Description:
|
| | |
CANCEL BUILDING PERMIT
|
|
Date Completed:
|
| | |
12/1/2014
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
File Archived
|
|
Date Completed:
|
| | |
2/17/2012
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
EXPIRED PERMIT
|
|
Date Completed:
|
| | |
2/8/2012
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Inspection Reminder Sent
|
|
Date Completed:
|
| | |
7/13/2011
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Inspection Reminder Sent
|
|
Date Completed:
|
| | |
6/22/2011
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Inspection Reminder Sent
|
|
Date Completed:
|
| | |
5/3/2011
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Issue Building Permit (F)
|
|
Date Completed:
|
| | |
6/7/2010
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Approve Permit-UF
|
|
Date Completed:
|
| | |
6/3/2010
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Approve Permit-UF
|
|
Date Completed:
|
| | |
6/3/2010
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Approve Permit-UF
|
|
Date Completed:
|
| | |
6/3/2010
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Review Complete-U
|
|
Date Completed:
|
| | |
6/3/2010
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Miscellaneous
|
|
Date Completed:
|
| | |
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Insp - Final Building
|
|
Date Completed:
|
| | |
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Building Permit Application(F)
|
|
Date Completed:
|
| | |
3/25/2010
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
App Substantially Complete-U
|
|
Date Completed:
|
| | |
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Case Entered
|
|
Date Completed:
|
| | |
3/25/2010
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Plan Check
|
|
Date Completed:
|
| | |
4/7/2010
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Contractor License/Bond Info
|
|
Date Completed:
|
| | |
3/25/2010
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Stormwater Review-U
|
|
Date Completed:
|
| | |
6/3/2010
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Env. Sensitive Area Review-U
|
|
Date Completed:
|
| | |
6/3/2010
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Consistency Review-U
|
|
Date Completed:
|
| | |
6/3/2010
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Final Planning Approval
|
|
Date Completed:
|
| | |
6/3/2010
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Final Public Works Approval
|
|
Date Completed:
|
| | |
6/3/2010
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
DRD Approval (Zoning)
|
|
Date Completed:
|
| | |
6/3/2010
|
|
Disposition:
|
| | |
DONE
|
|
|
Title:
|
| | |
TF-Expenses
|
|
Wording
|
| | |
The applicant shall be responsible for all direct and indirect expenses incurred related to review and compliance with conditions of approval. All fees shall be as authorized by County Ordinance.
|
|
|
Title:
|
| | |
TF-Removal
|
|
Wording
|
| | |
If an abandoned facility is not removed within 180 days or a longer period of time determined in writing by the Director, the County shall have the authority to enter the property and remove the facilities. All reasonable and documented costs of such removal shall be charged to the provider and/or landowner of record.
|
|
|
Title:
|
| | |
TF-Emergency Response
|
|
Wording
|
| | |
Prior to operation of the telecommunication facilities, the applicant shall document that the system has been integrated into the County's Emergency Response System as required by Section 18.42.050. The applicant shall officially certify that they have the capacity to meet FCC mandate that all the industry must be able to locate a wireless telephone when it dials 911.
|
|
|
Title:
|
| | |
SIGNS, SYMBOLS
|
|
Wording
|
| | |
Signs, symbols, flags, banners or other devices shall not be attached to or painted or inscribed upon any tower or antenna; provided, that the flags of the United States and the state of Washington may be flown from towers and antennas disguised as flag poles.
A telephone number and person to call for information or in the event of an emergency shall be posted at the site.
|
|
|
Title:
|
| | |
NOISE
|
|
Wording
|
| | |
Noise generated by a wireless facility shall not exceed the maximum environmental noise levels set forth in Chapter 173-60 WAC as it is now in effect or hereafter amended.
|
|
|
Title:
|
| | |
CUP CONDITIONS
|
|
Wording
|
| | |
A Type II Conditional Use Permit was issued for the cell tower. The applicant shall adhere to all conditions stipulated through ZON03-00058.
|
|
|
Title:
|
| | |
LIGHTING
|
|
Wording
|
| | |
Lighting shall be in conformance with applicable FAA and FCC policies and approval.
|
|
|
Title:
|
| | |
VEGETATION/LANDSCAPE
|
|
Wording
|
| | |
Existing plant materials located on and off the lease site shall be preserved to ensure that the tower and related equipment are sufficiently concealed from ground level, adjacent properties and viewscapes. If it is not possible to achieve adequate screening by preserving existing vegetation on the site, the applicant shall lease or secure an easement for additional land to preserve existing significant vegetation or to allow the planting of additional vegetation.
|
|
|
Title:
|
| | |
ABANDONED IF NOT USED
|
|
Wording
|
| | |
In the event the wireless telecommunication facility is unused for a period of 180 consecutive days will be declared abandoned by the County. The property owner shall remove abandoned facilities within 180 days from the date of abandonment. Failure to remove an abandoned facility shall be considered a public nuisance subject to penalties.
If an abandoned facility is not removed within 180 days or a longer period of time determined in writing by the Administrator, the County shall have the authority to enter the property and remove the facilities. All reasonable and documented costs of such removal shall be charged to the provider and/or landowner of record.
Upon written application, prior to the expiration of the 180-day period, the Administrator shall in writing grant a 180-day extension for reuse of the facility. Additional extensions beyond the first 180 day extension may be granted by the Administrator, subject to any conditions required to bring the project or facility into compliance with current law(s) and make it compatible with surrounding development.
|
|
|
Title:
|
| | |
KNOX BOX
|
|
Wording
|
| | |
A knox box key access shall be provided by the applicant.
|
|
|
Title:
|
| | |
RESCUE TEAM
|
|
Wording
|
| | |
A high angle rescue team shall be provided by the applicant when work is being conducted on the tower.
|
|
|
Title:
|
| | |
ROAD ACCESS
|
|
Wording
|
| | |
Road access shall be accessible for emergency vehicles.
|
|
|
Title:
|
| | |
CODES
|
|
Wording
|
| | |
Construction of the wireless telecommunication facilities is subject to the requirements of the County Building Code, Chapter 15.05 JCC, and all Building Code (IBC), the Electrical Code (NEC), the requirements of the National Electronics Industries Association/Telecommunications Industries Association (EIA/TIA) 222 Revision F Standard entitled "Structural Standards for Steel Antenna Supporting Structures" and any additional applicable standards published by the Electronics Industries Association, the Uniform Fire Code and the Jefferson County Unified Development Code.
|
|
|
Title:
|
| | |
SECURITY LIGHTING
|
|
Wording
|
| | |
Security lighting for the equipment enclosure shall be minimized. Any newly installed security lighting shall be oriented downward and shielded so that light falls only within the boundaries of the property and shall be triggered only by a motion sensor.
|
|
|
Title:
|
| | |
CARE OF FACILITY
|
|
Wording
|
| | |
The applicant shall protect the facility from unauthorized access consistent with the purpose of protecting the public health, safety and welfare. Co-applicants shall maintain the facility in a good and safe condition and preserve its original appearance and concealment or camouflage elements incorporated into the design at the time of approval. Maintenance shall include, but not be limited to, such items as painting, structural repair, repair of equipment and maintenance of landscaping.
|
|
|
Title:
|
| | |
FCC
|
|
Wording
|
| | |
If the applicant transfers, assigns, or subleases a wireless communication facility, a copy of the land use agreement and FCC license shall be submitted in writing to the Director, as well as the name and telephone number of a person responsible for the facility, who is capable of responding immediately.
|
|
|
Title:
|
| | |
F-APPROVED ON ZON03-00058
|
|
Wording
|
| | |
The 150 ft. monopole was approved under ZON03-00058 on November 20, 2003 and finalled on January 24, 2006.
|
|
|
Title:
|
| | |
F-ADDRESS
|
|
Wording
|
| | |
An address of 313 Elkhound Pass Road, Quilcene has been assigned to the tower. Elkhound Pass Road is private (P377).
|
|
|
Title:
|
| | |
F-DNS Issued
|
|
Wording
|
| | |
This proposal was reviewed under the State Environmental Policy Act (SEPA) by Jefferson County acting as lead agency in conjunction of ZON03-00058 and BLD03-00545. Determination of Non-Significance (DNS) issued on October 9, 2003.
|
|
|
Title:
|
| | |
F-Site Plan Changes
|
|
Wording
|
| | |
The site plan as submitted on March 25, 2010 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated June 3, 2010 shall be resubmitted for review and approval by Jefferson County Department of Community Development.
|
|
|
Title:
|
| | |
F-Approval for _____ Only
|
|
Wording
|
| | |
This approval is for a add 3 panel antennas, 6 TMA's, 6 diplexors, replace coax cable lines, add UMTS cabinet & ret system only. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits.
|
|
|
Title:
|
| | |
F-General PMT Notice
|
|
Wording
|
| | |
NOTICE: This permit does not excuse the proponent from complying with other local, state, and federal ordinances, regulations, or statutes applicable to the proposed development, but consistent with RCW 90.58.
Development pursuant to this permit shall be undertaken subject to the applicable policies and performance standards of the Jefferson County Shoreline Management Master Program and the Jefferson County Unified Development Code.
If during excavation or development of the site an area of potential archaeological significance is uncovered, all activity in the immediate area shall be halted, and the Administrator shall be notified at once.
The Federal Endangered Species Act rules to protect threatened Chinook and Summer-run Chum salmon became effective on January 8, 2001. Bull trout have been listed as threatened since early 2000. Under the ESA, any person may bring lawsuit against any individual or agency that "takes" listed species (defined as causing harm, harassing, or damaging habitat for the listed species). In addition, the National Marine Fisheries Service can levy penalties. All areas in Jefferson County are included as "critical habitat" for a listed species. Development of property along any marine shoreline, freshwater shoreline, or floodplains could harm habitat if protective measures are not taken. To minimize the potential to damage habitat, all property owners developing adjacent to marine shoreline, freshwater shoreline, or floodplains are advised to do the following:
- All development activities should avoid unstable slopes, wetlands, and forested areas near surface waters
- Remove minimal vegetation for site development, especially large trees
- Allow trees that have fallen into surface waters to remain there
- Infiltrate stormwater from buildings and driveways onsite through drywells rather than discharging directly into surface waters or roadside ditches
Any individual, group, or agency can bring suit for a listed species "taking", even if you are in compliance with Jefferson County development codes. The risk of a lawsuit against you can be reduced by consulting with a professional fisheries habitat biologist, and following the recommendations for site development provided by the biologist. For more information, contact the National Marine Fisheries Service in Seattle, or the U.S. Fish and Wildlife Service.
|
|