Description:
|
| | |
File Archived
|
|
Date Completed:
|
| | |
2/2/2009
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - FINAL FINAL Building
|
|
Date Completed:
|
| | |
12/12/2007
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Final Building
|
|
Date Completed:
|
| | |
12/12/2007
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Final Building
|
|
Date Completed:
|
| | |
10/16/2007
|
|
Disposition:
|
| | |
FAIL
|
|
|
Description:
|
| | |
Issue Building Permit (F)
|
|
Date Completed:
|
| | |
9/10/2007
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Print Dummy UDC Permit-UF
|
|
Date Completed:
|
| | |
9/7/2007
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Review Complete-U
|
|
Date Completed:
|
| | |
9/7/2007
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Fire Protection
|
|
Date Completed:
|
| | |
12/12/2007
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Wallboard Nailing
|
|
Date Completed:
|
| | |
12/12/2007
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Insulation: Ceiling
|
|
Date Completed:
|
| | |
12/12/2007
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Insulation: Walls
|
|
Date Completed:
|
| | |
12/12/2007
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Framing
|
|
Date Completed:
|
| | |
12/12/2007
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Rough-in Plumbing
|
|
Date Completed:
|
| | |
12/12/2007
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Final Building
|
|
Date Completed:
|
| | |
10/9/2007
|
|
Disposition:
|
| | |
FAIL
|
|
|
Description:
|
| | |
Building Permit Application(F)
|
|
Date Completed:
|
| | |
7/19/2007
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
App Substantially Complete-U
|
|
Date Completed:
|
| | |
9/5/2007
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Case Entered
|
|
Date Completed:
|
| | |
7/19/2007
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Plan Check
|
|
Date Completed:
|
| | |
7/31/2007
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Septic Review Complete-U
|
|
Date Completed:
|
| | |
8/29/2007
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Potable Water Approval
|
|
Date Completed:
|
| | |
7/19/2007
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Contractor License/Bond Info
|
|
Date Completed:
|
| | |
7/19/2007
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Stormwater Review-U
|
|
Date Completed:
|
| | |
9/5/2007
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Env. Sensitive Area Review-U
|
|
Date Completed:
|
| | |
9/7/2007
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Consistency Review-U
|
|
Date Completed:
|
| | |
9/7/2007
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
RAP Review Complete-U
|
|
Date Completed:
|
| | |
7/19/2007
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Final Planning Approval
|
|
Date Completed:
|
| | |
10/9/2007
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Final Public Works Approval
|
|
Date Completed:
|
| | |
10/9/2007
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
DRD Approval (Zoning)
|
|
Date Completed:
|
| | |
9/7/2007
|
|
Disposition:
|
| | |
DONE
|
|
|
Title:
|
| | |
Bld Final Zoning Approval
|
|
Wording
|
| | |
The applicant and/or representative shall contact the Development Review Division of the Permit Center (360.379.4462) regarding a final inspection for compliance of zoning permit conditions prior to scheduling a final building inspection.
|
|
|
Title:
|
| | |
C-PARKING
|
|
Wording
|
| | |
A minimum of three (3) parking spaces are required for the office, of which one space shall be designated handicap parking.
|
|
|
Title:
|
| | |
C-PARKING
|
|
Wording
|
| | |
Should actual demand exceed the three spaces designated for the office, additional onsite parking shall be identified and created. The applicant shall contact the Department of Community Development at (360) 379-4450 to determine any permitting requirements.
|
|
|
Title:
|
| | |
C-ALL WEATHER
|
|
Wording
|
| | |
Parking areas shall be provided with an all-weather surface.
|
|
|
Title:
|
| | |
C-WHEEL STOPS
|
|
Wording
|
| | |
Wheel stops, striping, or similar measures are required for each parking space.
|
|
|
Title:
|
| | |
C-ADA PARKING SIGNAGE
|
|
Wording
|
| | |
Parking for physically handicapped needs shall be consistent with the Washington State regulations for barrier-free facilities (WAC 51-10) including proper signage.
|
|
|
Title:
|
| | |
C-LANDSCAPING
|
|
Wording
|
| | |
The existing landscaping areas shall be continually maintained and groomed.
|
|
|
Title:
|
| | |
C-NO SIGN IN ROW
|
|
Wording
|
| | |
No sign shall be placed in the public right-of-way or in the vision clearance triangle of intersections and curb cuts, unless otherwise approved by the Jefferson County Department of Public Works.
|
|
|
Title:
|
| | |
C-SIGN
|
|
Wording
|
| | |
Prior to erecting any advertising signs contact Department of Community Development. A sign permit may be required.
|
|
|
Title:
|
| | |
Aquifer Recharge Conditions (SFR)
|
|
Wording
|
| | |
Critical Aquifer Recharge Areas may require special protection measures to mitigate water quality degradation. The submitted proposal does not require additional aquifer protection measures. However, during construction the project shall follow the Best Management Practices (BMPs) and facility design standards as identified and defined in the Stormwater Management Manual for the Puget Sound Basin.
|
|
|
Title:
|
| | |
C-Small Stormwater
|
|
Wording
|
| | |
The project shall comply with Construction Stormwater Pollution Prevention (SWPP) Elements #1 through #12 of the Department of Ecology's Stormwater Management Manual for Western Washington to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.
|
|
|
Title:
|
| | |
F-USE
|
|
Wording
|
| | |
Jefferson County Code Title 18 Table 3.1 identifies personal and professional services as and allowed "Yes" use.
|
|
|
Title:
|
| | |
F-ACCESS
|
|
Wording
|
| | |
Chimacum Rd is a county major collector road identified as C932507. The approach is existing, and an address of 175 A & B Chimacum Rd has been assigned to the buildings.
|
|
|
Title:
|
| | |
F-PARKING
|
|
Wording
|
| | |
Personal and professional services and offices are required to have one space per 300 square feet of public space plus one space per employee but not fewer than 3 spaces. No less than 2% of the total number of parking spaces or a minimum or one (1) space, whichever is greater, shall be designated handicap parking and be no less than 12' 6" wide.
|
|
|
Title:
|
| | |
F-LANDSCAPING
|
|
Wording
|
| | |
A ten (10) foot visual buffer shall be provided along all street frontages. As no additional structures are proposed under this application, the administrator has determined the existing landscaping to be adequate as an alternative landscaping design. The existing landscaping areas shall be continually maintained and groomed.
|
|
|
Title:
|
| | |
F-SEP
|
|
Wording
|
| | |
A septic permit (SEP03-00094) for expansion/repair of the sewage disposal system was issued July 3, 2003.
|
|
|
Title:
|
| | |
F-BLD
|
|
Wording
|
| | |
A building permit (BLD02-00591) was issued for the building to change the use from a residence to a 4-unit motel. It was issued December 18, 2002 and finalled July 3, 2003.
A building permit (BLD02-00592) was issued for the building to change the use from a residence to a 4-unit motel. It was issued December 18, 2002 and finalled July 3, 2003.
A building permit (BLD03-00379) was issued for the building to change the use from an art gallery to a women's fitness center. It was issued July 29, 2003 and finaled August 6, 2003.
A building permit (BLD04-00359) was issued for a 12-unit, one story motel. It was issued July 14, 2006 and finalled July 18, 2007.
|
|
|
Title:
|
| | |
F-Confirmed ESAs
|
|
Wording
|
| | |
The application was reviewed by the Jefferson County Department of Community Development staff on September 5, 2007 for the potential presence of Environmentally Sensitive Areas (ESAs) under the provisions of the Unified Development Code (UDC). After an initial Geographic Information Systems mapping review and an investigative site inspection, the following ESAs were confirmed to be present on the subject property: Special Aquifer Recharge Protection Area.
|
|
|
Title:
|
| | |
F-Aquifer Recharge Area
|
|
Wording
|
| | |
Aquifer Recharge Areas in Jefferson County are characterized by porous geological formations that allow percolation of the surface water into the soils and the underlying zone of saturation. Aquifers are geologic formations that contain sufficient saturated permeable material to yield significant quantities of water to wells and springs. Aquifers serve as the source of drinking water within most of the rural portions of Jefferson County.
|
|
|
Title:
|
| | |
F-Critical Aquifer Recharge Area
|
|
Wording
|
| | |
Critical Aquifer Recharge Areas are defined as Seawater Intrusion Areas, and Special Aquifer Recharge Protection Areas and the following land uses located within Susceptible Aquifer Recharge Areas (1) All Industrial Land Uses (2) All Commercial Uses (3) All Rural Residential Land Uses requiring a Discretionary Use or Conditional Use Permit (4) All Rural Residential Land Uses with nonconforming uses that would otherwise require a Discretionary Use or Conditional Use Permit (5) Unsewered Planned Rural Residential Developments (6) Unsewered residential development with gross densities greater than one unit per acre. All of the above listed uses shall be subject to the applicable requirements and standards of the Jefferson County Unified Development Code.
|
|
|
Title:
|
| | |
F-Small Stormwater
|
|
Wording
|
| | |
No change in footprint or impervious surface is proposed under this application. JCC 18.30.060 and 18.30.070 require your proposal comply with Minimum Requirement #2 (Construction Stormwater Pollution Prevention) of the Department of Ecology Stormwater Management Manual for Western Washington to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.
|
|
|
Title:
|
| | |
F-SEPA Exempt
|
|
Wording
|
| | |
Jefferson County determined that this proposal is categorically exempt from review under the State Environmental Policy Act (SEPA) pursuant to WAC 197-11-800(3).
|
|
|
Title:
|
| | |
F-Site Plan Changes
|
|
Wording
|
| | |
The site plan as submitted with the building change of use application on July 19, 2007 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated September 5, 2007 shall be resubmitted for review and approval by Jefferson County Department of Community Development.
|
|
|
Title:
|
| | |
F-APPROVAL FOR OFFICE SPACE ONLY
|
|
Wording
|
| | |
This approval is for an office space only. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits.
|
|
|
Title:
|
| | |
ZONING
|
|
Wording
|
| | |
The parcel has been designated as Rural Village Center under the Jefferson County Comprehensive Land Use Map effective August 28, 1998.
|
|