Permit Case Summary

Case Number: Search Help

Case Number:BLD2007-00527 Case Status:Finaled Date Received:9/28/2007
Description:NEW SFR W/ ATT GAR - A/G 100 GAL PROPANE TANK Date Issued:11/9/2007
Applicant:ALLAN RAICHART Expiration Date:11/9/2009 12:00:00 AM
Site Address:201 D ST Case Finaled:10/21/2009
Parcel No:996401101 Other Cases Parcel Data Map It More Details Parcels Images

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: File Archived
Date Completed: 6/30/2010
Disposition: DONE
Description: Insp - FINAL FINAL Building
Date Completed: 10/21/2009
Disposition: DONE
Description: Inspection Reminder Sent
Date Completed: 10/14/2009
Disposition: DONE
Description: Change Status to RENEWED
Date Completed: 10/23/2008
Disposition: DONE
Description: Inspection Reminder Sent
Date Completed: 10/14/2008
Disposition: DONE
Description: Insp - Hydrostatic Test
Date Completed: 7/7/2008
Disposition: DONE
Description: Insp - Underground Plumbing
Date Completed:
Disposition:
Description: Issue Building Permit (F)
Date Completed: 11/9/2007
Disposition: DONE
Description: Approve Permit-UF
Date Completed: 11/9/2007
Disposition: DONE
Description: Print Dummy UDC Permit-UF
Date Completed: 11/9/2007
Disposition: DONE
Description: Review Complete-U
Date Completed: 11/9/2007
Disposition: DONE
Description: Det. of Completeness-UF
Date Completed: 11/9/2007
Disposition: DONE
Description: Insp - Setbacks
Date Completed: 6/9/2008
Disposition: DONE
Description: Insp - Erosion Control
Date Completed:
Disposition:
Description: Insp - Foundation Footing
Date Completed: 6/9/2008
Disposition: DONE
Description: Insp - Footing Drains
Date Completed:
Disposition:
Description: Insp - Foundation Stem Wall
Date Completed: 6/12/2008
Disposition: DONE
Description: Insp - Underground Plumbing
Date Completed: 6/25/2008
Disposition: DONE
Description: Insp - Straps (hold downs)
Date Completed: 7/31/2008
Disposition: DONE
Description: Insp - Ext. Shear Wall Nailing
Date Completed: 12/29/2008
Disposition: DONE
Description: Insp - Rough-in Plumbing
Date Completed: 12/22/2008
Disposition: DONE
Description: Insp - Framing
Date Completed: 12/29/2008
Disposition: DONE
Description: Insp - Airseal
Date Completed: 12/22/2008
Disposition: DONE
Description: Insp - Insulation: Walls
Date Completed: 12/29/2008
Disposition: DONE
Description: Insp - Insulation: Floors
Date Completed: 6/27/2008
Disposition: DONE
Description: Insp - Insulation: Ceiling
Date Completed:
Disposition:
Description: Insp - Int. Shear Wall Nailing
Date Completed:
Disposition:
Description: Insp - Gas Line: Interior
Date Completed: 12/22/2008
Disposition: DONE
Description: Insp - Gas Line: Exterior
Date Completed:
Disposition:
Description: Insp - Propane Tank
Date Completed:
Disposition:
Description: Insp - Heat/Chimney Clearance
Date Completed:
Disposition:
Description: Insp - Drywell/Alt Drainage
Date Completed:
Disposition:
Description: Insp - Address Posted
Date Completed: 12/22/2008
Disposition: DONE
Description: Insp - Final Building
Date Completed: 10/21/2009
Disposition: DONE
Description: Septic System Finaled
Date Completed:
Disposition:
Description: Insp - Blocking
Date Completed: 12/29/2008
Disposition: DONE
Description: Insp - Wallboard Nailing
Date Completed:
Disposition:
Description: Building Permit Application(F)
Date Completed: 9/28/2007
Disposition: DONE
Description: App Substantially Complete-U
Date Completed: 11/9/2007
Disposition: DONE
Description: Case Entered
Date Completed: 9/28/2007
Disposition:
Description: Plan Check
Date Completed: 10/24/2007
Disposition: DONE
Description: Septic Review Complete-U
Date Completed: 11/6/2007
Disposition: DONE
Description: Potable Water Approval
Date Completed: 10/24/2007
Disposition: DONE
Description: Contractor License/Bond Info
Date Completed: 9/28/2007
Disposition: DONE
Description: Stormwater Review-U
Date Completed: 11/9/2007
Disposition: DONE
Description: Env. Sensitive Area Review-U
Date Completed: 11/9/2007
Disposition: DONE
Description: Consistency Review-U
Date Completed: 11/9/2007
Disposition: DONE
Description: RAP Review Complete-U
Date Completed: 11/9/2007
Disposition: DONE

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: Bld Security/hooded lights
Wording Lighting fixtures shall be designed and hooded to prevent the light source from being directly visible from outside the boundaries of the property. The intensity or brightness of all lighting, during construction and after project completion shall not adversely affect the use of surrounding properties or adjoining rights-of-way.

Title: Bld Exterior height lights
Wording Exterior lighting for residential uses shall not exceed twenty feet (20') in height from the finished grade, excepting when such lighting is an integral part of a building or structure. Ground level lighting is encouraged.

Title: Bld Setbacks
Wording Minimum setback from D Street right-of-way shall be 20 feet. Minimum side and rear yard setbacks shall be 5 feet.

Title: Bld building height
Wording The building height is not to exceed 35 feet.

Title: Bld lot coverage
Wording Maximum lot coverage is not to exceed 25%. Lot coverage is defined as amount of impervious surface which includes roof tops, driveways, concrete, etc.

Title: SEPTIC CONDITION
Wording BUILDING FOUNDATION TO BE A MINIMUM OF 61 FEET FROM NORTH PROPERTY LINE. A MINIMUM OF 10' MUST BE MAINTAINED BETWEEN BUILDING FOUNDATION AND EDGE OF DISPOSAL COMPONENT AND RESERVE AREA.

Title: SEPTIC CONDITION
Wording ALL COMPONENTS OF THE SEPTIC SYSTEM ARE TO BE COMPLETELY PROTECTED FROM VEHICULAR TRAFFIC OR MECHANICAL DISTURBANCE.

Title: SEPTIC CONDITION
Wording MUST COLLECT AND DIVERT ALL SOURCES OF DRAINAGE AWAY FROM SEPTIC TANK, RESERVE & DRAINFIELD.

Title: SEPTIC CONDITION
Wording 10' SEPARATION REQUIRED BETWEEN A WATER LINE AND ALL PORTIONS OF THE ONSITE SEWAGE SYSTEM; EFFLUENT TRANSPORT LINE, TANKS, TREATMENT AND DISPOSAL COMPONENTS.

Title: Outdoor Residential Storage
Wording Outdoor residential storage shall be maintained in an orderly manner and shall create no fire, safety, health or sanitary hazard.

Title: Unlicensed/Inoperable Vehicles
Wording Not more than 2 unlicensed vehicles shall be stored on any lot unless totally screened from view of neighboring dwellings and rights-of-way. Such screening shall meet all applicable performance and development standards specific to the district in which the storage is kept, and shall be in keeping with the character of the area. Screening shall meet the requirements of Chapter 18.30 JCC. Outdoor storage of 3 or more junk motor vehicles is prohibited except in those districts where specified as an autormobile wrecking yard or junk (or salvage) yard and allowed as a permitted use in Table 3-1 or Chapter 18.18 JCC, and such storage shall meet the requriements of JCC 18.20.100, Automobile wrecking yards and junk (or salvage) yards. In no case, shall any such junk motor vehicles be stored in a critical area.

Title: SFR PARKING
Wording A minimum of two (2) on-site parking spaces shall be provided for the single family residence.

Title: Stormwater Plan
Wording A Stormwater Site Plan has been submitted and approved by the Department of Community Development. Once the subject permit has been issued the applicant shall fully implement the provisions of the submitted plan and contact the Jefferson County Department of Community Development to arrange a schedule to inspect the property for plan compliance. A Certificate of Occupancy will not be issued until the Department verifies plan compliance. No clearing for roadways or utilities shall occur on the project site until clearing necessary for the installation of temporary sedimentation and erosion control measures have been completed.


Case Findings
Below is a list of findings for this permit case. Findings typically record facts that the staff are using as the basis of their permit processing decisions.
Title: ACCESS/ADDRESS
Wording An adddress of 201 D Street, Port Hadlock has been assigned to the parcel. D Street is a county local access (C658909).

Title: LOT CREATED
Wording The lot was created through the South Port Townsend Subdivision on September 18, 1871. No AFN available.

Title: POTABLE WATER
Wording The parcel is served by the PUD #1 public water supply.

Title: CASE HISTORY
Wording A building permit (BLD03-0786) for a detached garage was finaled on July 5, 2005. A road approach permit (RAP03-0270) was finaled on January 14, 2005. A septic permit (SEP03-0047) was finaled on June 30, 2005. A road approach permit (RAP07-0164) will be issued with BLD07-0527).

Title: F-No ESAs Found
Wording The application was reviewed by the Jefferson County Department of Community Development for the presence of Environmentally Sensitive Areas (ESAs). The Department conducted a review and has concluded that the property DOES NOT contain Environmentally Sensitive Areas. However, future proposals will be subject to a new ESA review and conditions may be added if new ESAs are found on the property.

Title: F-Medium Stormwater
Wording The applicant is proposing to create or add 3048 square feet of impervious surface and 4013 square feet of land disturbing activities. JCC 18.30.060 and 18.30.070 require the project applicant submit a stormwater plan meeting Minimum Requirements #1 through #5 of the Department of Ecology Stormwater Management Manual for Western Washington. The stormwater plan shall address measures to control stormwater, erosion and sediment during construction and shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.

Title: F-SEPA Exempt
Wording Jefferson County determined that this proposal is categorically exempt from review under the State Environmental Policy Act (SEPA) pursuant to WAC 197-11-800(1)(b)(i).

Title: F-Site Plan Changes
Wording The site plan as submitted with the building permit application on September 28, 2007 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated November 9, 2007 shall be resubmitted for review and approval by Jefferson County Department of Community Development.

Title: F-Approval for _____ Only
Wording This approval is for a single family residence with attached garage and 100 gallon above-ground propane tank only. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits.

Title: ZONING
Wording The parcel has been designated as RR 1:5 under the Jefferson County Comprehensive Land Use Map effective August 28, 1998.

Title: DECLARATION OF REST COV
Wording A Declaration of Restrictive Covenant has been recorded on March 21, 2003 under AFN 467261 for the purpose of consolidating the lots to meet minimum land area requirements for on-site septic ad to allow zero lot line setbacks. The Covenant is strictly for building and septic purposes only.