Description:
|
| | |
Certificate of Occupancy-F
|
|
Date Completed:
|
| | |
6/15/2016
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - FINAL FINAL Building
|
|
Date Completed:
|
| | |
6/15/2016
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Final Building
|
|
Date Completed:
|
| | |
6/15/2016
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Plan Check
|
|
Date Completed:
|
| | |
6/10/2016
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Initiate Revision
|
|
Date Completed:
|
| | |
5/24/2016
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Issue Building Permit (F)
|
|
Date Completed:
|
| | |
3/7/2016
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Up Front Review
|
|
Date Completed:
|
| | |
3/3/2016
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Updated/Add'l Info Recv'd
|
|
Date Completed:
|
| | |
2/24/2016
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
A Clock Interrupt
|
|
Date Completed:
|
| | |
2/23/2016
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Additional Info Request-EH
|
|
Date Completed:
|
| | |
2/23/2016
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Updated/Add'l Info Recv'd
|
|
Date Completed:
|
| | |
1/14/2016
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
A Clock Interrupt
|
|
Date Completed:
|
| | |
1/14/2016
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Additional Info Request-EH
|
|
Date Completed:
|
| | |
1/14/2016
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Address Posted
|
|
Date Completed:
|
| | |
6/15/2016
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Fire Protection
|
|
Date Completed:
|
| | |
6/15/2016
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Smoke & CO
|
|
Date Completed:
|
| | |
6/15/2016
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Wallboard Nailing
|
|
Date Completed:
|
| | |
6/15/2016
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Framing
|
|
Date Completed:
|
| | |
6/15/2016
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Rough-in Plumbing
|
|
Date Completed:
|
| | |
3/25/2016
|
|
Disposition:
|
| | |
FAIL
|
|
|
Description:
|
| | |
Insp - Straps (hold downs)
|
|
Date Completed:
|
| | |
6/15/2016
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Building Permit Application(F)
|
|
Date Completed:
|
| | |
10/22/2015
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Building Permit Application(F)
|
|
Date Completed:
|
| | |
10/22/2015
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
DRD Approval (Zoning)
|
|
Date Completed:
|
| | |
3/3/2016
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Final Planning Approval
|
|
Date Completed:
|
| | |
2/25/2016
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Septic System Finaled
|
|
Date Completed:
|
| | |
12/19/2007
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Address Review Complete
|
|
Date Completed:
|
| | |
3/7/2016
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
RAP Review Complete-U
|
|
Date Completed:
|
| | |
3/7/2016
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Consistency Review-U
|
|
Date Completed:
|
| | |
10/30/2015
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Env. Sensitive Area Review-U
|
|
Date Completed:
|
| | |
10/30/2015
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Stormwater Review-U
|
|
Date Completed:
|
| | |
10/30/2015
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Contractor License/Bond Info
|
|
Date Completed:
|
| | |
3/7/2016
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Plan Check
|
|
Date Completed:
|
| | |
10/30/2015
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Potable Water Approval
|
|
Date Completed:
|
| | |
10/30/2015
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Septic Review Complete-U
|
|
Date Completed:
|
| | |
2/23/2016
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Case Entered
|
|
Date Completed:
|
| | |
10/22/2015
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
App Substantially Complete-U
|
|
Date Completed:
|
| | |
10/30/2015
|
|
Disposition:
|
| | |
DONE
|
|
|
Title:
|
| | |
I-502 KITCHEN LIMITED
|
|
Wording
|
| | |
JCPH approval is based on the proponent’s statement that processing of 'edibles' will be limited to marijuana infused beverages. No other processing other than the use of the Bunn type brewing equiptment as described by the licensed designer have been approved. Any change in processing or menu will required further review by this office.
|
|
|
Title:
|
| | |
SEPTIC DESIGN FLOWS
|
|
Wording
|
| | |
Per septic permit exceeding the permitted design flow of 480 gal/day max. or 385 Gal/day average, shall constitute a violation of this permit. Water usage monitoring shall be maintained in accordance with the Notice to Title
|
|
|
Title:
|
| | |
CONDITIONS OF SEPTIC APPROVA.
|
|
Wording
|
| | |
The septic approval for this project is based on compliance with the "restrictive covenant regarding monitoring of on site sewage system for non residential wastewater" recorded on __2/2/16___________ under AFN #__597590____________
This onsite sewage system is designed for domestic strength wastewater only. Disposal of any other waste strength is considered a violation of this permit.
Waste Strength (BOD, CBOD, DO. TSS, Grease and oils and ph) is to be monitored quarterly until stabilized and then annually thereafter. Responsibility is that of the owner. Results are to be submitted to the Jefferson County Health Dept. 30 days following testing.
The permit to process recreational marijuana has been approved based on the operation plan dated 05/14 and as approved by the Liquor Control Board. Copy of plan is in the building review packet in the septic permit file.
|
|
|
Title:
|
| | |
HOLD-NTT FOR NON RESIDENTIAL WAST
|
|
Wording
|
| | |
A notice to title was recorded to this property defining the limitations of the septic system to treat and dispose of non-residential sewage, requiring regular and on going waste strength testing and water use monitoring. NTT recorded under AFN 597590
|
|
|
Title:
|
| | |
PLANNER
|
|
Wording
|
| | |
DWJ
|
|
|
Title:
|
| | |
SEPTIC - No Assurance future dev.
|
|
Wording
|
| | |
Approval of this permit does not provide any assurance of future approvals for onsite sewage disposal on the property or use of any existing septic systems. Actions taken to date and proposed as part of this project may limit or prevent future development of an onsite sewage system. Future proposals must meet current code at the time of application.
|
|