Description:
|
| | |
File Archived
|
|
Date Completed:
|
| | |
6/30/2010
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - FINAL FINAL Building
|
|
Date Completed:
|
| | |
11/17/2009
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Propane Expiration Notice
|
|
Date Completed:
|
| | |
9/9/2009
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Change Status to RENEWED
|
|
Date Completed:
|
| | |
11/13/2008
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Propane Expiration Notice
|
|
Date Completed:
|
| | |
9/4/2008
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Issue Install/Demo Permit (F)
|
|
Date Completed:
|
| | |
10/22/2007
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Approve Permit-UF
|
|
Date Completed:
|
| | |
10/22/2007
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Review Complete-U
|
|
Date Completed:
|
| | |
10/22/2007
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Final Building
|
|
Date Completed:
|
| | |
11/17/2009
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Building Permit Application(F)
|
|
Date Completed:
|
| | |
9/6/2007
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
DRD Approval (Zoning)
|
|
Date Completed:
|
| | |
10/12/2007
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
App Substantially Complete-U
|
|
Date Completed:
|
| | |
10/12/2007
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Case Entered
|
|
Date Completed:
|
| | |
9/5/2007
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Plan Check
|
|
Date Completed:
|
| | |
10/15/2007
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Septic Review Complete-U
|
|
Date Completed:
|
| | |
9/6/2007
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Contractor License/Bond Info
|
|
Date Completed:
|
| | |
9/6/2007
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Stormwater Review-U
|
|
Date Completed:
|
| | |
10/12/2007
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Env. Sensitive Area Review-U
|
|
Date Completed:
|
| | |
10/12/2007
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Consistency Review-U
|
|
Date Completed:
|
| | |
10/22/2007
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
RAP Review Complete-U
|
|
Date Completed:
|
| | |
9/6/2007
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Final Public Works Approval
|
|
Date Completed:
|
| | |
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Copy of OAPCA Demo Apprvl Recd
|
|
Date Completed:
|
| | |
10/15/2007
|
|
Disposition:
|
| | |
DONE
|
|
|
Title:
|
| | |
F-AIR EMISSIONS
|
|
Wording
|
| | |
Asbestos-Containing Materials (ACM) have been encountered on site and could be present in air emissions generated during building demolition. Specific air monitoring and emission control programs will be defined as needed for individual demolition actitivies. The Washington State Department of Ecology's Air Quality Program (DOE) has the authority and jurisdiction over regulation of ACM removal and disposal. Detailed characterization of dust, paint and other media has been completed and shall be submitted along with specific removal procedures to DOE for permits and approval.
|
|
|
Title:
|
| | |
F-Confirmed ESAs
|
|
Wording
|
| | |
The application was reviewed by the Jefferson County Department of Community Development staff on October 12, 2007 for the potential presence of Environmentally Sensitive Areas (ESAs) under the provisions of the Unified Development Code (UDC). After an initial Geographic Information Systems mapping review and an investigative site inspection, the following ESAs were confirmed to be present on the subject property: Urban Shoreline Designation; Modified Shoreline Slope Stability; Seismic Hazard; Susceptible Aquifer Recharge Area; Coastal SIPZ.
|
|
|
Title:
|
| | |
F-Special Report Submitted
|
|
Wording
|
| | |
A Special Report was submitted by Sterling Technologies dated August 2007 in conjunction with the application to address the (list ESA).
|
|
|
Title:
|
| | |
F-Aquifer Recharge Area
|
|
Wording
|
| | |
Aquifer Recharge Areas in Jefferson County are characterized by porous geological formations that allow percolation of the surface water into the soils and the underlying zone of saturation. Aquifers are geologic formations that contain sufficient saturated permeable material to yield significant quantities of water to wells and springs. Aquifers serve as the source of drinking water within most of the rural portions of Jefferson County.
|
|
|
Title:
|
| | |
F-Susc. Aquifer Recharge Area
|
|
Wording
|
| | |
Susceptible Aquifer Recharge Areas are those with geologic and hydrologic conditions that promote rapid infiltration of recharge waters to groundwater aquifers.
|
|
|
Title:
|
| | |
F-Geohazard Area
|
|
Wording
|
| | |
Geologically Hazardous Areas in Jefferson County are characterized by slope, soil type, geologic material, and groundwater that may combine to create problems with slope stability, erosion, and water quality during and after construction or during natural events such as earthquakes or severe rainstorms.
|
|
|
Title:
|
| | |
F-Coastal SIPZ
|
|
Wording
|
| | |
The parcel is located within a coastal SIPZ (seawater intrusion protection zone) according to the County GIS map. There are voluntary and mandatory measures identified in the Jefferson County Seawater Intrusion Policy (Resolution 44-22, effective September 23, 2002) that apply to well drilling proposals and building permit applications on existing lots of record.
A Coastal SIPZ is defined as: all islands and area within one-quarter mile of marine shoreline, but no history of chloride concentration above 100 mg/L in groundwater sources within 1000 feet.
|
|
|
Title:
|
| | |
F-Stormwater
|
|
Wording
|
| | |
The applicant is proposing to create or add zero square feet of impervious surface and zero square feet of land disturbing activities. The stormwater management system for the Port Townsend Paper Mill facility consists of catch basins, manholes, and piping that collect stormwater from paved surfaces and buildings and convey it to a primary and secondary treatement system with an outfall that discharges to Port Townsend Bay (Glen Cove). Both treated and untreated plant wastewater discharges, along with site stormwater, are routed into the wastewater treatment system which is monitored in accordance with the plant's National Pollutant Discharge Elimination System (NPDES) permit WA-000092-2.
|
|
|
Title:
|
| | |
F-Site Plan Changes
|
|
Wording
|
| | |
The site plan as submitted with the Building Permit application on September 5, 2007 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated October 12, 2007 shall be resubmitted for review and approval by Jefferson County Department of Community Development.
|
|
|
Title:
|
| | |
F-APPROVAL FOR DEMOLITION ONLY
|
|
Wording
|
| | |
This approval is for above ground Demolition of an Existing Building only (concrete slab and equipment to remain). Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits.
|
|
|
Title:
|
| | |
ZONING
|
|
Wording
|
| | |
The parcel has been designated as Heavy Industrial under the Jefferson County Comprehensive Land Use Map effective August 28, 1998.
|
|