|
Description:
|
| | |
Certificate of Occupancy-F
|
|
Date Completed:
|
| | |
12/16/2014
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - FINAL FINAL Building
|
|
Date Completed:
|
| | |
12/16/2014
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Final Building
|
|
Date Completed:
|
| | |
12/16/2014
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Issue Mobile Home Permit (F)
|
|
Date Completed:
|
| | |
9/18/2014
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Issue Mobile Home Permit (F)
|
|
Date Completed:
|
| | |
9/18/2014
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Septic System Finaled
|
|
Date Completed:
|
| | |
6/9/1989
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Address Posted
|
|
Date Completed:
|
| | |
11/18/2014
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Drywell/Alt Drainage
|
|
Date Completed:
|
| | |
11/18/2014
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Skirting & Ventilation
|
|
Date Completed:
|
| | |
11/18/2014
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Blocking & Tie Down
|
|
Date Completed:
|
| | |
10/22/2014
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - MH Foundation
|
|
Date Completed:
|
| | |
9/25/2014
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Setbacks
|
|
Date Completed:
|
| | |
9/25/2014
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Add Manufactured Home Insp Set
|
|
Date Completed:
|
| | |
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Issue Mobile Home Permit (F)
|
|
Date Completed:
|
| | |
9/18/2014
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
DRD Review Complete-U
|
|
Date Completed:
|
| | |
9/18/2014
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
DCD Review Time
|
|
Date Completed:
|
| | |
9/17/2014
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Up Front Review
|
|
Date Completed:
|
| | |
9/18/2014
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Updated/Add'l Info Recv'd
|
|
Date Completed:
|
| | |
9/11/2014
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
A Clock Interrupt
|
|
Date Completed:
|
| | |
9/11/2014
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Additional Info Request-DRD
|
|
Date Completed:
|
| | |
9/11/2014
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
A Clock Interrupt
|
|
Date Completed:
|
| | |
9/17/2014
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Additional Info Request-EH
|
|
Date Completed:
|
| | |
9/17/2014
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Septic System Finaled
|
|
Date Completed:
|
| | |
6/9/1998
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Mobile Home Install App (F)
|
|
Date Completed:
|
| | |
8/7/2014
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Address Review Complete
|
|
Date Completed:
|
| | |
9/17/2014
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
RAP Review Complete-U
|
|
Date Completed:
|
| | |
8/11/2014
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Consistency Review-U
|
|
Date Completed:
|
| | |
9/17/2014
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Env. Sensitive Area Review-U
|
|
Date Completed:
|
| | |
9/17/2014
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Stormwater Review-U
|
|
Date Completed:
|
| | |
9/17/2014
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Contractor License/Bond Info
|
|
Date Completed:
|
| | |
8/7/2014
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Case Entered
|
|
Date Completed:
|
| | |
8/7/2014
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Septic Review Complete-U
|
|
Date Completed:
|
| | |
9/18/2014
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
App Substantially Complete-U
|
|
Date Completed:
|
| | |
9/17/2014
|
|
Disposition:
|
| | |
DONE
|
|
|
Title:
|
| | |
SEPTIC TANK LOCATION
|
|
Wording
|
| | |
Existing septic tank location may not be approved for any future building permit due to it's location in open space.
|
|
|
Title:
|
| | |
NO SHOOTING AREA
|
|
Wording
|
| | |
This parcel is within a no shooting area per JCC 8.50.
|
|
|
Title:
|
| | |
PLAT CONDITION 3
|
|
Wording
|
| | |
Th dedicated open space for this mobile home park is all of the platted property except those portions lying within the easement for ingress, egress, and utility purposes, lots 1 thru 45, the self storage area and the area for future use/private park/recreational facilities. Open space will remain dedicated for that use as long as this property remains in use as a mobile home park. Upon vacation of this plat, dedicated open space areas shall immediately revert to the owner of the vacated plat. All areas of undistrubed natural vegetation within the open space dedication shall remain undistrubed. Lot leases and/or owners shall have legal access and the right to use dedicated open space areas.
|
|
|
Title:
|
| | |
PLAT CONDITION 6
|
|
Wording
|
| | |
The 25-foot wide buffer shall remain in its naturally vegetated condition. No constructed or erected facilities shall be placed within this buffer with the exception of utility lines, fencing or security posts. This includes the exterior of lots 1-6, 14-26, and 43-45.
|
|
|
Title:
|
| | |
INITIALS
|
|
Wording
|
| | |
AWB
|
|
|
Title:
|
| | |
APPROVAL FOR _____ ONLY
|
|
Wording
|
| | |
This approval is for a building permit for a new manufactured home only. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits.
|
|
|
Title:
|
| | |
SITE PLAN CHANGES
|
|
Wording
|
| | |
The revised site plan as submitted with the building application application on September 11, 2014 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated September 17, 2014 shall be resubmitted for review and approval by Jefferson County Department of Community Development.
|
|
|
Title:
|
| | |
Aquifer Recharge Conditions (SFR)
|
|
Wording
|
| | |
Critical Aquifer Recharge Areas may require special protection measures to mitigate water quality degradation. The submitted proposal does not require additional aquifer protection measures. However, during construction the project shall follow the Best Management Practices (BMPs) and facility design standards as identified and defined in the Stormwater Management Manual for the Puget Sound Basin.
|
|
|
Title:
|
| | |
BMPs
|
|
Wording
|
| | |
The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.
|
|