Description:
|
| | |
File Archived
|
|
Date Completed:
|
| | |
2/9/2012
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Close Case "F"
|
|
Date Completed:
|
| | |
2/9/2012
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Footing Drains
|
|
Date Completed:
|
| | |
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Issue Building Permit (F)
|
|
Date Completed:
|
| | |
5/3/2007
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Approve Permit-UF
|
|
Date Completed:
|
| | |
5/3/2007
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Approve Permit-UF
|
|
Date Completed:
|
| | |
5/3/2007
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Print Dummy UDC Permit-UF
|
|
Date Completed:
|
| | |
5/3/2007
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Review Complete-U
|
|
Date Completed:
|
| | |
5/3/2007
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Ntc of App +14-Publish-U
|
|
Date Completed:
|
| | |
4/6/2007
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Ntc of App +14-APO-U
|
|
Date Completed:
|
| | |
4/6/2007
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Det. of Completeness-UF
|
|
Date Completed:
|
| | |
3/27/2007
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
App Substantially Complete-U
|
|
Date Completed:
|
| | |
3/27/2007
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Case Entered
|
|
Date Completed:
|
| | |
2/23/2007
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Stormwater Review-U
|
|
Date Completed:
|
| | |
5/3/2007
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Env. Sensitive Area Review-U
|
|
Date Completed:
|
| | |
4/2/2007
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Consistency Review-U
|
|
Date Completed:
|
| | |
5/3/2007
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
RAP Review Complete-U
|
|
Date Completed:
|
| | |
5/3/2007
|
|
Disposition:
|
| | |
DONE
|
|
|
Title:
|
| | |
DOE - CONSTRUCTION DEBRIS
|
|
Wording
|
| | |
Proper disposal of construction debris must be on land in such a manner that debris cannot enter the natural stormwater drainage system or cause water quality degradation of state waters.
|
|
|
Title:
|
| | |
DOE - NPDES
|
|
Wording
|
| | |
If there is potential discharge of stormwater, a Construction Stormwater National Pollution Discharge Elimination System (NPDES) permit will be required from DOE. The permit must be obtained before any clearing or grading or land disturbing activities. The proponent is responsible for contacting DOE should the project fit the above criteria. Further information can be obtained by calling Roberta Woods of DOE at (360) 407-6269.
|
|
|
Title:
|
| | |
HIGHWAY 20 CORRIDOR
|
|
Wording
|
| | |
CLEARING AND GRADING AND/OR LAND DISTURBING ACTIVITIES SHALL NOT ENCROACH UPON THE 30 FOOT VEGETATIVE BUFFER ADJACENT TO HIGHWAY 20. THE TREE CANAPY SHALL REMAIN IN TACT.
BASED ON LNPG 19.0 OF THE COMPREHENSIVE PLAN "THE SETBACK FROM THE RIGHT-OF-WAY OF SR 20 SHALL BE 50 FEET ON EACH SIDE OF THE HIGHWAY (COMPRISED OF A 30-FOOT BUFFER AND A 20-FOOT SETBACK FROM THE BUFFER), FOR NEW DEVELOPMENT, FROM THE INTERSECTION OF OLD FORT TOWNSEND ROAD AND SR 20 TO THE INCORPORATED BOUNDARY OF THE CITY OF PORT TOWNSEND."
|
|
|
Title:
|
| | |
Aquifer Recharge Conditions (SFR)
|
|
Wording
|
| | |
Critical Aquifer Recharge Areas may require special protection measures to mitigate water quality degradation. The submitted proposal does not require additional aquifer protection measures. However, during construction the project shall follow the Best Management Practices (BMPs) and facility design standards as identified and defined in the Stormwater Management Manual for the Puget Sound Basin.
|
|
|
Title:
|
| | |
BMPs
|
|
Wording
|
| | |
The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.
|
|
|
Title:
|
| | |
SEPA
|
|
Wording
|
| | |
S E P A (see below).
|
|
|
Title:
|
| | |
SEPA SUBSTANTIALLY COMPLETE
|
|
Wording
|
| | |
The stormwater permit application and environmental checklist were determined to be substantially complete March 27, 2007.
|
|
|
Title:
|
| | |
SEPA PUBLISHED
|
|
Wording
|
| | |
Notice of Type I Land Use Application (MLA07-00074) and Optional DNS process under WAC 197-11-355 was published April 11, 2007 edition of the Jefferson County Port Townsend Leader.
|
|
|
Title:
|
| | |
SEPA NOTICE MAILING
|
|
Wording
|
| | |
Notice of Type I Land Use Application (MLA07-00074) and Optional DNS process under WAC 197-11-355 was mailed April 10, 2007 to adjacent property owners within 300 feet of the subject parcel, agencies, applicant/representative, official posting places.
|
|
|
Title:
|
| | |
SEPA NOTICE LANGUAGE
|
|
Wording
|
| | |
Notice of Type I Land Use Application (MLA07-00074) and Optional DNS process under WAC 197-11-355 was published April 11, 2007 edition of the Jefferson County Port Townsend Leader and requested comments to be submitted to the Department of Community Development by 4:30p.m. on April 25, 2007 and that the Department expects to issue an optional DNS for this proposal. The notice further states that "This will be the only opportunity to make comments related to SEPA. There will not be another comment period after the threshold (final) SEPA determination is made".
|
|
|
Title:
|
| | |
SEPA REVIEW REQUEST
|
|
Wording
|
| | |
Staff requested review and comments on the Environmental Checklist from numerous agencies including the Jefferson County Public Works, Jefferson County Environmental Health Department, City of Port Townsend Building and Community Development, East Jefferson Fire Rescue, Washington State Department of Ecology, Washington State Department of Transportation, Jefferson County Assessor's office, Jefferson Transit, Port Gamble S'Klallam Tribe, Washington State Department of Natural Resources, Washington State Fish & Wildlife, Olympic Environmental Council, Jefferson County PUD #1, Port of Port Townsend.
Written comments dated April 12, 2007 were received by Jefferson County Department of Public Work. Written comments dated April 25, 2007 were received from Department of Ecology.
No comments were received from other agencies or any adjacent property owners.
All comments are hereby incorporated by reference.
|
|
|
Title:
|
| | |
SEPA REVIEW
|
|
Wording
|
| | |
Summary of Significant Environmental Comments:
EARTH: The proposal includes approximately 174,240 square feet of land disturbing activity. The applicant has submitted a preliminary drainage plan.
The proposal is subject to the requirements of Jefferson County Code (JCC) Section 18.30.060, Grading and JCC 18.30.070, Stormwater Management Standards. The JCC requires proponents for developments that meet these criteria to implement a Stormwater Site Plan that includes a Large Parcel Erosion and Sediment Control Plan and a Permanent Stormwater Quality Control Plan.
Based on the applicant's compliance with an approved Stormwater Site Plan that was reviewed by the Jefferson County Department of Public Works, the Department recommends finding that the proposal is not likely to result in significant adverse impacts related to erosion.
WATER: Surface: County GIS maps do not identify any surface waters (wetlands, streams, marine waters) on or near the subject parcel.
Groundwater: An Environmentally Sensitive Areas (ESA) check was conducted and the site is identified as a SARPA & SUSC aquifer recharge area. At such time of permit application, the specific use will be reviewed for consistency with JCC Section 18.15.240.
Water Run-Off (including stormwater): Washington State Department of Ecology (DOE) commented on the application stating that erosion control measures must be in place prior to any clearing, grading, or construction and must be effective to prevent stormwater runoff from carrying soil and other pollutants into surface water or storm drains that lead to waters of the state. Proper disposal of construction debris must be on land in such a manner that debris cannot enter the natural stormwater drainage system or cause water quality degradation of state waters. The proposal involves clearing and grading on 4 acres (174,240 square feet). The site is described as flat to hilly, indicating that there is potential for pre-project offsite discharge of stormwater. If there is potential discharge of stormwater, a Construction Stormwater National Pollution Discharge Elimination System (NPDES) permit will be required from DOE. The permit must be obtained before any clearing or grading or land disturbing activities. The proponent is responsible for contacting DOE should the project fit the above criteria. Further information can be obtained by calling Roberta Woods of DOE at (360) 407-6269.
Based on the applicant's compliance with an approved Stormwater Site Plan, the Department recommends finding that the proposal is not likely to result in significant adverse impacts related to stormwater runoff. Additional analysis of the proposal and its effects related to Water is not necessary.
PLANTS: Existing vegetation consists of salal, wild rose, blackberry, scot's broom, cedar, fir and madrona. To implement the intent of LNG 19.0 of the Comprehensive Plan to protect the forest corridor and tree canopy in the Glen Cove area, the following mitigation is required:
CLEARING AND GRADING AND/OR LAND DISTURBING ACTIVITIES SHALL NOT ENCROACH UPON THE 30 FOOT VEGETATIVE BUFFER ADJACENT TO HIGHWAY 20. THE TREE CANAPY SHALL REMAIN IN TACT.
THE SETBACK FROM THE RIGHT-OF-WAY OF SR 20 SHALL BE 50 FEET ON EACH SIDE OF THE HIGHWAY (COMPRISED OF A 30-FOOT BUFFER AND A 20-FOOT SETBACK FROM THE BUFFER), FOR NEW DEVELOPMENT, FROM THE INTERSECTION OF OLD FORT TOWNSEND ROAD AND SR 20 TO THE INCORPORATED BOUNDARY OF THE CITY OF PORT TOWNSEND.
Additional analysis of the proposal and its effects related to Plants is not necessary.
ANIMALS: An ESA check was conducted and no threatened or endangered species have been identified. No mitigation measures are recommended. Additional analysis of the proposal and its effects related to Animals is not necessary.
ENVIRONMENTAL HEALTH: No significant adverse environmental impacts have been identified. No mitigation measures are recommended. Additional analysis of t
|
|
|
Title:
|
| | |
SEPA APPEAL
|
|
Wording
|
| | |
Appeals of Type I permit decision must be in writing, conform with the procedures for appeal as set forth in UDC Section 8.5.2 and be filed within twenty-one (21) calendar days of the date of the issuance of the land use decision, as defined by the Land Use Petition Act, Chapter 36.70C.040(4), unless another time period is established by superseding state law or local ordinance. All appellants must timely exhaust all administrative remedies prior to filing a judicial appeal.
Notice of appeal and any other pleadings required to be filed with the court shall be served by delivery to the County Auditor (see RCW 4.28.080), and all persons identified in RCW 36.70C.040, within the applicable time period. This requirement is jurisdictional. The notice of appeal shall contain a concise statement identifying:
i.The decision being appealed and the identification of the application which is the subject of the appeal;
ii. The name, address, and phone number of the appellant and his/her interest in the matter.
iii. Appellant's statement describing standing to appeal (i.e., how he or she is affected by or interested in the decision);
iv. The specific reasons why the appellant believes the decision to be wrong. The appellant shall bear the burden of proving the decision was wrong;
v. The desired outcome or changes to the decision; and
vi. A statement that the appellant has read the appeal and believes the contents to be true, signed by the appellant.
The appellant shall be responsible for the cost of transcribing and preparing all records ordered certified by the court or desired by the appellant for the appeal. Prior to the preparation of any records, the appellant shall post an advance fee deposit in an amount specified by the County Auditor with the County Auditor. Any overage will be promptly returned to the appellant.
The Land Use Petition Act, 36.70C RCW shall govern judicial review of land use decisions. Any notice of appeal not in full compliance with this Section shall not be considered.
|
|
|
Title:
|
| | |
F-Confirmed ESAs
|
|
Wording
|
| | |
The application was reviewed by the Jefferson County Department of Community Development staff on March 27, 2007 for the potential presence of Environmentally Sensitive Areas (ESAs) under the provisions of the Unified Development Code (UDC). After an initial Geographic Information Systems mapping review and an investigative site inspection, the following ESAs were confirmed to be present on the subject property: SARPA & SUSC aquifer recharge area.
|
|
|
Title:
|
| | |
F-Aquifer Recharge Area
|
|
Wording
|
| | |
Aquifer Recharge Areas in Jefferson County are characterized by porous geological formations that allow percolation of the surface water into the soils and the underlying zone of saturation. Aquifers are geologic formations that contain sufficient saturated permeable material to yield significant quantities of water to wells and springs. Aquifers serve as the source of drinking water within most of the rural portions of Jefferson County.
|
|
|
Title:
|
| | |
F-Susc. Aquifer Recharge Area
|
|
Wording
|
| | |
Susceptible Aquifer Recharge Areas are those with geologic and hydrologic conditions that promote rapid infiltration of recharge waters to groundwater aquifers.
|
|
|
Title:
|
| | |
F-Critical Aquifer Recharge Area
|
|
Wording
|
| | |
Critical Aquifer Recharge Areas are defined as Seawater Intrusion Areas, and Special Aquifer Recharge Protection Areas and the following land uses located within Susceptible Aquifer Recharge Areas (1) All Industrial Land Uses (2) All Commercial Uses (3) All Rural Residential Land Uses requiring a Discretionary Use or Conditional Use Permit (4) All Rural Residential Land Uses with nonconforming uses that would otherwise require a Discretionary Use or Conditional Use Permit (5) Unsewered Planned Rural Residential Developments (6) Unsewered residential development with gross densities greater than one unit per acre. All of the above listed uses shall be subject to the applicable requirements and standards of the Jefferson County Unified Development Code.
|
|
|
Title:
|
| | |
F-Stormwater
|
|
Wording
|
| | |
The applicant is proposing 174,240 square feet of land disturbing activities.
|
|
|
Title:
|
| | |
F-Site Plan Changes
|
|
Wording
|
| | |
The site plan as submitted with the stormwater permit application on February 14, 2007 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated May 3, 2007 shall be resubmitted for review and approval by Jefferson County Department of Community Development.
|
|
|
Title:
|
| | |
F-APPROVAL FOR SW ONLY
|
|
Wording
|
| | |
This approval is for a stormwater management permit only. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits.
|
|