Case Number:BLD2007-00425 Case Status:Finaled Date Received:8/2/2007
Description:NEW SFR W/ ATTACHED GAR Date Issued:8/29/2007
Applicant:JAMES JACKSON Expiration Date:8/29/2008 12:00:00 AM
Site Address:31 2ND ST Case Finaled:5/20/2008
Parcel No:986400905 Other Cases Parcel Data Map It More Details Parcels Images

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: File Archived
Date Completed: 6/13/2008
Disposition: DONE
Description: Certificate of Occupancy-F
Date Completed: 5/23/2008
Disposition: DONE
Description: Insp - FINAL FINAL Building
Date Completed: 5/20/2008
Disposition: DONE
Description: Insp - Address Posted
Date Completed:
Disposition:
Description: Insp - Final Building
Date Completed: 5/20/2008
Disposition: DONE
Description: Insp - Insulation: Ceiling
Date Completed: 2/14/2008
Disposition: DONE
Description: Insp - Framing
Date Completed: 1/24/2008
Disposition: FAIL
Description: Insp - Framing
Date Completed: 1/31/2008
Disposition: DONE
Description: Insp - Rough-in Plumbing
Date Completed: 1/31/2008
Disposition: DONE
Description: Insp - Miscellaneous
Date Completed: 12/12/2007
Disposition: DONE
Description: Insp - Miscellaneous
Date Completed: 11/28/2007
Disposition: DONE
Description: Insp - Foundation Stem Wall
Date Completed: 10/30/2007
Disposition: DONE
Description: Insp - Foundation Footing
Date Completed: 10/30/2007
Disposition: DONE
Description: Insp - Foundation Stem Wall
Date Completed: 10/26/2007
Disposition: FAIL
Description: Approve Permit-UF
Date Completed: 8/31/2007
Disposition: DONE
Description: Issue Building Permit (F)
Date Completed: 8/29/2007
Disposition: DONE
Description: Approve Permit-UF
Date Completed: 8/28/2007
Disposition: DONE
Description: Print Dummy UDC Permit-UF
Date Completed: 8/28/2007
Disposition: DONE
Description: Review Complete-U
Date Completed: 8/28/2007
Disposition: DONE
Description: Det. of Completeness-UF
Date Completed: 8/28/2007
Disposition: DONE
Description: Insp - Setbacks
Date Completed: 10/24/2007
Disposition: DONE
Description: Insp - Foundation Footing
Date Completed: 10/24/2007
Disposition: DONE
Description: Insp - Foundation Stem Wall
Date Completed: 10/24/2007
Disposition: FAIL
Description: Insp - Straps (hold downs)
Date Completed: 12/7/2007
Disposition: DONE
Description: Insp - Ext. Shear Wall Nailing
Date Completed: 12/7/2007
Disposition: DONE
Description: Insp - Rough-in Plumbing
Date Completed: 1/24/2008
Disposition: FAIL
Description: Insp - Airseal
Date Completed: 1/24/2008
Disposition: DONE
Description: Insp - Insulation: Walls
Date Completed: 2/14/2008
Disposition: DONE
Description: Insp - Insulation: Floors
Date Completed:
Disposition:
Description: Insp - Int. Shear Wall Nailing
Date Completed: 2/26/2008
Disposition: DONE
Description: Insp - Drywell/Alt Drainage
Date Completed:
Disposition:
Description: Insp - Address Posted
Date Completed: 5/15/2008
Disposition: FAIL
Description: Insp - Final Building
Date Completed: 5/15/2008
Disposition: FAIL
Description: Septic System Finaled
Date Completed: 5/15/2008
Disposition: DONE
Description: Insp - Under Floor Framing
Date Completed: 11/27/2007
Disposition: DONE
Description: Insp - Wallboard Nailing
Date Completed: 2/26/2008
Disposition: DONE
Description: Building Permit Application(F)
Date Completed: 8/2/2007
Disposition: DONE
Description: App Substantially Complete-U
Date Completed: 8/28/2007
Disposition: DONE
Description: Case Entered
Date Completed: 8/2/2007
Disposition:
Description: Plan Check
Date Completed: 8/21/2007
Disposition: DONE
Description: Septic Review Complete-U
Date Completed: 8/17/2007
Disposition: DONE
Description: Potable Water Approval
Date Completed: 8/15/2007
Disposition: DONE
Description: Contractor License/Bond Info
Date Completed: 8/2/2007
Disposition: DONE
Description: Stormwater Review-U
Date Completed: 8/28/2007
Disposition: DONE
Description: Env. Sensitive Area Review-U
Date Completed: 8/28/2007
Disposition: DONE
Description: Consistency Review-U
Date Completed: 8/28/2007
Disposition: DONE
Description: RAP Review Complete-U
Date Completed: 8/2/2007
Disposition: DONE

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: Bld Security/hooded lights
Wording Lighting fixtures shall be designed and hooded to prevent the light source from being directly visible from outside the boundaries of the property. The intensity or brightness of all lighting, during construction and after project completion shall not adversely affect the use of surrounding properties or adjoining rights-of-way.

Title: Bld Exterior height lights
Wording Exterior lighting for residential uses shall not exceed twenty feet (20') in height from the finished grade, excepting when such lighting is an integral part of a building or structure. Ground level lighting is encouraged.

Title: Bld Setbacks
Wording Minimum setback from 2nd Street right-of-way shall be 20 feet. Minimum side and rear yard setbacks shall be 5 feet.

Title: Bld building height
Wording The building height is not to exceed 35 feet.

Title: Bld lot coverage
Wording Maximum lot coverage is not to exceed 25%. Lot coverage is defined as amount of impervious surface which includes roof tops, driveways, concrete, etc.

Title: SEPTIC CONDITION
Wording PRIOR TO OCCUPANCY & BUILDING FINAL, FINAL APPROVAL OF SEPTIC SEP06-205 IS REQUIRED.

Title: SEPTIC CONDITION
Wording A MINIMUM OF 10' MUST BE MAINTAINED BETWEEN BUILDING FOUNDATION AND EDGE OF DISPOSAL COMPONENT & RESERVE AREA. NORTHERN MOST EDGE OF FOUNDATION TO BE NO MORE THAN 54' FROM SOUTHERN PROPERTY LINE.

Title: SEPTIC CONDITION
Wording MUST COLLECT AND DIVERT ALL SOURCES OF DRAINAGE AWAY FROM SEPTIC TANK, RESERVE & DRAINFIELD.

Title: Outdoor Residential Storage
Wording Outdoor residential storage shall be maintained in an orderly manner and shall create no fire, safety, health or sanitary hazard.

Title: Unlicensed/Inoperable Vehicles
Wording Not more than 2 unlicensed vehicles shall be stored on any lot unless totally screened from view of neighboring dwellings and rights-of-way. Such screening shall meet all applicable performance and development standards specific to the district in which the storage is kept, and shall be in keeping with the character of the area. Screening shall meet the requirements of Chapter 18.30 JCC. Outdoor storage of 3 or more junk motor vehicles is prohibited except in those districts where specified as an autormobile wrecking yard or junk (or salvage) yard and allowed as a permitted use in Table 3-1 or Chapter 18.18 JCC, and such storage shall meet the requriements of JCC 18.20.100, Automobile wrecking yards and junk (or salvage) yards. In no case, shall any such junk motor vehicles be stored in a critical area.

Title: SFR PARKING
Wording A minimum of two (2) on-site parking spaces shall be provided for the single family residence.

Title: RAP - COUNTY
Wording The road approach permit (RAP07-0082) must be inspected and finaled by the Jefferson County Department of Public Works prior to the final inspection/certificate of occupancy of this residence. Contact Terry Duff, Department of Public Works at 360-385-9159 for the final road approach inspection.

Title: Aquifer Recharge Conditions (SFR)
Wording Critical Aquifer Recharge Areas may require special protection measures to mitigate water quality degradation. The submitted proposal does not require additional aquifer protection measures. However, during construction the project shall follow the Best Management Practices (BMPs) and facility design standards as identified and defined in the Stormwater Management Manual for the Puget Sound Basin.

Title: Stormwater Plan
Wording A Stormwater Site Plan has been submitted and approved by the Department of Community Development. Once the subject permit has been issued the applicant shall fully implement the provisions of the submitted plan and contact the Jefferson County Department of Community Development to arrange a schedule to inspect the property for plan compliance. A Certificate of Occupancy will not be issued until the Department verifies plan compliance. No clearing for roadways or utilities shall occur on the project site until clearing necessary for the installation of temporary sedimentation and erosion control measures have been completed.


Case Findings
Below is a list of findings for this permit case. Findings typically record facts that the staff are using as the basis of their permit processing decisions.
Title: ACCESS/ADDRESS
Wording An address of 31 2nd Street, Port Hadlock has been assigned to the parcel. 2nd Street is a county local access (C638409).

Title: LOT CREATED
Wording The lot was created through the Phillips to Irondale Subdivision on January 5, 1910 under AFN 29103.

Title: POTABLE WATER
Wording The site is served by the Quimper water system.

Title: CASE HISTORY
Wording A road approach permit (RAP07-0082) for a utility crossing was issued on May 29, 2007. A road approach permit (RAP07-0062) for an address was approved on May 11, 2007. A septic permit (SEP06-0205) was approved on August 13, 2007.

Title: F-Confirmed ESAs
Wording The application was reviewed by the Jefferson County Department of Community Development staff on August 28, 2007 for the potential presence of Environmentally Sensitive Areas (ESAs) under the provisions of the Unified Development Code (UDC). After an initial Geographic Information Systems mapping review and an investigative site inspection, the following ESAs were confirmed to be present on.the subject property: SARPA aquifer recharge area.

Title: F-Aquifer Recharge Area
Wording Aquifer Recharge Areas in Jefferson County are characterized by porous geological formations that allow percolation of the surface water into the soils and the underlying zone of saturation. Aquifers are geologic formations that contain sufficient saturated permeable material to yield significant quantities of water to wells and springs. Aquifers serve as the source of drinking water within most of the rural portions of Jefferson County.

Title: F-Susc. Aquifer Recharge Area
Wording Susceptible Aquifer Recharge Areas are those with geologic and hydrologic conditions that promote rapid infiltration of recharge waters to groundwater aquifers.

Title: F-Critical Aquifer Recharge Area
Wording Critical Aquifer Recharge Areas are defined as Seawater Intrusion Areas, and Special Aquifer Recharge Protection Areas and the following land uses located within Susceptible Aquifer Recharge Areas (1) All Industrial Land Uses (2) All Commercial Uses (3) All Rural Residential Land Uses requiring a Discretionary Use or Conditional Use Permit (4) All Rural Residential Land Uses with nonconforming uses that would otherwise require a Discretionary Use or Conditional Use Permit (5) Unsewered Planned Rural Residential Developments (6) Unsewered residential development with gross densities greater than one unit per acre. All of the above listed uses shall be subject to the applicable requirements and standards of the Jefferson County Unified Development Code.

Title: F-Medium Stormwater
Wording The applicant is proposing to create or add 2775 square feet of impervious surface and 3020 square feet of land disturbing activities. JCC 18.30.060 and 18.30.070 require the project applicant submit a stormwater plan meeting Minimum Requirements #1 through #5 of the Department of Ecology Stormwater Management Manual for Western Washington. The stormwater plan shall address measures to control stormwater, erosion and sediment during construction and shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.

Title: F-SEPA Exempt
Wording Jefferson County determined that this proposal is categorically exempt from review under the State Environmental Policy Act (SEPA) pursuant to WAC 197-11-800(1)(b)(i).

Title: F-Site Plan Changes
Wording The site plan as submitted with the building permit application on August 2, 2007 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated August 28, 2007 shall be resubmitted for review and approval by Jefferson County Department of Community Development.

Title: F-Approval for _____ Only
Wording This approval is for a single family residence with attached garage only. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits.

Title: ZONING
Wording The parcel has been designated as RR 1:5 under the Jefferson County Comprehensive Land Use Map effective August 28, 1998.

Title: DECLARATION OF REST COV
Wording A Declaration of Restrictive Covenant has been recorded on June 23, 2006 under AFN 512590 for the purpose of consolidating the lots to meet minimum land area requirements for on-site septic ad to allow zero lot line setbacks. The Covenant is strictly for building and septic purposes only.