Permit Case Summary

Case Number: Search Help

Case Number:BLD2015-00030 Case Status:Finaled Date Received:2/3/2015
Description:DEMO PERMIT 4 BUILDING GARAGE & BARNS SEP11-00083 Date Issued:2/10/2015
Applicant: CHIMACUM DAIRY LLC A WA CORP Expiration Date:2/10/2016 12:00:00 AM
Site Address:124 CENTER RD Case Finaled:2/8/2016
Parcel No:901151004 Other Cases Parcel Data Map It More Details Parcels Images

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: Insp - Mechanical Systems
Date Completed: 2/8/2016
Disposition: DONE
Description: Insp - FINAL FINAL Building
Date Completed: 2/8/2016
Disposition: DONE
Description: Insp - Final Building
Date Completed: 2/8/2016
Disposition: DONE
Description: Propane Expiration Notice
Date Completed: 1/5/2016
Disposition: DONE
Description: Issue Install/Demo Permit (F)
Date Completed: 2/10/2015
Disposition: DONE
Description: Building Permit Application(F)
Date Completed: 2/3/2015
Disposition: DONE
Description: Septic Review Complete-U
Date Completed: 2/9/2015
Disposition: DONE
Description: Copy of OAPCA Demo Apprvl Recd
Date Completed: 2/3/2015
Disposition: DONE
Description: Contractor License/Bond Info
Date Completed: 2/3/2015
Disposition: DONE
Description: App Substantially Complete-U
Date Completed:
Disposition:
Description: Case Entered
Date Completed: 2/3/2015
Disposition:

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: DEMO - DECOMMISSION SEP TANK
Wording No evaluation of the septic system has been completed since 2011. This system is intended to be inspected annually. The proposed structures to be demolished are not plumbed. This approval for demolishing the garages and barn does not ensure future building approval. Any future onsite sewage system shall meet code in effect at the time of application and must be up to date with Operation and Monitoring inspections.