/20/2017
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Plan Check
|
|
Date Completed:
|
| | |
11/20/2017
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Initiate Revision
|
|
Date Completed:
|
| | |
11/17/2017
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Updated/Add'l Info Recv'd
|
|
Date Completed:
|
| | |
11/6/2017
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Issue Building Permit (F)
|
|
Date Completed:
|
| | |
8/28/2017
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Updated/Add'l Info Recv'd
|
|
Date Completed:
|
| | |
7/5/2017
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
A Clock Interrupt
|
|
Date Completed:
|
| | |
8/1/2017
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Additional Info Request-EH
|
|
Date Completed:
|
| | |
8/1/2017
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Food Service Review
|
|
Date Completed:
|
| | |
8/1/2017
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Up Front Review
|
|
Date Completed:
|
| | |
5/31/2017
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Updated/Add'l Info Recv'd
|
|
Date Completed:
|
| | |
5/30/2017
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Potable Water Approval
|
|
Date Completed:
|
| | |
5/31/2017
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Miscellaneous
|
|
Date Completed:
|
| | |
6/1/2018
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Fire Protection
|
|
Date Completed:
|
| | |
6/1/2018
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Final Building
|
|
Date Completed:
|
| | |
6/1/2018
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Pressure Test
|
|
Date Completed:
|
| | |
6/1/2018
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Propane Tank
|
|
Date Completed:
|
| | |
6/1/2018
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Gas Line: Exterior
|
|
Date Completed:
|
| | |
5/11/2018
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Gas Line: Interior
|
|
Date Completed:
|
| | |
3/2/2018
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Wallboard Nailing
|
|
Date Completed:
|
| | |
3/19/2018
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Int. Shear Wall Nailing
|
|
Date Completed:
|
| | |
3/19/2018
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Insulation: Ceiling
|
|
Date Completed:
|
| | |
5/24/2018
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Insulation: Floors
|
|
Date Completed:
|
| | |
1/2/2018
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Insulation: Walls
|
|
Date Completed:
|
| | |
3/8/2018
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Airseal
|
|
Date Completed:
|
| | |
3/2/2018
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Framing
|
|
Date Completed:
|
| | |
3/2/2018
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Rough-in Plumbing
|
|
Date Completed:
|
| | |
3/2/2018
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Ext. Shear Wall Nailing
|
|
Date Completed:
|
| | |
2/21/2018
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Straps (hold downs)
|
|
Date Completed:
|
| | |
3/2/2018
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Under Floor Framing
|
|
Date Completed:
|
| | |
1/2/2018
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Underground Plumbing
|
|
Date Completed:
|
| | |
12/7/2017
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Foundation Footing
|
|
Date Completed:
|
| | |
10/26/2017
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Setbacks
|
|
Date Completed:
|
| | |
10/26/2017
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Building Permit Application(F)
|
|
Date Completed:
|
| | |
3/29/2017
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
DRD Approval (Zoning)
|
|
Date Completed:
|
| | |
4/6/2017
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Final Planning Approval
|
|
Date Completed:
|
| | |
4/6/2017
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Septic System Finaled
|
|
Date Completed:
|
| | |
6/12/2018
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Address Review Complete
|
|
Date Completed:
|
| | |
3/29/2017
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
RAP Review Complete-U
|
|
Date Completed:
|
| | |
5/22/2017
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Consistency Review-U
|
|
Date Completed:
|
| | |
4/6/2017
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Env. Sensitive Area Review-U
|
|
Date Completed:
|
| | |
4/6/2017
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Stormwater Review-U
|
|
Date Completed:
|
| | |
4/6/2017
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Contractor License/Bond Info
|
|
Date Completed:
|
| | |
3/29/2017
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Plan Check
|
|
Date Completed:
|
| | |
4/4/2017
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Septic Review Complete-U
|
|
Date Completed:
|
| | |
8/1/2017
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Case Entered
|
|
Date Completed:
|
| | |
3/29/2017
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
App Substantially Complete-U
|
|
Date Completed:
|
| | |
4/6/2017
|
|
Disposition:
|
| | |
DONE
|
|
|
Title:
|
| | |
Bld Outside Storage
|
|
Wording
|
| | |
Commercial and industrial developments located in all zoning districts shall screen from areas frequented by the general public, all materials stored outside buildings or structures which are not for display or immediate sale. Areas frequented by the general public shall be defined as public streets and rights-of-way, and other areas normally used by the general public located adjacent to the subject property.
|
|
|
Title:
|
| | |
Bld Noise
|
|
Wording
|
| | |
The intensity of sound emitted by any commercial or industrial activity shall not exceed levels estabished by the Washington State Department of Ecology under WAC 173-60, and by Jefferson County under Resolution No. 67-85, "Establishment of Environmental Designations for Noise Abatement Areas for Jefferson County."
|
|
|
Title:
|
| | |
Bld Noise Abatement
|
|
Wording
|
| | |
All noise emitting machinery that cannot in any other way operate below the maximum permitted noise level shall be housed in a sound-attenuating structure.
|
|
|
Title:
|
| | |
Bld Security/hooded lights
|
|
Wording
|
| | |
Lighting fixtures shall be designed and hooded to prevent the light source from being directly visible from outside the boundaries of the property. The intensity or brightness of all lighting, during construction and after project completion shall not adversely affect the use of surrounding properties or adjoining rights-of-way.
|
|
|
Title:
|
| | |
Bld Exterior height lights
|
|
Wording
|
| | |
Exterior lighting for commercial and industrial uses shall not exceed thirty feet (30') in height from the finished grade. Exterior lighting for residential uses shall not exceed twenty feet (20') in height from the finished grade, excepting when such lighting is an integral part of a building or structure. Ground level lighting is encouraged.
|
|
|
Title:
|
| | |
SURFACE DRAINAGE
|
|
Wording
|
| | |
Stormwater run-off from new gravel driveway and parking spaces must be directed away from all septic components to areas indicted on the site plan.
|
|
|
Title:
|
| | |
PLANNER
|
|
Wording
|
| | |
DWJ
|
|
|
Title:
|
| | |
BMPs
|
|
Wording
|
| | |
The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.
|
|
|
Title:
|
| | |
Food Service - Inspect. Required
|
|
Wording
|
| | |
H - PRIOR TO FINAL OCCUPANCY AN INSPECTION BY JCPH FOOD PROGRAM STAFF IS REQUIRED. Inspection of food service facilities and kitchen are required to verify compliance with WAC 246-215 Washington State Retail Food Code.
|
|