Permit Case Summary

Case Number: Search Help

Case Number:BLD2008-00495 Case Status:Finaled Date Received:12/1/2008
Description:NSFR W/ ATT GARAGE & A/G 250 GAL PROP TANK Date Issued:12/30/2008
Applicant:ROBERT GARTEN Expiration Date:12/30/2009 12:00:00 AM
Site Address:172 ANN KIVLEY DR Case Finaled:11/18/2009
Parcel No:972000034 Other Cases Parcel Data Map It More Details Parcels Images

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: File Archived
Date Completed: 3/3/2010
Disposition: DONE
Description: Insp - FINAL FINAL Building
Date Completed: 11/18/2009
Disposition: DONE
Description: Insp - Address Posted
Date Completed:
Disposition:
Description: Inspection Reminder Sent
Date Completed: 11/3/2009
Disposition: DONE
Description: Issue Building Permit (F)
Date Completed: 12/30/2008
Disposition: DONE
Description: Approve Permit-UF
Date Completed: 12/30/2008
Disposition: DONE
Description: Print Dummy UDC Permit-UF
Date Completed: 12/30/2008
Disposition: DONE
Description: Review Complete-U
Date Completed: 12/30/2008
Disposition: DONE
Description: Det. of Completeness-UF
Date Completed: 12/29/2008
Disposition: DONE
Description: Insp - Setbacks
Date Completed:
Disposition:
Description: Insp - Erosion Control
Date Completed:
Disposition:
Description: Insp - Foundation Footing
Date Completed: 4/20/2009
Disposition: DONE
Description: Insp - Footing Drains
Date Completed:
Disposition:
Description: Insp - Foundation Stem Wall
Date Completed: 4/20/2009
Disposition: DONE
Description: Insp - Underground Plumbing
Date Completed:
Disposition:
Description: Insp - Straps (hold downs)
Date Completed: 5/6/2009
Disposition: FAIL
Description: Insp - Ext. Shear Wall Nailing
Date Completed: 5/6/2009
Disposition: DONE
Description: Insp - Rough-in Plumbing
Date Completed: 11/18/2009
Disposition: DONE
Description: Insp - Framing
Date Completed:
Disposition:
Description: Insp - Airseal
Date Completed: 11/18/2009
Disposition: DONE
Description: Insp - Insulation: Walls
Date Completed: 11/18/2009
Disposition: DONE
Description: Insp - Insulation: Floors
Date Completed: 11/18/2009
Disposition: DONE
Description: Insp - Insulation: Ceiling
Date Completed: 11/18/2009
Disposition: DONE
Description: Insp - Int. Shear Wall Nailing
Date Completed:
Disposition:
Description: Insp - Gas Line: Interior
Date Completed:
Disposition:
Description: Insp - Gas Line: Exterior
Date Completed:
Disposition:
Description: Insp - Propane Tank
Date Completed:
Disposition:
Description: Insp - Heat/Chimney Clearance
Date Completed:
Disposition:
Description: Insp - Drywell/Alt Drainage
Date Completed:
Disposition:
Description: Insp - Address Posted
Date Completed: 11/18/2009
Disposition: DONE
Description: Insp - Final Building
Date Completed: 11/18/2009
Disposition: DONE
Description: Septic System Finaled
Date Completed:
Disposition:
Description: Insp - Under Floor Framing
Date Completed: 4/28/2009
Disposition: DONE
Description: Insp - Blocking
Date Completed:
Disposition:
Description: Insp - Wallboard Nailing
Date Completed: 11/18/2009
Disposition: DONE
Description: Building Permit Application(F)
Date Completed: 12/1/2008
Disposition: DONE
Description: App Substantially Complete-U
Date Completed: 12/29/2008
Disposition: DONE
Description: Case Entered
Date Completed: 12/1/2008
Disposition:
Description: Plan Check
Date Completed: 12/29/2008
Disposition: DONE
Description: Septic Review Complete-U
Date Completed: 12/4/2008
Disposition: DONE
Description: Potable Water Approval
Date Completed: 12/9/2008
Disposition: DONE
Description: Contractor License/Bond Info
Date Completed: 12/1/2008
Disposition: DONE
Description: Stormwater Review-U
Date Completed: 12/30/2008
Disposition: DONE
Description: Env. Sensitive Area Review-U
Date Completed: 12/30/2008
Disposition: DONE
Description: Consistency Review-U
Date Completed: 12/30/2008
Disposition: DONE
Description: RAP Review Complete-U
Date Completed: 12/1/2008
Disposition: DONE

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: Bld Security/hooded lights
Wording Lighting fixtures shall be designed and hooded to prevent the light source from being directly visible from outside the boundaries of the property. The intensity or brightness of all lighting, during construction and after project completion shall not adversely affect the use of surrounding properties or adjoining rights-of-way.

Title: Bld Exterior height lights
Wording Exterior lighting for residential uses shall not exceed twenty feet (20') in height from the finished grade, excepting when such lighting is an integral part of a building or structure. Ground level lighting is encouraged.

Title: Bld Setbacks
Wording Minimum setback from Ann Kively Drive right-of-way shall be 20 feet. Minimum side and rear yard setbacks shall be 5 feet.

Title: Bld building height
Wording The building height is not to exceed 35 feet.

Title: Bld lot coverage
Wording Maximum lot coverage is not to exceed 25%. Lot coverage is defined as amount of impervious surface which includes roof tops, driveways, concrete, etc.

Title: SEPTIC CONDITION
Wording PRIOR TO OCCUPANCY & BUILDING FINAL - FINAL APPROVAL OF SEPTIC SEP02-00162 IS REQUIRED. MUST MEET ALL CONDITIONS OF SEPTIC PERMIT.

Title: SEPTIC CONDITION
Wording ANY PORTION OF TRANSPORT LINE UNDER A DRIVEN WAY IS TO BE SLEEVED/CASED OR EQUIVALENT. VERIFICATION TO BE SUPPLIED TO HEALTH DEPARTMENT ON RECORD DRAWING BY SEPTIC DESIGNER.

Title: SEPTIC CONDITION
Wording ALL COMPONENTS OF THE SEPTIC SYSTEM ARE TO BE COMPLETELY PROTECTED FROM SOIL COMPACTING ACTIVITIES; INCLUDING BUT NOT LIMITED TO VEHICULAR TRAFFIC OR MECHANICAL DISTURBANCE.

Title: SEPTIC CONDITION
Wording MUST COLLECT AND DIVERT ALL SOURCES OF DRAINAGE AWAY FROM SEPTIC TANK, RESERVE & DRAINFIELD.

Title: SEPTIC CONDITION
Wording 10' SEPARATION REQUIRED BETWEEN A WATER LINE AND ALL PORTIONS OF THE ONSITE SEWAGE SYSTEM; EFFLUENT TRANSPORT LINE, TANKS, TREATMENT AND DISPOSAL COMPONENTS.

Title: Outdoor Residential Storage
Wording Outdoor residential storage shall be maintained in an orderly manner and shall create no fire, safety, health or sanitary hazard.

Title: Unlicensed/Inoperable Vehicles
Wording Not more than 2 unlicensed vehicles shall be stored on any lot unless totally screened from view of neighboring dwellings and rights-of-way. Such screening shall meet all applicable performance and development standards specific to the district in which the storage is kept, and shall be in keeping with the character of the area. Screening shall meet the requirements of Chapter 18.30 JCC. Outdoor storage of 3 or more junk motor vehicles is prohibited except in those districts where specified as an automobile wrecking yard or junk (or salvage) yard and allowed as a permitted use in Table 3-1 or Chapter 18.18 JCC, and such storage shall meet the requirements of JCC 18.20.100, Automobile wrecking yards and junk (or salvage) yards. In no case, shall any such junk motor vehicles be stored in a critical area.

Title: SFR PARKING
Wording A minimum of two (2) on-site parking spaces shall be provided for the single family residence.

Title: RAP - COUNTY
Wording The road approach permit (RAP08-0099) must be inspected and finaled by the Jefferson County Department of Public Works prior to the final inspection/certificate of occupancy of this residence. Contact Terry Duff, Department of Public Works at 360-385-9159 for the final road approach inspection.

Title: C-STORMWATER - SPLASHBLOCKS
Wording DESIGN CRITERIA FOR SPLASHBLOCKS: A VEGETATED FLOWPATH OF AT LEAST 50 FEET SHOULD BE MAINTAINED BETWEEN THE DISCHARGE POINT AND ANY PROPERTY LINE, STRUCTURE, STEEP SLOPE, STREAM, WETLAND, LAKE, OR OTHER IMPERVIOUS SURFACE. SENSITIVE AREA BUFFERS MAY COUNT TOWARD FLOWPATH LENGTHS. A MAXIMUM OF 700 SQUARE FEET OF ROOF AREA MAY DRAIN TO EACH SPLASHBLOCK. A SPLASHBLOCK OR A PAD OF CRUSHED ROCK (2 FEET WIDE BY 3 FEET LONG BY 6 INCHES DEEP) SHOULD BE PLACED AT EACH DOWNSPOUT DISCHARGE POINT. NO EROSION OR FLOODING OF DOWNSTREAM PROPERTIES MAY RESULT. FOR SITES WITH SEPTIC SYSTEMS, THE DISCHARGE POINT MUST BE DOWNSLOPE OF THE PRIMARY AND RESERVE DRAINFILED AREAS.

Title: C-STORMWATER STABILIZE CONST. ENT
Wording CONSTRUCTION ENTRANCES SHALL BE STABILIZED WHEREVER TRAFFIC WILL BE LEAVING A CONSTRUCTION SITE AND TRAVELING ON PAVED ROADS OR OTHER PAVED AREAS WITHIN 1,000 FEET OF THE SITE. THE ENTRANCE SHALL BE CONSTRUCTED ON A FIRM COMPACTED SUBGRADE. QUARRY SPALLS (OR HOG FUEL) SHALL BE ADDED IF THE PAD IS NO LONGER IN ACCORDANCE WITH THE SPECIFICATIONS. (BMP C105, 2005 DOE STORMWATER MANUAL). ANY SEDIMENT THAT IS TRACKED ONTO PAVEMENT SHALL BE REMOVED BY SHOVELING OR STREET SWEEPING. THE SEDIMENT COLLECTED BY SWEEPING SHALL BE REMOVED OR STABILIZED ON STIE. ANY QUARRY SPALLS THAT ARE LOOSENED FROM THE PAD, WHICH END UP ON THE ROADWAY SHALL BE REMOVED IMMEDIATELY. UPON PROJECT COMPLETION AND SITE STABILIZATION, ALL CONSTRUCTION ACCESSES INTENDED AS PERMANENT ACCESS FOR MAINTENANCE SHALL BE PERMANENTLY STABILIZED.

Title: Aquifer Recharge Conditions (SFR)
Wording Critical Aquifer Recharge Areas may require special protection measures to mitigate water quality degradation. The submitted proposal does not require additional aquifer protection measures. However, during construction the project shall follow the Best Management Practices (BMPs) and facility design standards as identified and defined in the Stormwater Management Manual for the Puget Sound Basin.

Title: Seawater Intrusion Areas
Wording To help prevent seawater from intruding landward into underground aquifers, all new development activity on Marrowstone Island, Indian Island and within 1/4 mile of any marine shoreline shall be required to infiltrate all stormwater runoff onsite.

Title: Comply with Water Con Measures
Wording The property owner shall comply with Water Conservation Measures (per list maintained by the UDC Administrator).

Title: Stormwater Plan
Wording A Stormwater Site Plan has been submitted and approved by the Department of Community Development. Once the subject permit has been issued the applicant shall fully implement the provisions of the submitted plan and contact the Jefferson County Department of Community Development to arrange a schedule to inspect the property for plan compliance. A Certificate of Occupancy will not be issued until the Department verifies plan compliance. No clearing for roadways or utilities shall occur on the project site until clearing necessary for the installation of temporary sedimentation and erosion control measures have been completed.


Case Findings
Below is a list of findings for this permit case. Findings typically record facts that the staff are using as the basis of their permit processing decisions.
Title: ACCESS/ADDRESS
Wording An address of 172 Ann Kively Drive, Port Hadlock has been assigned to the parcel. Ann Kively Drive is a county local access (C529109).

Title: LOT CREATED
Wording The lot was created through the Melwood Terrace Subdivision on October 15, 1974 under AFN 225396.

Title: POTABLE WATER
Wording The lot is served by the Quimper public water system.

Title: CASE HISTORY
Wording A septic permit (SEP023-0162) was approved on August 6, 2002 and is in an imcomplete status. A road approach permit (RAP08-0099) will be issued at the time of the building permit.

Title: LOT FROM PLAYGROUND TO SFR LOT
Wording Originally Lot 34 of the Melwood Terrace Subdivision was platted as a "playground." It was converted from a "playground" to a residential lot per Resolution 81-95 as signed by the BOCC on September 11, 2995 and recorded under AFN 384748, Vol 535, Page 480.

Title: F-Confirmed ESAs
Wording The application was reviewed by the Jefferson County Department of Community Development staff on December 29, 2008 for the potential presence of Environmentally Sensitive Areas (ESAs) under the provisions of the Unified Development Code (UDC). After an initial Geographic Information Systems mapping review and an investigative site inspection, the following ESAs were confirmed to be present on the subject property: SAPRA aquifer recharge area; coastal SIPZ.

Title: F-Aquifer Recharge Area
Wording Aquifer Recharge Areas in Jefferson County are characterized by porous geological formations that allow percolation of the surface water into the soils and the underlying zone of saturation. Aquifers are geologic formations that contain sufficient saturated permeable material to yield significant quantities of water to wells and springs. Aquifers serve as the source of drinking water within most of the rural portions of Jefferson County.

Title: F-Susc. Aquifer Recharge Area
Wording Susceptible Aquifer Recharge Areas are those with geologic and hydrologic conditions that promote rapid infiltration of recharge waters to groundwater aquifers.

Title: F-Critical Aquifer Recharge Area
Wording Critical Aquifer Recharge Areas are defined as Seawater Intrusion Areas, and Special Aquifer Recharge Protection Areas and the following land uses located within Susceptible Aquifer Recharge Areas (1) All Industrial Land Uses (2) All Commercial Uses (3) All Rural Residential Land Uses requiring a Discretionary Use or Conditional Use Permit (4) All Rural Residential Land Uses with nonconforming uses that would otherwise require a Discretionary Use or Conditional Use Permit (5) Unsewered Planned Rural Residential Developments (6) Unsewered residential development with gross densities greater than one unit per acre. All of the above listed uses shall be subject to the applicable requirements and standards of the Jefferson County Unified Development Code.

Title: F-SIPZ
Wording Marine shorelines and islands are susceptible to a condition that is known as seawater intrusion. Seawater intrusion is a condition in which the saltwater/freshwater interface in an aquifer moves inland so that wells drilled on upland areas cannot obtain freshwater suitable for public consumption without significant additional treatment and cost. Maintaining a stable balance in the saltwater/freshwater interface is primarily a function of the rate of aquifer recharge (primarily through rainfall) and the rate of groundwater withdrawals (primarily through wells). The Washington Department of Ecology is the agency with statutory authority to regulate groundwater withdrawal for individual wells in Jefferson County. New development, redevelopment, and land use activities on islands and in close proximity to marine shorelines in particular should be developed in such a manner to maximize aquifer recharge and maintain the saltwater/freshwater balance to the maximum extent possible by infiltrating stormwater runoff so that it recharges the aquifer.

Title: F-Coastal SIPZ
Wording The parcel is located within a coastal SIPZ (seawater intrusion protection zone) according to the County GIS map. There are voluntary and mandatory measures identified in the Jefferson County Seawater Intrusion Policy (Resolution 44-22, effective September 23, 2002) that apply to well drilling proposals and building permit applications on existing lots of record. A Coastal SIPZ is defined as: all islands and area within one-quarter mile of marine shoreline, but no history of chloride concentration above 100 mg/L in groundwater sources within 1000 feet.

Title: F-Medium Stormwater
Wording The applicant is proposing to create or add 3996 square feet of impervious surface and 4598 square feet of land disturbing activities. JCC 18.30.060 and 18.30.070 require the project applicant submit a stormwater plan meeting Minimum Requirements #1 through #5 of the Department of Ecology Stormwater Management Manual for Western Washington. The stormwater plan shall address measures to control stormwater, erosion and sediment during construction and shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.

Title: F-SEPA Exempt
Wording Jefferson County determined that this proposal is categorically exempt from review under the State Environmental Policy Act (SEPA) pursuant to WAC 197-11-800(1)(b)(i).

Title: F-Site Plan Changes
Wording The revised site plan dated December 30, 2008 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated December 30, 2008 shall be resubmitted for review and approval by Jefferson County Department of Community Development.

Title: F-Approval for _____ Only
Wording This approval is for a single family residence with attached grage and 250 gallon above-ground propane tank only. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits.