Permit Case Summary

Case Number: Search Help

Case Number:BLD2014-00413 Case Status:Finaled Date Received:11/7/2014
Description:I-502- INTERIOR REMODEL TO EXISTING AGRICULTURE BUILDING, TO INCLUDE A NEW 2ND FLOOR. (I-502) REVISION RECEIVED- 5/11/15 REVISION TO INCLUDE NEW BATHROOM- TWO NEW SINKS- AND NEW EXTERIOR STAIRS. Date Issued:8/5/2015
Applicant:JODI HOLT Expiration Date:8/5/2016 12:00:00 AM
Site Address:5030A EAGLEMOUNT RD Case Finaled:5/4/2016
Parcel No:801091002 Other Cases Parcel Data Map It More Details Parcels Images

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: File Archived
Date Completed: 8/6/2018
Disposition: DONE
Description: Insp - FINAL FINAL Building
Date Completed: 5/4/2016
Disposition: DONE
Description: Insp - Final Building
Date Completed: 5/4/2016
Disposition: DONE
Description: Insp - Address Posted
Date Completed: 5/4/2016
Disposition: DONE
Description: Insp - Final Building
Date Completed:
Disposition:
Description: Temporary Cert of Occupancy(F)
Date Completed: 12/23/2015
Disposition: DONE
Description: Insp - Gas Line: Exterior
Date Completed: 11/25/2015
Disposition: DONE
Description: Insp - Propane Tank
Date Completed: 11/25/2015
Disposition: DONE
Description: Updated/Add'l Info Recv'd
Date Completed: 10/5/2015
Disposition: DONE
Description: Insp - Wallboard Nailing
Date Completed:
Disposition:
Description: Insp - Int. Shear Wall Nailing
Date Completed:
Disposition:
Description: Insp - Int. Shear Wall Nailing
Date Completed:
Disposition:
Description: Insp - Miscellaneous
Date Completed:
Disposition:
Description: Insp - Straps (hold downs)
Date Completed:
Disposition:
Description: Insp - Foundation Footing
Date Completed: 8/6/2015
Disposition: DONE
Description: Issue Building Permit (F)
Date Completed: 8/5/2015
Disposition: DONE
Description: DRD Review Complete-U
Date Completed: 8/5/2015
Disposition:
Description: Plan Check
Date Completed: 8/4/2015
Disposition: DONE
Description: Return Status to Pending
Date Completed: 7/31/2015
Disposition:
Description: Updated/Add'l Info Recv'd
Date Completed: 7/31/2015
Disposition:
Description: Issue Building Permit (F)
Date Completed: 6/5/2015
Disposition: DONE
Description: DRD Review Complete-U
Date Completed: 6/4/2015
Disposition: DONE
Description: WRIA 17 Instr Flow Req
Date Completed: 6/4/2015
Disposition: DONE
Description: Potable Water Approval
Date Completed: 6/4/2015
Disposition: DONE
Description: Updated/Add'l Info Recv'd
Date Completed: 5/26/2015
Disposition: DONE
Description: Additional Info Request-EH
Date Completed: 6/4/2015
Disposition: DONE
Description: Insp - Miscellaneous
Date Completed:
Disposition:
Description: Insp - Miscellaneous
Date Completed:
Disposition:
Description: Insp - Miscellaneous
Date Completed:
Disposition:
Description: Insp - Exterior Lighting
Date Completed:
Disposition:
Description: Insp - Parking
Date Completed:
Disposition:
Description: Insp - Smoke & CO
Date Completed:
Disposition:
Description: Insp - Insulation: Ceiling
Date Completed: 9/22/2015
Disposition: DONE
Description: Insp - Insulation: Floors
Date Completed: 9/22/2015
Disposition: DONE
Description: Insp - Insulation: Walls
Date Completed: 9/22/2015
Disposition: DONE
Description: Insp - Framing
Date Completed: 9/9/2015
Disposition: DONE
Description: Insp - Rough-in Plumbing
Date Completed: 9/9/2015
Disposition: DONE
Description: Building Permit Application(F)
Date Completed: 5/11/2015
Disposition: DONE
Description: Updated/Add'l Info Recv'd
Date Completed: 5/11/2015
Disposition:
Description: Additional Info Request-EH
Date Completed: 6/4/2015
Disposition: DONE
Description: A Clock Interrupt
Date Completed: 6/4/2015
Disposition: DONE
Description: Additional Info Request-BLD
Date Completed: 5/12/2015
Disposition: DONE
Description: Additional Info Request-EH
Date Completed: 6/4/2015
Disposition: DONE
Description: Building Permit Application(F)
Date Completed: 11/7/2014
Disposition: DONE
Description: DRD Approval (Zoning)
Date Completed: 6/1/2015
Disposition: DONE
Description: Final Planning Approval
Date Completed: 4/20/2016
Disposition: DONE
Description: Final Public Works Approval
Date Completed: 6/4/2015
Disposition: DONE
Description: Septic System Finaled
Date Completed: 12/8/2015
Disposition: DONE
Description: Address Review Complete
Date Completed: 11/7/2014
Disposition: DONE
Description: RAP Review Complete-U
Date Completed: 11/12/2014
Disposition: DONE
Description: Consistency Review-U
Date Completed: 6/4/2015
Disposition: DONE
Description: Env. Sensitive Area Review-U
Date Completed: 6/1/2015
Disposition: DONE
Description: Stormwater Review-U
Date Completed: 6/4/2015
Disposition: DONE
Description: Contractor License/Bond Info
Date Completed: 6/4/2015
Disposition: DONE
Description: Public Works Review
Date Completed: 6/4/2015
Disposition: DONE
Description: Plan Check
Date Completed: 5/12/2015
Disposition: DONE
Description: Septic Review Complete-U
Date Completed: 6/4/2015
Disposition: DONE
Description: App Substantially Complete-U
Date Completed:
Disposition:
Description: Case Entered
Date Completed: 11/7/2014
Disposition:

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: MARIJUANA APPROVAL
Wording JCPH approval for the septic system connection is approved based on the growing operation using soil as the growing medium. The use of hydroponic or water based growing media IS NOT approved.

Title: NO EDIBLES
Wording JCPH approval is based on the proponent’s statement that no processing of 'edibles' will be taking place on the premises. If production of 'edibles' is proposed at a later date further review is required to determine if there is adequate capacity in the onsite sewage system. Water use information and waste strength testing will be required prior to further review and approval.

Title: SEPTIC CAPACITY
Wording Per septic permit SEP14-148 exceeding the permitted design flow of 600 gal/day max. or 430 Gal/day average, for approximately 7 employees, shall constitute a violation of this permit. Water usage monitoring shall be monitored monthly. These monitoring results shall be submitted to the Jefferson County Health Dept. no less than quarterly.

Title: F-WRIA EXEMPT
Wording The existing well for this development lies within the WRIA 17. Per Washington State Department of Ecology consultation on ____march 9, 2015__, documentation has been provided to support a determination that the well is exempted and not subject to the in-stream flow rule for domestic use, metering, and exempt well irrigation. Ecology has recommended metering be installed to verify use from each of the sources.