Description:
|
| | |
Insp Reminder (1st - non bldg)
|
|
Date Completed:
|
| | |
10/23/2017
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp Reminder (1st - non bldg)
|
|
Date Completed:
|
| | |
11/30/2017
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Issue Building Permit (F)
|
|
Date Completed:
|
| | |
11/17/2016
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Landscaping
|
|
Date Completed:
|
| | |
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Final Planning Approval
|
|
Date Completed:
|
| | |
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Building Permit Application(F)
|
|
Date Completed:
|
| | |
10/12/2016
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Consistency Review-U
|
|
Date Completed:
|
| | |
11/10/2016
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Env. Sensitive Area Review-U
|
|
Date Completed:
|
| | |
11/10/2016
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Stormwater Review-U
|
|
Date Completed:
|
| | |
11/10/2016
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Contractor License/Bond Info
|
|
Date Completed:
|
| | |
11/17/2016
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Case Entered
|
|
Date Completed:
|
| | |
10/12/2016
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
App Substantially Complete-U
|
|
Date Completed:
|
| | |
10/12/2016
|
|
Disposition:
|
| | |
DONE
|
|
|
Title:
|
| | |
SIGN CONDITION
|
|
Wording
|
| | |
All trails signs installed as part of the project shall comply with the sign code.
|
|
|
Title:
|
| | |
HPA CONDITION
|
|
Wording
|
| | |
The applicant shall adhere to all Hydraulic Project Approval requirements.
|
|
|
Title:
|
| | |
CORPS CONDITION
|
|
Wording
|
| | |
The applicant shall comply with all U.S. Army Corps of Engineers permit conditions.
|
|
|
Title:
|
| | |
GEOTECH CONDITION
|
|
Wording
|
| | |
The applicant shall adhere to all conclusions and recommendations presented in the geotechnical report prepared by GeoEngineers (dated December 16, 2013).
|
|
|
Title:
|
| | |
PLANTING CONDITION
|
|
Wording
|
| | |
The applicant shall implement the proposed mitigation described in the November 29, 2015 Addendum to Critical Areas Report and the landscaping sheets L1 through L12 submitted on August 13, 2015 letter (entitled Additional SEPA Items EXCEPT that varieties of native species, such as Blizzard Mock Orange (Philadelphus Lewsii ‘Blizzard’) and amethyst coralberry (Symphoricarpos x Doorenbosii ‘Kordes’) shall not be planted within any fish and wildlife habitat conservation area, wetland, or critical area buffer. No landscaping varieties or non-native plant species shall be installed within a critical area or buffer, and those non-native species shown on the landscaping plan shall be replaced with native species such that the density of the planting area is not decreased by the plant substitutions. Prior to building final, DCD shall verify that only native species have been installed within the critical areas, buffers, and mitigation area, as per the approved mitigation proposal and this permit condition.
|
|
|
Title:
|
| | |
STORMWATER CONDITION
|
|
Wording
|
| | |
The applicant shall implement the stormwater control plan in the Stormwater Site Plan Report prepared for this project by Nakano Associates (dated December 13, 2013) and shall ensure all applicable BMPs are in place to protect water quality.
|
|
|
Title:
|
| | |
EROSION CONDITION
|
|
Wording
|
| | |
Erosion control measures must be in place prior to any clearing, grading, or construction. These control measures must be effective to prevent stormwater runoff from carrying soil and other pollutants into surface water or stormdrains that lead to waters of the state. Sand, silt, clay particles, and soil will damage aquatic habitat and are considerered to be pollutants.
|
|
|
Title:
|
| | |
ARCHAEOLOGY CONDITION
|
|
Wording
|
| | |
The applicant shall adhere to the protocols in the March 20, 2013 letter from Suquamish Tribe if any inadvertent archaeological resources or human remains are found.
|
|
|
Title:
|
| | |
SHORELINE CONDITION
|
|
Wording
|
| | |
The applicant shall adhere to the permit conditions in the shoreline permit (SDP13-00045) issued for this project and shall be constructed based on the approved plans (stamped March 21, 2016).
|
|