Permit Case Summary

Case Number: Search Help

Case Number:BLD2008-00368 Case Status:Finaled Date Received:8/13/2008
Description:NSFR TO REPLACE EXISTING M/H Date Issued:9/11/2008
Applicant:PAMELA CRONE-WENZLOFF Expiration Date:9/11/2009 12:00:00 AM
Site Address:151 D ST Case Finaled:7/21/2009
Parcel No:996401102 Other Cases Parcel Data Map It More Details

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: File Archived
Date Completed: 6/30/2010
Disposition: DONE
Description: Certificate of Occupancy-F
Date Completed: 7/21/2009
Disposition: DONE
Description: Insp - FINAL FINAL Building
Date Completed: 7/21/2009
Disposition: DONE
Description: Insp - FINAL FINAL Building
Date Completed: 7/21/2009
Disposition: DONE
Description: Issue Building Permit (F)
Date Completed: 9/11/2008
Disposition: DONE
Description: Approve Permit-UF
Date Completed: 9/11/2008
Disposition: DONE
Description: Review Complete-U
Date Completed: 9/11/2008
Disposition: DONE
Description: Det. of Completeness-UF
Date Completed: 9/11/2008
Disposition: DONE
Description: Insp - Setbacks
Date Completed: 10/23/2008
Disposition: DONE
Description: Insp - Foundation Footing
Date Completed: 10/23/2008
Disposition: DONE
Description: Insp - Foundation Stem Wall
Date Completed: 10/23/2008
Disposition: DONE
Description: Insp - Ext. Shear Wall Nailing
Date Completed: 11/13/2008
Disposition: DONE
Description: Insp - Rough-in Plumbing
Date Completed: 12/3/2008
Disposition: DONE
Description: Insp - Framing
Date Completed: 12/11/2008
Disposition: DONE
Description: Insp - Airseal
Date Completed: 12/29/2008
Disposition: DONE
Description: Insp - Insulation: Walls
Date Completed: 12/29/2008
Disposition: DONE
Description: Insp - Insulation: Floors
Date Completed: 7/21/2009
Disposition: DONE
Description: Insp - Insulation: Ceiling
Date Completed: 7/21/2009
Disposition: DONE
Description: Insp - Address Posted
Date Completed: 7/21/2009
Disposition: DONE
Description: Insp - Final Building
Date Completed: 7/21/2009
Disposition: DONE
Description: Septic System Finaled
Date Completed: 5/4/2009
Disposition: DONE
Description: Insp - Under Floor Framing
Date Completed: 11/7/2008
Disposition: DONE
Description: Insp - Wallboard Nailing
Date Completed: 1/7/2009
Disposition: DONE
Description: Building Permit Application(F)
Date Completed: 8/13/2008
Disposition: DONE
Description: App Substantially Complete-U
Date Completed: 8/27/2008
Disposition: DONE
Description: Case Entered
Date Completed: 8/13/2008
Disposition:
Description: Plan Check
Date Completed: 9/11/2008
Disposition: DONE
Description: Septic Review Complete-U
Date Completed: 9/10/2008
Disposition: DONE
Description: Potable Water Approval
Date Completed: 8/13/2008
Disposition: DONE
Description: Contractor License/Bond Info
Date Completed: 8/13/2008
Disposition: DONE
Description: Stormwater Review-U
Date Completed: 8/27/2008
Disposition: DONE
Description: Env. Sensitive Area Review-U
Date Completed: 8/27/2008
Disposition: DONE
Description: Consistency Review-U
Date Completed: 9/11/2008
Disposition: DONE
Description: RAP Review Complete-U
Date Completed: 8/13/2008
Disposition: DONE

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: MANUFACTURED HOME TO BE REMOVED
Wording MANUFACTURED HOME TO BE REMOVED PRIOR TO FINAL

Title: Bld Setbacks
Wording Setback from D Street right-of-way shall be 20'. Setbacks from North and South boundary lines shall be 5'. Setback from East boundary line shall be 10' from the alley way per the variance granted by the Administrator on 9/3/08.. Submitted Site Plan meets UDC requirements.

Title: Bld building height
Wording The building height is not to exceed 35 feet.

Title: Bld lot coverage
Wording Maximum lot coverage is not to exceed 25%. Lot coverage is defined as amount of impervious surface which includes roof tops, driveways, concrete, etc.

Title: SEPTIC CONDITION
Wording A MINIMUM OF 10' MUST BE MAINTAINED BETWEEN BUILDING FOUNDATION AND EDGE OF DISPOSAL COMPONENT AND RESERVE AREA.

Title: SEPTIC CONDITION
Wording ANY PORTION OF TRANSPORT LINE UNDER A DRIVEN WAY IS TO BE SLEEVED/CASED OR EQUIVALENT.

Title: SEPTIC CONDITION
Wording MUST COLLECT AND DIVERT ALL SOURCES OF DRAINAGE AWAY FROM SEPTIC TANK, RESERVE & DRAINFIELD.

Title: SEPTIC CONDITION
Wording 10' SEPARATION REQUIRED BETWEEN A WATER LINE AND ALL PORTIONS OF THE ONSITE SEWAGE SYSTEM; EFFLUENT TRANSPORT LINE, TANKS, TREATMENT AND DISPOSAL COMPONENTS.

Title: Outdoor Residential Storage
Wording Outdoor residential storage shall be maintained in an orderly manner and shall create no fire, safety, health or sanitary hazard.

Title: Unlicensed/Inoperable Vehicles
Wording Not more than 2 unlicensed vehicles shall be stored on any lot unless totally screened from view of neighboring dwellings and rights-of-way. Such screening shall meet all applicable performance and development standards specific to the district in which the storage is kept, and shall be in keeping with the character of the area. Screening shall meet the requirements of Chapter 18.30 JCC. Outdoor storage of 3 or more junk motor vehicles is prohibited except in those districts where specified as an automobile wrecking yard or junk (or salvage) yard and allowed as a permitted use in Table 3-1 or Chapter 18.18 JCC, and such storage shall meet the requirements of JCC 18.20.100, Automobile wrecking yards and junk (or salvage) yards. In no case, shall any such junk motor vehicles be stored in a critical area.

Title: BMPs
Wording The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.

Title: C-Small Stormwater
Wording The project shall comply with Construction Stormwater Pollution Prevention (SWPP) Elements #1 through #12 of the Department of Ecology's Stormwater Management Manual for Western Washington to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.


Case Findings
Below is a list of findings for this permit case. Findings typically record facts that the staff are using as the basis of their permit processing decisions.
Title: F-No ESAs Found
Wording The application was reviewed by the Jefferson County Department of Community Development for the presence of Environmentally Sensitive Areas (ESAs). The Department conducted a review and has concluded that the property DOES NOT contain Environmentally Sensitive Areas. However, future proposals will be subject to a new ESA review and conditions may be added if new ESAs are found on the property.

Title: F-Small Stormwater
Wording The applicant is proposing to create or add 1176 square feet of impervious surface and 3736 square feet of land disturbing activities. JCC 18.30.060 and 18.30.070 require your proposal comply with Minimum Requirement #2 (Construction Stormwater Pollution Prevention) of the Department of Ecology Stormwater Management Manual for Western Washington to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.

Title: F-SEPA Exempt
Wording Jefferson County determined that this proposal is categorically exempt from review under the State Environmental Policy Act (SEPA) pursuant to WAC 197-11-800(1)(b)(i).

Title: F-Site Plan Changes
Wording The site plan as submitted with the Single Family Residence application on 8/13/08 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated 8/28/08 shall be resubmitted for review and approval by Jefferson County Department of Community Development.

Title: ZONING
Wording The parcel has been designated as RR1:5 under the Jefferson County Comprehensive Land Use Map effective August 28, 1998.