Case Number:BLD2010-00379 Case Status:Finaled Date Received:11/4/2010
Description:STORMWATER PERMIT - for Phase I collection system within the Park Date Issued:1/3/2011
Applicant: WASHINGTON STATE PARKS Expiration Date:1/3/2012 12:00:00 AM
Site Address:SR 116 Case Finaled:5/1/2017
Parcel No:502021001 Other Cases Parcel Data Map It More Details

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: Close Case "F"
Date Completed: 5/1/2017
Disposition: DONE
Description: Inspection Reminder Sent (2nd)
Date Completed: 3/31/2017
Disposition:
Description: Inspection Reminder Sent (1st)
Date Completed: 3/31/2017
Disposition:
Description: File Archived
Date Completed: 1/9/2013
Disposition: DONE
Description: Issue Building Permit (F)
Date Completed: 1/3/2011
Disposition: DONE
Description: Approve Permit-UF
Date Completed: 11/30/2010
Disposition: DONE
Description: Review Complete-U
Date Completed: 11/30/2010
Disposition: DONE
Description: App Substantially Complete-U
Date Completed: 11/5/2010
Disposition: DONE
Description: Case Entered
Date Completed: 11/4/2010
Disposition:
Description: Plan Check
Date Completed: 11/5/2010
Disposition: DONE
Description: Stormwater Review-U
Date Completed: 11/5/2010
Disposition: DONE
Description: Env. Sensitive Area Review-U
Date Completed: 11/5/2010
Disposition: DONE
Description: Consistency Review-U
Date Completed: 11/5/2010
Disposition: DONE

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: BMPs
Wording The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.

Title: Stormwater Plan
Wording A Stormwater Plan has been submitted and approved by the Department of Community Development. Once the subject permit has been issued the applicant shall fully implement the provisions of the submitted plan No clearing for roadways or utilities shall occur on the project site until clearing necessary for the installation of temporary sedimentation and erosion control measures have been completed.


Case Findings
Below is a list of findings for this permit case. Findings typically record facts that the staff are using as the basis of their permit processing decisions.
Title: F-SDP APPROVAL & FINDINGS
Wording See MLA10-00139 for SDP approval and findings.

Title: F-Medium Stormwater
Wording The applicant is proposing to create or add zero square feet of impervious surface and 15,000 square feet of land disturbing activities. JCC 18.30.060 and 18.30.070 require the project applicant submit a stormwater plan meeting Minimum Requirements #1 through #5 of the Department of Ecology Stormwater Management Manual for Western Washington. The stormwater plan shall address measures to control stormwater, erosion and sediment during construction and shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.

Title: F-Site Plan Changes
Wording The site plan as submitted with the Stormwater Management Permit application on November 4, 2010 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated November 5, 2010 shall be resubmitted for review and approval by Jefferson County Department of Community Development.

Title: F-Approval for _____ Only
Wording This approval is for a Stormwater Management for in-Park sewage collection system only. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits.

Title: F-General PMT Notice
Wording NOTICE: This permit does not excuse the proponent from complying with other local, state, and federal ordinances, regulations, or statutes applicable to the proposed development, but consistent with RCW 90.58. Development pursuant to this permit shall be undertaken subject to the applicable policies and performance standards of the Jefferson County Shoreline Management Master Program and the Jefferson County Unified Development Code. If during excavation or development of the site an area of potential archaeological significance is uncovered, all activity in the immediate area shall be halted, and the Administrator shall be notified at once. The Federal Endangered Species Act rules to protect threatened Chinook and Summer-run Chum salmon became effective on January 8, 2001. Bull trout have been listed as threatened since early 2000. Under the ESA, any person may bring lawsuit against any individual or agency that "takes" listed species (defined as causing harm, harassing, or damaging habitat for the listed species). In addition, the National Marine Fisheries Service can levy penalties. All areas in Jefferson County are included as "critical habitat" for a listed species. Development of property along any marine shoreline, freshwater shoreline, or floodplains could harm habitat if protective measures are not taken. To minimize the potential to damage habitat, all property owners developing adjacent to marine shoreline, freshwater shoreline, or floodplains are advised to do the following: - All development activities should avoid unstable slopes, wetlands, and forested areas near surface waters - Remove minimal vegetation for site development, especially large trees - Allow trees that have fallen into surface waters to remain there - Infiltrate stormwater from buildings and driveways onsite through drywells rather than discharging directly into surface waters or roadside ditches Any individual, group, or agency can bring suit for a listed species "taking", even if you are in compliance with Jefferson County development codes. The risk of a lawsuit against you can be reduced by consulting with a professional fisheries habitat biologist, and following the recommendations for site development provided by the biologist. For more information, contact the National Marine Fisheries Service in Seattle, or the U.S. Fish and Wildlife Service.