Permit Case Summary

Case Number: Search Help

Case Number:BLD2005-00783 Case Status:Finaled Date Received:12/23/2005
Description:NSFR W/ATT GARAGE Date Issued:4/3/2006
Applicant:DARYL RUDOLPH Expiration Date:4/3/2008 12:00:00 AM
Site Address:58 N MAPLE ST Case Finaled:8/21/2006
Parcel No:952800305 Other Cases Parcel Data Map It More Details Parcels Images

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: File Archived
Date Completed: 11/29/2007
Disposition: DONE
Description: Insp - FINAL FINAL Building
Date Completed: 8/21/2006
Disposition: DONE
Description: Insp - Final Building
Date Completed: 8/21/2006
Disposition: DONE
Description: Insp - Airseal
Date Completed: 6/12/2006
Disposition: DONE
Description: Insp - Framing
Date Completed:
Disposition:
Description: Insp - Shear Wall Nailing
Date Completed: 5/15/2006
Disposition: DONE
Description: Change Status to RENEWED
Date Completed: 4/19/2006
Disposition: DONE
Description: Issue Building Permit (F)
Date Completed: 4/3/2006
Disposition: DONE
Description: Approve Permit-UF
Date Completed: 4/3/2006
Disposition: DONE
Description: Det. of Completeness-UF
Date Completed: 1/4/2006
Disposition: DONE
Description: Insp - Setbacks
Date Completed: 4/5/2006
Disposition: DONE
Description: Insp - Erosion Control
Date Completed:
Disposition:
Description: Insp - Footing
Date Completed: 4/5/2006
Disposition: DONE
Description: Insp - Foundation Footing
Date Completed:
Disposition:
Description: Insp - Foundation Stem Wall
Date Completed: 4/11/2006
Disposition: DONE
Description: Insp - Straps
Date Completed:
Disposition:
Description: Insp - Shear Wall Nailing
Date Completed: 5/11/2006
Disposition: FAIL
Description: Insp - Rough-in Plumbing
Date Completed: 6/6/2006
Disposition: DONE
Description: Insp - Underground Plumbing
Date Completed:
Disposition:
Description: Insp - Gas Line: Interior
Date Completed:
Disposition:
Description: Insp - Gas Line: Exterior
Date Completed:
Disposition:
Description: Insp - Propane Tank
Date Completed:
Disposition:
Description: Insp - Heat/Chimney Clearance
Date Completed:
Disposition:
Description: Insp - Framing
Date Completed: 4/14/2006
Disposition: DONE
Description: Insp - Airseal
Date Completed: 6/6/2006
Disposition: DONE
Description: Insp - Insulation: Walls
Date Completed: 6/12/2006
Disposition: DONE
Description: Insp - Insulation: Floors
Date Completed:
Disposition:
Description: Insp - Insulation: Ceiling
Date Completed:
Disposition:
Description: Insp - Int. Shear Wall Nailing
Date Completed:
Disposition:
Description: Insp - Drywell/Alt Drainage
Date Completed:
Disposition:
Description: Insp - Address Posted
Date Completed:
Disposition:
Description: Insp - Final Building
Date Completed: 8/17/2006
Disposition: FAIL
Description: Septic System Finaled
Date Completed:
Disposition:
Description: Insp - Blocking
Date Completed:
Disposition:
Description: Insp - Wallboard Nailing
Date Completed:
Disposition:
Description: Building Permit Application(F)
Date Completed: 12/23/2005
Disposition: DONE
Description: App Substantially Complete-U
Date Completed: 1/4/2006
Disposition: DONE
Description: Case Entered
Date Completed: 12/23/2005
Disposition:
Description: Plan Check
Date Completed: 12/30/2005
Disposition: DONE
Description: Septic Review Complete-U
Date Completed: 4/3/2006
Disposition: DONE
Description: Potable Water Approval
Date Completed: 1/24/2006
Disposition: DONE
Description: Contractor License/Bond Info
Date Completed: 12/23/2005
Disposition: DONE
Description: Stormwater Review-U
Date Completed: 1/4/2006
Disposition: DONE
Description: Env. Sensitive Area Review-U
Date Completed: 1/4/2006
Disposition: DONE
Description: Consistency Review-U
Date Completed: 4/3/2006
Disposition: DONE
Description: RAP Review Complete-U
Date Completed: 3/30/2006
Disposition: DONE

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: Bld Setbacks
Wording Minimum setback from Irondale Rd right-of-way is 30 ft. Minimum setback from N Maple St right-of-way are 20 ft. Minimum side and rear setbacks are 5 ft,

Title: Bld building height
Wording The building height is not to exceed 35 feet.

Title: Bld lot coverage
Wording Maximum lot coverage is not to exceed 25%. Lot coverage is defined as amount of impervious surface which includes roof tops, driveways, concrete, etc.

Title: Outdoor Residential Storage
Wording Outdoor residential storage shall be maintained in an orderly manner and shall create no fire, safety, health or sanitary hazard.

Title: Unlicensed/Inoperable Vehicles
Wording Not more than two (2) unlicensed or inoperable vehicles shall be stored on any lot less than one-half acre unless totally screened from view of neighboring dwellings and rights-of-way. Such screening shall meet all applicable performance and development standards specific to the district in which the storage is kept, and shall be in keeping with the character of the area. Screening shall meet the requirements of Unified Development Code (UDC) Section 6. Outdoor storage of thirteen (13) or more unlicensed or inoperable vehicles is prohibited except in those districts where specified as an automobile wrecking yard or junk (or salvage) yard and allowed as a Permitted Use in Table 3-1 of the UDC, and such storage shall meet the requirements of UDC Section 4.10. In no case, shall any such unlicensed or inoperable vehiclesbe stored in an Environmentally Sensitive Area (ESA).

Title: C-MIN REQ #2
Wording The project shall comply with Construction Stormwater Pollution Prevention (SWPP) Elements #1 through #12 of the Department of Ecology's Stormwater Management Manual for Western Washington to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.

Title: C-PARKING
Wording A minimum of two (2) on-site parking spaces are required for the single family residence.

Title: Aquifer Recharge Conditions (SFR)
Wording Critical Aquifer Recharge Areas may require special protection measures to mitigate water quality degradation. The submitted proposal does not require additional aquifer protection measures. However, during construction the project shall follow the Best Management Practices (BMPs) and facility design standards as identified and defined in the Stormwater Management Manual for the Puget Sound Basin.

Title: Seawater Intrusion Areas
Wording To help prevent seawater from intruding landward into underground aquifers, all new development activity on Marrowstone Island, Indian Island and within 1/4 mile of any marine shoreline shall be required to infiltrate all stormwater runoff onsite.

Title: Coastal & At Risk SIPZ-Water Con
Wording VOLUNTARY MEASURES OF COASTAL & AT RISK SIPZ: Water conservation measures: 1. Roof and other intercepted precipitation shall be routed to on-site detention ponds and/or other approved means and allowed to be released to the soil slowly. 2. Water collected from Storm water and roof catchments may be used for watering lawns and gardens. Unless catchment water has been treated to meet drinking water standards, there shall be no cross connections allowed between the potable supply and impounded water. 3. Water withdrawn from wells on each property shall not be used for watering of lawns and/or gardens. 4. Ground water withdrawn from each property shall be restricted to a rate of three (3) gallons per minute. 5. Installation of water conserving fixtures such as low flow toilets, faucets and shower restrictors and other water saving plumbing fixtures. 6. Landscaping plan (xeriscaping, native vegetation with minimal amounts of irrigation). Please NOTE that the above listed measures are not intended to be exhaustive, but rather is intended to be illustrative of the types of water conservation measures.

Title: Coastal & At Risk SIPZ-Measures
Wording VOLUNTARY MEASURES OF COASTAL & AT RISK SIPZ: 1. Installation of a flow meter. 2. On-going well monitoring for chloride concentration. 3. Submittal of monitoring data to County.

Title: Coastal SIPZ-Mand Potable Water
Wording MANDATORY MEASURES FOR COASTAL SIPZ: 1. For proof of potable water on a building permit application, applicant must utilize DOH-approved public water system if available. 2. If public water is unavailable, a qualifying alternative system may be used as proof of potable water or an individual well may be used as proof of potable water subject to the following requirement: a. Chloride concentration of a laboratory-certified well water sample submitted with building permit application. 3. If public water is unavailable, a qualifying alternative system may be used as proof of potable water.

Title: BMPs
Wording The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.


Case Findings
Below is a list of findings for this permit case. Findings typically record facts that the staff are using as the basis of their permit processing decisions.
Title: F-ZON
Wording This parcel has been designated as Rural Residential 1:5 under the Jefferson County Comprehensive Plan Land Use Map effective August 28, 1998.

Title: F-SEP
Wording A septic permit (SEP06-00001) was approved on April 3, 2006 for a system of 240 gallons per day.

Title: F-RAP
Wording N Maple St (C637909) is a road within a statutory vacated plat. An address of 58 N Maple St has been assigned to the parcel.

Title: F-SUB
Wording These parcels were created through the Garfield's Addition, filed of record January 17, 1890 in Plat Book 2, page 39 with Jefferson County Auditor's office.

Title: F-BLA
Wording A Boundary Line Adjustment application (SUB05-00054) was finaled on March 30, 2006 to consolidate Blk 3, Lots 11, 12 & 13 of Garfield's Addition. Statement of Intent recorded under AFN 509511. Final survey recorded under AFN 509683

Title: F-Confirmed ESAs
Wording The application was reviewed by the Jefferson County Department of Community Development staff on January 4, 2006 for the potential presence of Environmentally Sensitive Areas (ESAs) under the provisions of the Unified Development Code (UDC). After an initial Geographic Information Systems mapping review and an investigative site inspection, the following ESAs were confirmed to be present on the subject property: Susceptible Aquifer Recharge Areas and Coastal Seawater Intrusion Protection Zones (SIPZ).

Title: F-Aquifer Recharge Area
Wording Aquifer Recharge Areas in Jefferson County are characterized by porous geological formations that allow percolation of the surface water into the soils and the underlying zone of saturation. Aquifers are geologic formations that contain sufficient saturated permeable material to yield significant quantities of water to wells and springs. Aquifers serve as the source of drinking water within most of the rural portions of Jefferson County.

Title: F-Susc. Aquifer Recharge Area
Wording Susceptible Aquifer Recharge Areas are those with geologic and hydrologic conditions that promote rapid infiltration of recharge waters to groundwater aquifers.

Title: F-SIPZ
Wording Marine shorelines and islands are susceptible to a condition that is known as seawater intrusion. Seawater intrusion is a condition in which the saltwater/freshwater interface in an aquifer moves inland so that wells drilled on upland areas cannot obtain freshwater suitable for public consumption without significant additional treatment and cost. Maintaining a stable balance in the saltwater/freshwater interface is primarily a function of the rate of aquifer recharge (primarily through rainfall) and the rate of groundwater withdrawals (primarily through wells). The Washington Department of Ecology is the agency with statutory authority to regulate groundwater withdrawal for individual wells in Jefferson County. New development, redevelopment, and land use activities on islands and in close proximity to marine shorelines in particular should be developed in such a manner to maximize aquifer recharge and maintain the saltwater/freshwater balance to the maximum extent possible by infiltrating stormwater runoff so that it recharges the aquifer.

Title: F-Coastal SIPZ
Wording The parcel is located within a coastal SIPZ (seawater intrusion protection zone) according to the County GIS map. There are voluntary and mandatory measures identified in the Jefferson County Seawater Intrusion Policy (Resolution 44-22, effective September 23, 2002) that apply to well drilling proposals and building permit applications on existing lots of record. A Coastal SIPZ is defined as: all islands and area within one-quarter mile of marine shoreline, but no history of chloride concentration above 100 mg/L in groundwater sources within 1000 feet.

Title: F-Stormwater
Wording The applicant is proposing to create or add 1989 square feet of impervious surface and 1800 square feet of land disturbing activities. Sections 6.6 and 6.7 of the Jefferson County Unified Development Code requires that your proposal shall adhere to Best Management Practices (BMPs).

Title: F-SEPA Exempt
Wording Jefferson County determined that this proposal is categorically exempt from review under the State Environmental Policy Act (SEPA) pursuant to WAC 197-11-800(1)(b)(i).

Title: F-Site Plan Changes
Wording The site plan as submitted with the building permit application on December 23, 2005 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated April 3, 2006 shall be resubmitted for review and approval by Jefferson County Department of Community Development.

Title: F-APPROVAL FOR SFR W ATT GAR ONLY
Wording This approval is for a single family residence with attached garage only. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits.