Case Number:BLD2010-00363 Case Status:Finaled Date Received:10/13/2010
Description:NEW BOAT CONSTRUCTION SHOP Date Issued:1/18/2011
Applicant: NORTHWEST SCHOOL OF WOODEN Expiration Date:1/18/2014 12:00:00 AM
Site Address:163 LOWER HADLOCK RD Case Finaled:9/25/2013
Parcel No:901013016 Other Cases Parcel Data Map It More Details Parcels Images

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: Certificate of Occupancy-F
Date Completed: 10/1/2013
Disposition: DONE
Description: Insp - FINAL FINAL Building
Date Completed: 9/25/2013
Disposition: DONE
Description: Temporary Cert of Occupancy(F)
Date Completed: 8/16/2013
Disposition: DONE
Description: Temporary Cert of Occupancy(F)
Date Completed: 8/16/2013
Disposition: DONE
Description: Change Status to RENEWED
Date Completed: 1/8/2013
Disposition: DONE
Description: Inspection Reminder Sent
Date Completed: 12/17/2012
Disposition: DONE
Description: Change Status to RENEWED
Date Completed: 1/12/2012
Disposition: DONE
Description: Inspection Reminder Sent
Date Completed: 1/5/2012
Disposition: DONE
Description: Temporary Cert of Occupancy(F)
Date Completed:
Disposition:
Description: Insp - Miscellaneous
Date Completed: 4/12/2011
Disposition: DONE
Description: Insp - Final Building
Date Completed: 9/25/2013
Disposition: DONE
Description: Insp - Foundation Footing
Date Completed: 3/18/2011
Disposition: DONE
Description: Issue Building Permit (F)
Date Completed: 1/18/2011
Disposition: DONE
Description: Approve Permit-UF
Date Completed: 1/18/2011
Disposition: DONE
Description: Review Complete-U
Date Completed: 1/18/2011
Disposition: DONE
Description: Insp - Miscellaneous
Date Completed: 4/11/2011
Disposition: DONE
Description: Insp - Miscellaneous
Date Completed: 4/11/2011
Disposition: DONE
Description: Insp - Miscellaneous
Date Completed: 4/11/2011
Disposition: DONE
Description: Insp - Wallboard Nailing
Date Completed: 4/11/2011
Disposition: DONE
Description: Insp - Wallboard Nailing
Date Completed: 4/11/2011
Disposition: DONE
Description: Insp - Address Posted
Date Completed: 4/11/2011
Disposition: DONE
Description: Insp - Exterior Lighting
Date Completed: 4/11/2011
Disposition: DONE
Description: Insp - Mechanical Systems
Date Completed: 4/11/2011
Disposition: DONE
Description: Insp - Insulation: Ceiling
Date Completed: 3/18/2011
Disposition: DONE
Description: Insp - Insulation: Floors
Date Completed: 3/18/2011
Disposition: DONE
Description: Insp - Insulation: Walls
Date Completed: 3/18/2011
Disposition: DONE
Description: Insp - Framing
Date Completed: 3/18/2011
Disposition: DONE
Description: Insp - Fire Protection
Date Completed: 11/10/2010
Disposition: DONE
Description: Insp - Miscellaneous
Date Completed: 12/2/2010
Disposition: DONE
Description: Insp - Rough-in Plumbing
Date Completed: 11/29/2010
Disposition: DONE
Description: Insp - Underground Plumbing
Date Completed: 11/29/2010
Disposition: DONE
Description: Insp - Footing Drains
Date Completed: 11/18/2010
Disposition: DONE
Description: Insp - Foundation Footing
Date Completed: 11/16/2010
Disposition: DONE
Description: Insp - Setbacks
Date Completed: 11/10/2010
Disposition: DONE
Description: Building Permit Application(F)
Date Completed: 10/13/2010
Disposition: DONE
Description: App Substantially Complete-U
Date Completed: 11/19/2010
Disposition: DONE
Description: Case Entered
Date Completed: 10/13/2010
Disposition:
Description: Plan Check
Date Completed: 12/27/2010
Disposition: DONE
Description: Septic Review Complete-U
Date Completed: 1/14/2011
Disposition: DONE
Description: Potable Water Approval
Date Completed: 10/13/2010
Disposition: DONE
Description: Contractor License/Bond Info
Date Completed: 10/13/2010
Disposition: DONE
Description: Stormwater Review-U
Date Completed: 12/27/2010
Disposition: DONE
Description: Env. Sensitive Area Review-U
Date Completed: 1/18/2011
Disposition: DONE
Description: Consistency Review-U
Date Completed: 1/18/2011
Disposition: DONE
Description: RAP Review Complete-U
Date Completed: 12/22/2010
Disposition: DONE
Description: Final Planning Approval
Date Completed:
Disposition:
Description: Final Public Works Approval
Date Completed: 10/1/2013
Disposition: DONE
Description: DRD Approval (Zoning)
Date Completed: 1/18/2011
Disposition: DONE

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: Bld Storage of inflammable liquid
Wording The storage and handling of inflammable liquids, liquified petroleum, gases and explosives shall comply with rules and regulations falling under the jurisdiction of the fire marshal, the laws of the state and other local ordinances. Bulk storage of inflammable liquids below ground shall be located no closer to the property line than the greatest dimension (diameter, length, or height) of the tank.

Title: Bld Noise
Wording The intensity of sound emitted by any commercial or industrial activity shall not exceed levels estabished by the Washington State Department of Ecology under WAC 173-60, and by Jefferson County under Resolution No. 67-85, "Establishment of Environmental Designations for Noise Abatement Areas for Jefferson County."

Title: Bld Noise Abatement
Wording All noise emitting machinery that cannot in any other way operate below the maximum permitted noise level shall be housed in a sound-attenuating structure.

Title: Bld Access design
Wording All ingress/egress to a parking lot containing 4 or more parking spaces shall be developed so vehicles entering and leaving the parking lot are traveling in a forward motion.

Title: Bld Security/hooded lights
Wording Lighting fixtures shall be designed and hooded to prevent the light source from being directly visible from outside the boundaries of the property. The intensity or brightness of all lighting, during construction and after project completion shall not adversely affect the use of surrounding properties or adjoining rights-of-way.

Title: Bld Exterior height lights
Wording Exterior lighting for commercial and industrial uses shall not exceed thirty feet (30') in height from the finished grade. Exterior lighting for residential uses shall not exceed twenty feet (20') in height from the finished grade, excepting when such lighting is an integral part of a building or structure. Ground level lighting is encouraged.

Title: Bld Exterior flashing lights
Wording Exterior flashing, moving, or blinking lighting is prohibited, except as required by local, state, or federal standards.

Title: Bld Setbacks
Wording Building setbacks from Lower Hadlock Road are no less than 20 feet. Side and rear setbacks are 5 feet from RVC Commercial property and 35 feet from Residential property.

Title: Bld building height
Wording The building height is not to exceed 35 feet.

Title: Bld lot coverage
Wording Maximum lot coverage is not to exceed 60%. Lot coverage is defined as amount of impervious surface which includes roof tops, driveways, concrete, etc.

Title: WATER LINE/SEWER LINE SEPARATION
Wording A 10' separation is required between the water lines and all onsite sewage system components.

Title: HOLD-SEPTIC TRANSPORT LINE
Wording The transport line permitted under SEP10-00146 shall be finaled and all conditions met prior to final approval of the building.

Title: CONTACT PUBLIC WORKS
Wording The proponent shall contact the Jefferson County Public Works Department at (360) 385-9160 for an inspection prior to backfilling the stormwater infiltration trenches.

Title: SWT MAINTENANCE AGREEMENT
Wording " In order to meet the requirements of the Jefferson County Unified Development Code and the Washington Department of Ecology Stormwater Management Manual for Western Washington Minimum Requirement #10 Operation and Maintenance and to ensure that the approved stormwater management facilities are appropriately maintained for the life of the project, Jefferson County requires the proponent to enter into a Stormwater Management Facility Maintenance Agreement with the County. The Department will send a copy of the Agreement that has been signed by the Public Works Director to the proponent. Prior to final project approval, the proponent shall sign the Agreement before a notary and file it with the Jefferson County Auditor.

Title: BMPs
Wording The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.

Title: Stormwater Plan
Wording A Stromwater Plan has been submitted and approved by the Department of Community Development. Once the subject permit has been issued the applicant shall fully implement the provisions of the submitted plan and contact the Jefferson County Department of Community Development to arrange a schedule to inspect the property for plan compliance. A Certificate of Occupancy will not be issued until the Department verifies plan compliance. No clearing for roadways or utilities shall occur on the project site until clearing necessary for the installation of temporary sedimentation and erosion control measures have been completed.


Case Findings
Below is a list of findings for this permit case. Findings typically record facts that the staff are using as the basis of their permit processing decisions.
Title: F-ZONING APPROVAL
Wording See MLA10-00303 for zoning approval and Hearing Examiner Decision dated October 18, 2010 for findings.

Title: F-ROAD APPROACH
Wording The existing road approach was approved under RAP04-00045.

Title: F-Large Stormwater
Wording The applicant is proposing to create or add 9,000 square feet of impervious surface and 11,000 square feet of land disturbing activities. JCC 18.30.060 and 18.30.070 require the project applicant submit a stormwater plan meeting Minimum Requirements #1 through #10 of the Department of Ecology Stormwater Management Manual for Western Washington. The stormwater plan shall address measures to control stormwater, erosion and sediment during construction and shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.

Title: F-Site Plan Changes
Wording The site plan as submitted with the Building Permit application on October 13, 2010 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated December 13, 2010 shall be resubmitted for review and approval by Jefferson County Department of Community Development.

Title: F-Approval for _____ Only
Wording This approval is for a New 4,800 Square Foot Boat Construction Builidng with associated Vista Parking for 37 cars only. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits.

Title: F-General PMT Notice
Wording NOTICE: This permit does not excuse the proponent from complying with other local, state, and federal ordinances, regulations, or statutes applicable to the proposed development, but consistent with RCW 90.58. Development pursuant to this permit shall be undertaken subject to the applicable policies and performance standards of the Jefferson County Shoreline Management Master Program and the Jefferson County Unified Development Code. If during excavation or development of the site an area of potential archaeological significance is uncovered, all activity in the immediate area shall be halted, and the Administrator shall be notified at once. The Federal Endangered Species Act rules to protect threatened Chinook and Summer-run Chum salmon became effective on January 8, 2001. Bull trout have been listed as threatened since early 2000. Under the ESA, any person may bring lawsuit against any individual or agency that "takes" listed species (defined as causing harm, harassing, or damaging habitat for the listed species). In addition, the National Marine Fisheries Service can levy penalties. All areas in Jefferson County are included as "critical habitat" for a listed species. Development of property along any marine shoreline, freshwater shoreline, or floodplains could harm habitat if protective measures are not taken. To minimize the potential to damage habitat, all property owners developing adjacent to marine shoreline, freshwater shoreline, or floodplains are advised to do the following: - All development activities should avoid unstable slopes, wetlands, and forested areas near surface waters - Remove minimal vegetation for site development, especially large trees - Allow trees that have fallen into surface waters to remain there - Infiltrate stormwater from buildings and driveways onsite through drywells rather than discharging directly into surface waters or roadside ditches Any individual, group, or agency can bring suit for a listed species "taking", even if you are in compliance with Jefferson County development codes. The risk of a lawsuit against you can be reduced by consulting with a professional fisheries habitat biologist, and following the recommendations for site development provided by the biologist. For more information, contact the National Marine Fisheries Service in Seattle, or the U.S. Fish and Wildlife Service.