Permit Case Summary

Case Number: Search Help

Case Number:BLD2015-00033 Case Status:Finaled Date Received:2/5/2015
Description:NEW CONSTRUCTION OF SINGLE STORY OFFICE- OF 525 SQ FT. EXISTING OFFICE TO BE DEMO- ONCE THIS PERMIT IS APPROVED *** REVISION RECEIVED 4/22/15 ADDING 36 SQ FT OF NEW HEATED FLOOR AREA TO THIS PROJECT.**** Date Issued:4/29/2015
Applicant:LAWRENCE R JOHNSON Expiration Date:4/29/2016 12:00:00 AM
Site Address:10733 RHODY DR Case Finaled:4/11/2016
Parcel No:942903401 Other Cases Parcel Data Map It More Details Parcels Images

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: Certificate of Occupancy-F
Date Completed: 4/11/2016
Disposition: DONE
Description: Insp - FINAL FINAL Building
Date Completed: 4/6/2016
Disposition: DONE
Description: Insp - Final Building
Date Completed: 4/6/2016
Disposition: DONE
Description: Insp - Parking
Date Completed: 4/6/2016
Disposition: DONE
Description: Inspection Reminder Sent
Date Completed: 3/8/2016
Disposition: DONE
Description: Insp - Fire Protection
Date Completed: 3/25/2016
Disposition: DONE
Description: Insp - Final Building
Date Completed: 3/25/2016
Disposition: FAIL
Description: Insp - Final Building
Date Completed: 11/4/2015
Disposition: FAIL
Description: Insp - Wallboard Nailing
Date Completed: 7/29/2015
Disposition: DONE
Description: Building Permit Application(F)
Date Completed: 4/29/2015
Disposition:
Description: Issue Building Permit (F)
Date Completed: 4/29/2015
Disposition:
Description: Building Permit Application(F)
Date Completed: 4/29/2015
Disposition: DONE
Description: Building Permit Application(F)
Date Completed: 4/24/2015
Disposition: DONE
Description: Return Status to Pending
Date Completed: 4/24/2015
Disposition: DONE
Description: Plan Check
Date Completed: 4/27/2015
Disposition: DONE
Description: Consistency Review-U
Date Completed: 4/29/2015
Disposition: DONE
Description: Septic Review Complete-U
Date Completed: 4/28/2015
Disposition: DONE
Description: Building Permit Application(F)
Date Completed: 3/10/2015
Disposition: DONE
Description: Issue Building Permit (F)
Date Completed: 3/10/2015
Disposition: DONE
Description: Up Front Review
Date Completed: 3/10/2015
Disposition: DONE
Description: Consistency Review-U
Date Completed: 3/6/2015
Disposition: DONE
Description: Updated/Add'l Info Recv'd
Date Completed: 2/25/2015
Disposition: DONE
Description: Consistency Review-U
Date Completed: 3/6/2015
Disposition: DONE
Description: Updated/Add'l Info Recv'd
Date Completed: 2/23/2015
Disposition:
Description: Building Permit Application(F)
Date Completed: 2/20/2015
Disposition: DONE
Description: Insp - Address Posted
Date Completed: 11/5/2015
Disposition: DONE
Description: Insp - Exterior Lighting
Date Completed:
Disposition:
Description: Insp - Parking
Date Completed: 3/25/2016
Disposition: FAIL
Description: Insp - Landscaping
Date Completed:
Disposition:
Description: Insp - Fire Protection
Date Completed: 11/5/2015
Disposition: FAIL
Description: Insp - Insulation: Ceiling
Date Completed: 7/26/2015
Disposition: DONE
Description: Insp - Insulation: Floors
Date Completed:
Disposition:
Description: Insp - Airseal
Date Completed: 7/14/2015
Disposition: DONE
Description: Insp - Insulation: Walls
Date Completed: 7/26/2015
Disposition: DONE
Description: Insp - Framing
Date Completed: 7/14/2015
Disposition: DONE
Description: Insp - Ext. Shear Wall Nailing
Date Completed: 6/29/2015
Disposition: DONE
Description: Insp - Straps (hold downs)
Date Completed: 6/29/2015
Disposition: DONE
Description: Insp - Foundation Stem Wall
Date Completed: 5/7/2015
Disposition: DONE
Description: Insp - Foundation Footing
Date Completed: 5/1/2015
Disposition: DONE
Description: Insp - Footing Drains
Date Completed:
Disposition:
Description: Insp - Setbacks
Date Completed: 5/1/2015
Disposition: DONE
Description: Insp - Erosion Control
Date Completed: 5/1/2015
Disposition: DONE
Description: DCD Review Time
Date Completed: 2/11/2015
Disposition: PEND
Description: Building Permit Application(F)
Date Completed: 2/5/2015
Disposition: DONE
Description: DRD Approval (Zoning)
Date Completed: 2/11/2015
Disposition: DONE
Description: Final Planning Approval
Date Completed: 2/11/2015
Disposition: DONE
Description: Septic System Finaled
Date Completed: 2/23/2015
Disposition: DONE
Description: Address Review Complete
Date Completed: 3/9/2015
Disposition: DONE
Description: RAP Review Complete-U
Date Completed: 3/9/2015
Disposition: DONE
Description: Consistency Review-U
Date Completed: 2/11/2015
Disposition: DONE
Description: Env. Sensitive Area Review-U
Date Completed: 2/11/2015
Disposition: DONE
Description: Stormwater Review-U
Date Completed: 2/11/2015
Disposition: DONE
Description: Contractor License/Bond Info
Date Completed: 2/5/2015
Disposition: DONE
Description: Plan Check
Date Completed: 2/13/2015
Disposition: DONE
Description: Septic Review Complete-U
Date Completed: 3/9/2015
Disposition: DONE
Description: App Substantially Complete-U
Date Completed: 2/11/2015
Disposition: DONE
Description: Case Entered
Date Completed: 2/5/2015
Disposition:

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: PLANNER
Wording DWJ

Title: SEPTIC
Wording The existing sewage transport line is less than 3 feet to this proposed building expansion. Locate prior to excavating and assure a minimum of 2 feet is maintained.

Title: BMPs
Wording The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.


Case Findings
Below is a list of findings for this permit case. Findings typically record facts that the staff are using as the basis of their permit processing decisions.
Title: F-Site Plan Changes
Wording The site plan as submitted with the February 5, 2015 application on ______________ has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated March 6, 2015 shall be resubmitted for review and approval by Jefferson County Department of Community Development.

Title: F-Approval for _____ Only
Wording This approval is for a Replacement Office Structure only. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits.