Description:
|
| | |
File Archived
|
|
Date Completed:
|
| | |
3/3/2010
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - FINAL FINAL Building
|
|
Date Completed:
|
| | |
11/18/2009
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Address Posted
|
|
Date Completed:
|
| | |
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Inspection Reminder Sent
|
|
Date Completed:
|
| | |
11/3/2009
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Issue Building Permit (F)
|
|
Date Completed:
|
| | |
12/30/2008
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Approve Permit-UF
|
|
Date Completed:
|
| | |
12/30/2008
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Print Dummy UDC Permit-UF
|
|
Date Completed:
|
| | |
12/30/2008
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Review Complete-U
|
|
Date Completed:
|
| | |
12/30/2008
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Det. of Completeness-UF
|
|
Date Completed:
|
| | |
12/29/2008
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Setbacks
|
|
Date Completed:
|
| | |
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Insp - Erosion Control
|
|
Date Completed:
|
| | |
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Insp - Foundation Footing
|
|
Date Completed:
|
| | |
4/20/2009
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Footing Drains
|
|
Date Completed:
|
| | |
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Insp - Foundation Stem Wall
|
|
Date Completed:
|
| | |
4/20/2009
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Underground Plumbing
|
|
Date Completed:
|
| | |
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Insp - Straps (hold downs)
|
|
Date Completed:
|
| | |
5/6/2009
|
|
Disposition:
|
| | |
FAIL
|
|
|
Description:
|
| | |
Insp - Ext. Shear Wall Nailing
|
|
Date Completed:
|
| | |
5/6/2009
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Rough-in Plumbing
|
|
Date Completed:
|
| | |
11/18/2009
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Framing
|
|
Date Completed:
|
| | |
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Insp - Airseal
|
|
Date Completed:
|
| | |
11/18/2009
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Insulation: Walls
|
|
Date Completed:
|
| | |
11/18/2009
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Insulation: Floors
|
|
Date Completed:
|
| | |
11/18/2009
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Insulation: Ceiling
|
|
Date Completed:
|
| | |
11/18/2009
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Int. Shear Wall Nailing
|
|
Date Completed:
|
| | |
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Insp - Gas Line: Interior
|
|
Date Completed:
|
| | |
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Insp - Gas Line: Exterior
|
|
Date Completed:
|
| | |
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Insp - Propane Tank
|
|
Date Completed:
|
| | |
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Insp - Heat/Chimney Clearance
|
|
Date Completed:
|
| | |
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Insp - Drywell/Alt Drainage
|
|
Date Completed:
|
| | |
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Insp - Address Posted
|
|
Date Completed:
|
| | |
11/18/2009
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Final Building
|
|
Date Completed:
|
| | |
11/18/2009
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Septic System Finaled
|
|
Date Completed:
|
| | |
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Insp - Under Floor Framing
|
|
Date Completed:
|
| | |
4/28/2009
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Blocking
|
|
Date Completed:
|
| | |
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Insp - Wallboard Nailing
|
|
Date Completed:
|
| | |
11/18/2009
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Building Permit Application(F)
|
|
Date Completed:
|
| | |
12/1/2008
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
App Substantially Complete-U
|
|
Date Completed:
|
| | |
12/29/2008
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Case Entered
|
|
Date Completed:
|
| | |
12/1/2008
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Plan Check
|
|
Date Completed:
|
| | |
12/29/2008
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Septic Review Complete-U
|
|
Date Completed:
|
| | |
12/4/2008
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Potable Water Approval
|
|
Date Completed:
|
| | |
12/9/2008
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Contractor License/Bond Info
|
|
Date Completed:
|
| | |
12/1/2008
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Stormwater Review-U
|
|
Date Completed:
|
| | |
12/30/2008
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Env. Sensitive Area Review-U
|
|
Date Completed:
|
| | |
12/30/2008
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Consistency Review-U
|
|
Date Completed:
|
| | |
12/30/2008
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
RAP Review Complete-U
|
|
Date Completed:
|
| | |
12/1/2008
|
|
Disposition:
|
| | |
DONE
|
|
|
Title:
|
| | |
Bld Security/hooded lights
|
|
Wording
|
| | |
Lighting fixtures shall be designed and hooded to prevent the light source from being directly visible from outside the boundaries of the property. The intensity or brightness of all lighting, during construction and after project completion shall not adversely affect the use of surrounding properties or adjoining rights-of-way.
|
|
|
Title:
|
| | |
Bld Exterior height lights
|
|
Wording
|
| | |
Exterior lighting for residential uses shall not exceed twenty feet (20') in height from the finished grade, excepting when such lighting is an integral part of a building or structure. Ground level lighting is encouraged.
|
|
|
Title:
|
| | |
Bld Setbacks
|
|
Wording
|
| | |
Minimum setback from Ann Kively Drive right-of-way shall be 20 feet. Minimum side and rear yard setbacks shall be 5 feet.
|
|
|
Title:
|
| | |
Bld building height
|
|
Wording
|
| | |
The building height is not to exceed 35 feet.
|
|
|
Title:
|
| | |
Bld lot coverage
|
|
Wording
|
| | |
Maximum lot coverage is not to exceed 25%. Lot coverage is defined as amount of impervious surface which includes roof tops, driveways, concrete, etc.
|
|
|
Title:
|
| | |
SEPTIC CONDITION
|
|
Wording
|
| | |
PRIOR TO OCCUPANCY & BUILDING FINAL - FINAL APPROVAL OF SEPTIC SEP02-00162 IS REQUIRED. MUST MEET ALL CONDITIONS OF SEPTIC PERMIT.
|
|
|
Title:
|
| | |
SEPTIC CONDITION
|
|
Wording
|
| | |
ANY PORTION OF TRANSPORT LINE UNDER A DRIVEN WAY IS TO BE SLEEVED/CASED OR EQUIVALENT. VERIFICATION TO BE SUPPLIED TO HEALTH DEPARTMENT ON RECORD DRAWING BY SEPTIC DESIGNER.
|
|
|
Title:
|
| | |
SEPTIC CONDITION
|
|
Wording
|
| | |
ALL COMPONENTS OF THE SEPTIC SYSTEM ARE TO BE COMPLETELY PROTECTED FROM SOIL COMPACTING ACTIVITIES; INCLUDING BUT NOT LIMITED TO VEHICULAR TRAFFIC OR MECHANICAL DISTURBANCE.
|
|
|
Title:
|
| | |
SEPTIC CONDITION
|
|
Wording
|
| | |
MUST COLLECT AND DIVERT ALL SOURCES OF DRAINAGE AWAY FROM SEPTIC TANK, RESERVE & DRAINFIELD.
|
|
|
Title:
|
| | |
SEPTIC CONDITION
|
|
Wording
|
| | |
10' SEPARATION REQUIRED BETWEEN A WATER LINE AND ALL PORTIONS OF THE ONSITE SEWAGE SYSTEM; EFFLUENT TRANSPORT LINE, TANKS, TREATMENT AND DISPOSAL COMPONENTS.
|
|
|
Title:
|
| | |
Outdoor Residential Storage
|
|
Wording
|
| | |
Outdoor residential storage shall be maintained in an orderly manner and shall create no fire, safety, health or sanitary hazard.
|
|
|
Title:
|
| | |
Unlicensed/Inoperable Vehicles
|
|
Wording
|
| | |
Not more than 2 unlicensed vehicles shall be stored on any lot unless totally screened from view of neighboring dwellings and rights-of-way. Such screening shall meet all applicable performance and development standards specific to the district in which the storage is kept, and shall be in keeping with the character of the area. Screening shall meet the requirements of Chapter 18.30 JCC. Outdoor storage of 3 or more junk motor vehicles is prohibited except in those districts where specified as an automobile wrecking yard or junk (or salvage) yard and allowed as a permitted use in Table 3-1 or Chapter 18.18 JCC, and such storage shall meet the requirements of JCC 18.20.100, Automobile wrecking yards and junk (or salvage) yards. In no case, shall any such junk motor vehicles be stored in a critical area.
|
|
|
Title:
|
| | |
SFR PARKING
|
|
Wording
|
| | |
A minimum of two (2) on-site parking spaces shall be provided for the single family residence.
|
|
|
Title:
|
| | |
RAP - COUNTY
|
|
Wording
|
| | |
The road approach permit (RAP08-0099) must be inspected and finaled by the Jefferson County Department of Public Works prior to the final inspection/certificate of occupancy of this residence. Contact Terry Duff, Department of Public Works at 360-385-9159 for the final road approach inspection.
|
|
|
Title:
|
| | |
C-STORMWATER - SPLASHBLOCKS
|
|
Wording
|
| | |
DESIGN CRITERIA FOR SPLASHBLOCKS:
A VEGETATED FLOWPATH OF AT LEAST 50 FEET SHOULD BE MAINTAINED BETWEEN THE DISCHARGE POINT AND ANY PROPERTY LINE, STRUCTURE, STEEP SLOPE, STREAM, WETLAND, LAKE, OR OTHER IMPERVIOUS SURFACE. SENSITIVE AREA BUFFERS MAY COUNT TOWARD FLOWPATH LENGTHS.
A MAXIMUM OF 700 SQUARE FEET OF ROOF AREA MAY DRAIN TO EACH SPLASHBLOCK.
A SPLASHBLOCK OR A PAD OF CRUSHED ROCK (2 FEET WIDE BY 3 FEET LONG BY 6 INCHES DEEP) SHOULD BE PLACED AT EACH DOWNSPOUT DISCHARGE POINT.
NO EROSION OR FLOODING OF DOWNSTREAM PROPERTIES MAY RESULT.
FOR SITES WITH SEPTIC SYSTEMS, THE DISCHARGE POINT MUST BE DOWNSLOPE OF THE PRIMARY AND RESERVE DRAINFILED AREAS.
|
|
|
Title:
|
| | |
C-STORMWATER STABILIZE CONST. ENT
|
|
Wording
|
| | |
CONSTRUCTION ENTRANCES SHALL BE STABILIZED WHEREVER TRAFFIC WILL BE LEAVING A CONSTRUCTION SITE AND TRAVELING ON PAVED ROADS OR OTHER PAVED AREAS WITHIN 1,000 FEET OF THE SITE.
THE ENTRANCE SHALL BE CONSTRUCTED ON A FIRM COMPACTED SUBGRADE.
QUARRY SPALLS (OR HOG FUEL) SHALL BE ADDED IF THE PAD IS NO LONGER IN ACCORDANCE WITH THE SPECIFICATIONS. (BMP C105, 2005 DOE STORMWATER MANUAL).
ANY SEDIMENT THAT IS TRACKED ONTO PAVEMENT SHALL BE REMOVED BY SHOVELING OR STREET SWEEPING. THE SEDIMENT COLLECTED BY SWEEPING SHALL BE REMOVED OR STABILIZED ON STIE.
ANY QUARRY SPALLS THAT ARE LOOSENED FROM THE PAD, WHICH END UP ON THE ROADWAY SHALL BE REMOVED IMMEDIATELY.
UPON PROJECT COMPLETION AND SITE STABILIZATION, ALL CONSTRUCTION ACCESSES INTENDED AS PERMANENT ACCESS FOR MAINTENANCE SHALL BE PERMANENTLY STABILIZED.
|
|
|
Title:
|
| | |
Aquifer Recharge Conditions (SFR)
|
|
Wording
|
| | |
Critical Aquifer Recharge Areas may require special protection measures to mitigate water quality degradation. The submitted proposal does not require additional aquifer protection measures. However, during construction the project shall follow the Best Management Practices (BMPs) and facility design standards as identified and defined in the Stormwater Management Manual for the Puget Sound Basin.
|
|
|
Title:
|
| | |
Seawater Intrusion Areas
|
|
Wording
|
| | |
To help prevent seawater from intruding landward into underground aquifers, all new development activity on Marrowstone Island, Indian Island and within 1/4 mile of any marine shoreline shall be required to infiltrate all stormwater runoff onsite.
|
|
|
Title:
|
| | |
Comply with Water Con Measures
|
|
Wording
|
| | |
The property owner shall comply with Water Conservation Measures (per list maintained by the UDC Administrator).
|
|
|
Title:
|
| | |
Stormwater Plan
|
|
Wording
|
| | |
A Stormwater Site Plan has been submitted and approved by the Department of Community Development. Once the subject permit has been issued the applicant shall fully implement the provisions of the submitted plan and contact the Jefferson County Department of Community Development to arrange a schedule to inspect the property for plan compliance. A Certificate of Occupancy will not be issued until the Department verifies plan compliance. No clearing for roadways or utilities shall occur on the project site until clearing necessary for the installation of temporary sedimentation and erosion control measures have been completed.
|
|
|
Title:
|
| | |
ACCESS/ADDRESS
|
|
Wording
|
| | |
An address of 172 Ann Kively Drive, Port Hadlock has been assigned to the parcel. Ann Kively Drive is a county local access (C529109).
|
|
|
Title:
|
| | |
LOT CREATED
|
|
Wording
|
| | |
The lot was created through the Melwood Terrace Subdivision on October 15, 1974 under AFN 225396.
|
|
|
Title:
|
| | |
POTABLE WATER
|
|
Wording
|
| | |
The lot is served by the Quimper public water system.
|
|
|
Title:
|
| | |
CASE HISTORY
|
|
Wording
|
| | |
A septic permit (SEP023-0162) was approved on August 6, 2002 and is in an imcomplete status. A road approach permit (RAP08-0099) will be issued at the time of the building permit.
|
|
|
Title:
|
| | |
LOT FROM PLAYGROUND TO SFR LOT
|
|
Wording
|
| | |
Originally Lot 34 of the Melwood Terrace Subdivision was platted as a "playground." It was converted from a "playground" to a residential lot per Resolution 81-95 as signed by the BOCC on September 11, 2995 and recorded under AFN 384748, Vol 535, Page 480.
|
|
|
Title:
|
| | |
F-Confirmed ESAs
|
|
Wording
|
| | |
The application was reviewed by the Jefferson County Department of Community Development staff on December 29, 2008 for the potential presence of Environmentally Sensitive Areas (ESAs) under the provisions of the Unified Development Code (UDC). After an initial Geographic Information Systems mapping review and an investigative site inspection, the following ESAs were confirmed to be present on the subject property: SAPRA aquifer recharge area; coastal SIPZ.
|
|
|
Title:
|
| | |
F-Aquifer Recharge Area
|
|
Wording
|
| | |
Aquifer Recharge Areas in Jefferson County are characterized by porous geological formations that allow percolation of the surface water into the soils and the underlying zone of saturation. Aquifers are geologic formations that contain sufficient saturated permeable material to yield significant quantities of water to wells and springs. Aquifers serve as the source of drinking water within most of the rural portions of Jefferson County.
|
|
|
Title:
|
| | |
F-Susc. Aquifer Recharge Area
|
|
Wording
|
| | |
Susceptible Aquifer Recharge Areas are those with geologic and hydrologic conditions that promote rapid infiltration of recharge waters to groundwater aquifers.
|
|
|
Title:
|
| | |
F-Critical Aquifer Recharge Area
|
|
Wording
|
| | |
Critical Aquifer Recharge Areas are defined as Seawater Intrusion Areas, and Special Aquifer Recharge Protection Areas and the following land uses located within Susceptible Aquifer Recharge Areas (1) All Industrial Land Uses (2) All Commercial Uses (3) All Rural Residential Land Uses requiring a Discretionary Use or Conditional Use Permit (4) All Rural Residential Land Uses with nonconforming uses that would otherwise require a Discretionary Use or Conditional Use Permit (5) Unsewered Planned Rural Residential Developments (6) Unsewered residential development with gross densities greater than one unit per acre. All of the above listed uses shall be subject to the applicable requirements and standards of the Jefferson County Unified Development Code.
|
|
|
Title:
|
| | |
F-SIPZ
|
|
Wording
|
| | |
Marine shorelines and islands are susceptible to a condition that is known as seawater intrusion. Seawater intrusion is a condition in which the saltwater/freshwater interface in an aquifer moves inland so that wells drilled on upland areas cannot obtain freshwater suitable for public consumption without significant additional treatment and cost. Maintaining a stable balance in the saltwater/freshwater interface is primarily a function of the rate of aquifer recharge (primarily through rainfall) and the rate of groundwater withdrawals (primarily through wells). The Washington Department of Ecology is the agency with statutory authority to regulate groundwater withdrawal for individual wells in Jefferson County. New development, redevelopment, and land use activities on islands and in close proximity to marine shorelines in particular should be developed in such a manner to maximize aquifer recharge and maintain the saltwater/freshwater balance to the maximum extent possible by infiltrating stormwater runoff so that it recharges the aquifer.
|
|
|
Title:
|
| | |
F-Coastal SIPZ
|
|
Wording
|
| | |
The parcel is located within a coastal SIPZ (seawater intrusion protection zone) according to the County GIS map. There are voluntary and mandatory measures identified in the Jefferson County Seawater Intrusion Policy (Resolution 44-22, effective September 23, 2002) that apply to well drilling proposals and building permit applications on existing lots of record.
A Coastal SIPZ is defined as: all islands and area within one-quarter mile of marine shoreline, but no history of chloride concentration above 100 mg/L in groundwater sources within 1000 feet.
|
|
|
Title:
|
| | |
F-Medium Stormwater
|
|
Wording
|
| | |
The applicant is proposing to create or add 3996 square feet of impervious surface and 4598 square feet of land disturbing activities. JCC 18.30.060 and 18.30.070 require the project applicant submit a stormwater plan meeting Minimum Requirements #1 through #5 of the Department of Ecology Stormwater Management Manual for Western Washington. The stormwater plan shall address measures to control stormwater, erosion and sediment during construction and shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.
|
|
|
Title:
|
| | |
F-SEPA Exempt
|
|
Wording
|
| | |
Jefferson County determined that this proposal is categorically exempt from review under the State Environmental Policy Act (SEPA) pursuant to WAC 197-11-800(1)(b)(i).
|
|
|
Title:
|
| | |
F-Site Plan Changes
|
|
Wording
|
| | |
The revised site plan dated December 30, 2008 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated December 30, 2008 shall be resubmitted for review and approval by Jefferson County Department of Community Development.
|
|
|
Title:
|
| | |
F-Approval for _____ Only
|
|
Wording
|
| | |
This approval is for a single family residence with attached grage and 250 gallon above-ground propane tank only. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits.
|
|
|
Title:
|
| | |
ZONING
|
|
Wording
|
| | |
The parcel has been designated as RR 1:5 under the Jefferson County Comprehensive Land Use Map effective August 28, 1998.
|
|