Description:
|
| | |
Insp - FINAL FINAL Building
|
|
Date Completed:
|
| | |
1/29/2016
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Updated/Add'l Info Recv'd
|
|
Date Completed:
|
| | |
1/22/2016
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Inspection Reminder Sent
|
|
Date Completed:
|
| | |
12/8/2015
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Issue Building Permit (F)
|
|
Date Completed:
|
| | |
1/23/2015
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
DRD Review Complete-U
|
|
Date Completed:
|
| | |
1/21/2015
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
A Clock Interrupt
|
|
Date Completed:
|
| | |
1/21/2015
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Additional Info Request-EH
|
|
Date Completed:
|
| | |
1/21/2015
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Final Building
|
|
Date Completed:
|
| | |
1/28/2016
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Framing
|
|
Date Completed:
|
| | |
1/28/2016
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Foundation Footing
|
|
Date Completed:
|
| | |
2/25/2015
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Setbacks
|
|
Date Completed:
|
| | |
2/25/2015
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Updated/Add'l Info Recv'd
|
|
Date Completed:
|
| | |
11/17/2014
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Building Permit Application(F)
|
|
Date Completed:
|
| | |
10/23/2014
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
DRD Approval (Zoning)
|
|
Date Completed:
|
| | |
12/17/2014
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Final Planning Approval
|
|
Date Completed:
|
| | |
1/21/2015
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Septic System Finaled
|
|
Date Completed:
|
| | |
1/21/2015
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Consistency Review-U
|
|
Date Completed:
|
| | |
12/17/2014
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Env. Sensitive Area Review-U
|
|
Date Completed:
|
| | |
12/17/2014
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Stormwater Review-U
|
|
Date Completed:
|
| | |
12/17/2014
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Contractor License/Bond Info
|
|
Date Completed:
|
| | |
10/23/2014
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Plan Check
|
|
Date Completed:
|
| | |
11/18/2014
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Case Entered
|
|
Date Completed:
|
| | |
10/23/2014
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Septic Review Complete-U
|
|
Date Completed:
|
| | |
1/21/2015
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
App Substantially Complete-U
|
|
Date Completed:
|
| | |
|
|
Disposition:
|
| | |
|
|
|
Title:
|
| | |
SEWAGE TRANSPORT LINE
|
|
Wording
|
| | |
Sewage transport line is proposed less than 2' to the foundation as required by WAC246-272A. Approval of the plan is based on an application for a waiver from the standard based on information submitted by Everett Sorensen, P.E. A condition of the waiver approval is that if the line is exposed during the construction and thus does not meet the conditions described by Mr. Sorenson it shall be relocated to meet the required 2' setback from the foundation or if damaged or found to be crushed in the future the pipe shall be moved to meet the minimum 2' required setback.
|
|
|
Title:
|
| | |
INITIALS
|
|
Wording
|
| | |
jmp
|
|
|
Title:
|
| | |
NO SHOOTING ZONE
|
|
Wording
|
| | |
The project is within the Chimacum-Hadlock No Shooting Zone.
|
|
|
Title:
|
| | |
BMPs
|
|
Wording
|
| | |
The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.
|
|
|
Title:
|
| | |
NO PLUMBING REVWD OR APPRVD
|
|
Wording
|
| | |
No plumbing has been reviewed or approved for this project by Jefferson County Public Health. Additional requirements may apply if plumbing is proposed.
|
|