Permit Case Summary

Case Number: Search Help

Case Number:BLD2006-00350 Case Status:Finaled Date Received:6/20/2006
Description:CONVERT EXIST UNHTD GARAGE TO HTD SPACE, NEW ATT HTD ART STUDIO Date Issued:7/17/2006
Applicant:THOMAS GAMBILL Expiration Date:7/17/2009 12:00:00 AM
Site Address:91 W FITCHBURG AVE Case Finaled:9/28/2009
Parcel No:999501003 Other Cases Parcel Data Map It More Details Parcels Images

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: File Archived
Date Completed: 6/30/2010
Disposition: DONE
Description: Insp - FINAL FINAL Building
Date Completed: 9/28/2009
Disposition: DONE
Description: Meeting
Date Completed:
Disposition:
Description: Plan Check
Date Completed: 8/18/2009
Disposition: DONE
Description: Inspection Reminder Sent
Date Completed: 6/3/2009
Disposition: DONE
Description: Change Status to RENEWED
Date Completed: 7/17/2008
Disposition: DONE
Description: Inspection Reminder Sent
Date Completed: 6/18/2008
Disposition: DONE
Description: Change Status to RENEWED
Date Completed: 8/2/2006
Disposition: DONE
Description: Issue Building Permit (F)
Date Completed: 7/17/2006
Disposition: DONE
Description: Approve Permit-UF
Date Completed: 7/17/2006
Disposition: DONE
Description: Print Dummy UDC Permit-UF
Date Completed: 7/14/2006
Disposition: DONE
Description: Review Complete-U
Date Completed: 7/14/2006
Disposition: DONE
Description: Insp - Post Holes
Date Completed:
Disposition:
Description: Insp - Setbacks
Date Completed: 8/1/2006
Disposition: DONE
Description: Insp - Erosion Control
Date Completed:
Disposition:
Description: Insp - Footing
Date Completed:
Disposition:
Description: Insp - Straps
Date Completed:
Disposition:
Description: Insp - Shear Wall Nailing
Date Completed: 8/8/2006
Disposition: DONE
Description: Insp - Rough-in Plumbing
Date Completed: 8/17/2006
Disposition: DONE
Description: Insp - Gas Line: Interior
Date Completed:
Disposition:
Description: Insp - Gas Line: Exterior
Date Completed:
Disposition:
Description: Insp - Propane Tank
Date Completed:
Disposition:
Description: Insp - Heat/Chimney Clearance
Date Completed:
Disposition:
Description: Insp - Framing
Date Completed: 8/8/2006
Disposition: DONE
Description: Insp - Airseal
Date Completed:
Disposition:
Description: Insp - Insulation: Walls
Date Completed: 8/22/2006
Disposition: DONE
Description: Insp - Insulation: Floors
Date Completed:
Disposition:
Description: Insp - Insulation: Ceiling
Date Completed:
Disposition:
Description: Insp - Int. Shear Wall Nailing
Date Completed:
Disposition:
Description: Insp - Drywell/Alt Drainage
Date Completed:
Disposition:
Description: Insp - Address Posted
Date Completed:
Disposition:
Description: Insp - Final Building
Date Completed: 9/28/2009
Disposition: DONE
Description: Septic System Finaled
Date Completed: 9/14/2009
Disposition: DONE
Description: Insp - Blocking
Date Completed:
Disposition:
Description: Insp - Wallboard Nailing
Date Completed:
Disposition:
Description: Document Recorded
Date Completed: 7/11/2006
Disposition: DONE
Description: PLAN CHK - Addt'l Info Request
Date Completed: 7/13/2006
Disposition: DONE
Description: Additional Info Request-U
Date Completed: 7/11/2006
Disposition: DONE
Description: Det. of Completeness-UF
Date Completed: 7/5/2006
Disposition: DONE
Description: Building Permit Application(F)
Date Completed: 6/20/2006
Disposition: DONE
Description: App Substantially Complete-U
Date Completed: 7/5/2006
Disposition: DONE
Description: Case Entered
Date Completed: 6/20/2006
Disposition:
Description: Plan Check
Date Completed: 7/14/2006
Disposition: DONE
Description: Septic Review Complete-U
Date Completed: 7/3/2006
Disposition: DONE
Description: Potable Water Approval
Date Completed: 6/20/2006
Disposition: DONE
Description: Contractor License/Bond Info
Date Completed: 6/20/2006
Disposition: DONE
Description: Stormwater Review-U
Date Completed: 7/5/2006
Disposition: DONE
Description: Env. Sensitive Area Review-U
Date Completed: 7/5/2006
Disposition: DONE
Description: Consistency Review-U
Date Completed: 7/14/2006
Disposition: DONE
Description: RAP Review Complete-U
Date Completed: 6/20/2006
Disposition: DONE

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: Bld Security/hooded lights
Wording Lighting fixtures shall be designed and hooded to prevent the light source from being directly visible from outside the boundaries of the property. The intensity or brightness of all lighting, during construction and after project completion shall not adversely affect the use of surrounding properties or adjoining rights-of-way.

Title: Bld Exterior height lights
Wording Exterior lighting for residential uses shall not exceed twenty feet (20') in height from the finished grade, excepting when such lighting is an integral part of a building or structure. Ground level lighting is encouraged.

Title: Bld Setbacks
Wording Minimum setback from W Fitchberg St right-of-way is 20 ft. Minimum setbacks from the easements along the western and southern boundaries are 20 ft. Minimum side and rear setbacks are 5 ft.

Title: Bld building height
Wording The building height is not to exceed 35 feet.

Title: Bld lot coverage
Wording Maximum lot coverage is not to exceed 25%. Lot coverage is defined as amount of impervious surface which includes roof tops, driveways, concrete, etc.

Title: Outdoor Residential Storage
Wording Outdoor residential storage shall be maintained in an orderly manner and shall create no fire, safety, health or sanitary hazard.

Title: Unlicensed/Inoperable Vehicles
Wording Not more than two (2) unlicensed or inoperable vehicles shall be stored on any lot less than one-half acre unless totally screened from view of neighboring dwellings and rights-of-way. Such screening shall meet all applicable performance and development standards specific to the district in which the storage is kept, and shall be in keeping with the character of the area. Screening shall meet the requirements of Unified Development Code (UDC) Section 6. Outdoor storage of thirteen (13) or more unlicensed or inoperable vehicles is prohibited except in those districts where specified as an automobile wrecking yard or junk (or salvage) yard and allowed as a Permitted Use in Table 3-1 of the UDC, and such storage shall meet the requirements of UDC Section 4.10. In no case, shall any such unlicensed or inoperable vehiclesbe stored in an Environmentally Sensitive Area (ESA).

Title: C-MIN REQ #2
Wording The project shall comply with Construction Stormwater Pollution Prevention (SWPP) Elements #1 through #12 of the Department of Ecology's Stormwater Management Manual for Western Washington to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.

Title: Aquifer Recharge Conditions (SFR)
Wording Critical Aquifer Recharge Areas may require special protection measures to mitigate water quality degradation. The submitted proposal does not require additional aquifer protection measures. However, during construction the project shall follow the Best Management Practices (BMPs) and facility design standards as identified and defined in the Stormwater Management Manual for the Puget Sound Basin.

Title: BMPs
Wording The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.


Case Findings
Below is a list of findings for this permit case. Findings typically record facts that the staff are using as the basis of their permit processing decisions.
Title: F- NO PROTEST AGMT
Wording A Declaration Covenant Irondale/Hadlock Sanitary Sewer No Protest Agreement was recorded July 11, 2006 under AFN 513221 with the Jefferson County Auditor.

Title: F-ZON
Wording This parcel has been designated as Rural Residential 1:5 under the Jefferson County Comprehensive Plan Land Use Map effective August 28, 1998.

Title: F-SEP
Wording A septic permit (SEP82-00056) was finaled on December 27, 1984 for a system of 360 gallons per day / for a 3 bedroom system.

Title: F-RAP
Wording W Fitchberg Ave is a local access road (C642609). The road approach is existing and an address of 91 W Fitchberg Ave has been assigned to the parcel.

Title: F-SUB
Wording This parcel was created through the Woodland Acres Division One under AFN 237481, filed of record October 11, 2006 in Volume 6 of Plats, page 13 with Jefferson County Auditor's office

Title: F-Confirmed ESAs
Wording The application was reviewed by the Jefferson County Department of Community Development staff on July 5, 2006 for the potential presence of Environmentally Sensitive Areas (ESAs) under the provisions of the Unified Development Code (UDC). After an initial Geographic Information Systems mapping review and an investigative site inspection, the following ESAs were confirmed to be present on the subject property: Special Aquifer Recharge Protection Areas (SARPA).

Title: F-Aquifer Recharge Area
Wording Aquifer Recharge Areas in Jefferson County are characterized by porous geological formations that allow percolation of the surface water into the soils and the underlying zone of saturation. Aquifers are geologic formations that contain sufficient saturated permeable material to yield significant quantities of water to wells and springs. Aquifers serve as the source of drinking water within most of the rural portions of Jefferson County.

Title: F-Critical Aquifer Recharge Area
Wording Critical Aquifer Recharge Areas are defined as Seawater Intrusion Areas, and Special Aquifer Recharge Protection Areas and the following land uses located within Susceptible Aquifer Recharge Areas (1) All Industrial Land Uses (2) All Commercial Uses (3) All Rural Residential Land Uses requiring a Discretionary Use or Conditional Use Permit (4) All Rural Residential Land Uses with nonconforming uses that would otherwise require a Discretionary Use or Conditional Use Permit (5) Unsewered Planned Rural Residential Developments (6) Unsewered residential development with gross densities greater than one unit per acre. All of the above listed uses shall be subject to the applicable requirements and standards of the Jefferson County Unified Development Code.

Title: F-Stormwater
Wording The applicant is proposing to create or add 308 square feet of impervious surface and 240 square feet of land disturbing activities. Sections 6.6 and 6.7 of the Jefferson County Unified Development Code requires that your proposal shall adhere to Best Managment Prcatices (BMPs).

Title: F-SEPA Exempt
Wording Jefferson County determined that this proposal is categorically exempt from review under the State Environmental Policy Act (SEPA) pursuant to WAC 197-11-800(1)(b)(i).

Title: F-Site Plan Changes
Wording The site plan as submitted with the building permit application on June 20, 2006 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated July 5, 2006 shall be resubmitted for review and approval by Jefferson County Department of Community Development.

Title: F-APPROVAL FOR GAR ALT & ADD ONLY
Wording This approval is for converting xisting unheated garage to heated space and a new attached garage and a new attached carport only. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits.