Description:
|
| | |
File Archived
|
|
Date Completed:
|
| | |
11/29/2007
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
File Archived
|
|
Date Completed:
|
| | |
7/17/2007
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - FINAL FINAL Building
|
|
Date Completed:
|
| | |
4/20/2006
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Final Building
|
|
Date Completed:
|
| | |
4/20/2006
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Issue Building Permit (F)
|
|
Date Completed:
|
| | |
1/26/2006
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Approve Permit-UF
|
|
Date Completed:
|
| | |
1/24/2006
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Review Complete-U
|
|
Date Completed:
|
| | |
1/24/2006
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
PLAN CHK - Addt'l Info Request
|
|
Date Completed:
|
| | |
1/17/2006
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Building Permit Application(F)
|
|
Date Completed:
|
| | |
12/5/2005
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
App Substantially Complete-U
|
|
Date Completed:
|
| | |
1/6/2006
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Case Entered
|
|
Date Completed:
|
| | |
12/5/2005
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Plan Check
|
|
Date Completed:
|
| | |
1/17/2006
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Contractor License/Bond Info
|
|
Date Completed:
|
| | |
12/6/2005
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Stormwater Review-U
|
|
Date Completed:
|
| | |
1/6/2006
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Env. Sensitive Area Review-U
|
|
Date Completed:
|
| | |
1/6/2006
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Consistency Review-U
|
|
Date Completed:
|
| | |
1/24/2006
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
RAP Review Complete-U
|
|
Date Completed:
|
| | |
12/6/2005
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Final Planning Approval
|
|
Date Completed:
|
| | |
1/24/2006
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Final Public Works Approval
|
|
Date Completed:
|
| | |
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
DRD Approval (Zoning)
|
|
Date Completed:
|
| | |
1/24/2006
|
|
Disposition:
|
| | |
DONE
|
|
|
Title:
|
| | |
Bld Custom Condition
|
|
Wording
|
| | |
This fire protection system plan is approved for permitting PROVIDED: that performance under the issuance of a permit for this project shall be completed prior to final occupancy permit for bld 04-00418 (the Inn at Port Hadlock) or the applicant must receive acceptance from Jefferson County of an approved bond for the marina improvements.
|
|
|
Title:
|
| | |
C-HPA
|
|
Wording
|
| | |
HPA 103845-1 was issued by the WA State Department of Fish & Wildlife on January 13, 2006 for this proposal. The applicant is required to comply with the provisions of the HPA.
|
|
|
Title:
|
| | |
C-EXEMPT MAINTENANCE
|
|
Wording
|
| | |
The development shall be essentially the same as the original in location, size, configuration, and external appearance.
|
|
|
Title:
|
| | |
C-FILL
|
|
Wording
|
| | |
No fill or other material may be placed in the waters or intertidal areas of Jefferson County.
|
|
|
Title:
|
| | |
C-TREATED LUMBER
|
|
Wording
|
| | |
All lumber and other materials treated with preservative shall be sufficiently cured to minimize leaching into the water or shore bed, in accordance with the Best Management Practices approved by the Washington Department of Fish and Wildlife.
|
|
|
Title:
|
| | |
C-UTILITIES
|
|
Wording
|
| | |
Utility service on docks and piers shall be placed on or under the deck. Overhead utility service is prohibited. Lighting shall be shielded to prevent unnecessary glare off-site and to minimize hazards to navigation. Overhead lighting for recreational structures shall be prohibited. (Per Performance Standard 7 of Section 5.60 - Docks, Piers, & Floats).
|
|
|
Title:
|
| | |
BMPs
|
|
Wording
|
| | |
The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.
|
|
|
Title:
|
| | |
Stormwater Plan
|
|
Wording
|
| | |
A Stormwater Plan has been submitted and approved by the Department of Community Development. Once the subject permit has been issued the applicant shall fully implement the provisions of the submitted plan and contact the Jefferson County Department of Community Development to arrange a schedule to inspect the property for plan compliance. A Certificate of Occupancy will not be issued until the Department verifies plan compliance. No clearing for roadways or utilities shall occur on the project site until clearing necessary for the installation of temporary sedimentation and erosion control measures have been completed.
|
|
|
Title:
|
| | |
Hydraulic Code/HPA Check
|
|
Wording
|
| | |
Prior to commencing development activity, proponent is responsible for informing the Washington Department of Fish and Wildlife (WDFW) in order for WDFW to determine whether this action is subject to the Washington State Hydraulic Code (Chapter 220-10 WAC). Hydraulic Project Approval (HPA) is required for all hydraulic projects, which are defined as construction or performance of other work that will use, divert, obstruct, or change the natural flow or bed of any of the salt or fresh waters of the state.
|
|
|
Title:
|
| | |
Comply with HPA
|
|
Wording
|
| | |
In addition to Jefferson County permit conditions, the project proponent shall comply with all conditions set forth by the Washington Department of Fish and Wildlife through Hydraulic Project Approval.
|
|
|
Title:
|
| | |
Army Corps Check
|
|
Wording
|
| | |
Prior to commencing development activity, the proponent is responsible for informing the US Army Corps of Engineers (COE) in order for COE to determine whether a Department of the Army permit or review is required. Generally, review is required for construction and dredging in or around navigable waters of the US and for work or fill in hydrologically connected wetlands. Contact the US Army Corps of Engineers, Seattle District Regulatory Branch, PO Box 3755, Seattle WA 98124, (206) 764-3495, for more information.
|
|
|
Title:
|
| | |
F-ESA
|
|
Wording
|
| | |
Because this structure was established prior to the adoption of the UDC it is exempt from review of Environmentally Sensitive Areas under Section 3.6.4(g) of the Jefferson County Unified Development Code.
|
|
|
Title:
|
| | |
F-HISTORY
|
|
Wording
|
| | |
A Substantial Development Permit for a breakwater was issued in 1978. A Substantial Development Permit for a 48 slip marina was approved in 1983. A Substantial Development Permit SDP 95-08 for an additional 62 boat slips was issued May 23, 1997. Condition of Approval Number 1 of SDP 95-08 required the review and approval of a fire suppression system by the Fire Marshall prior to the use of the expanded marina. This proposal is intended to implement this condition of approval.
|
|
|
Title:
|
| | |
F-SHORELINE
|
|
Wording
|
| | |
The portion of the project located waterward of the OHWM is designated Aquatic and the area landward of the OHWM is designated Urban by the Jefferson County Shoreline Management Master Program.
This project is to install a fire suppression system to the existing marina. This would entail the attaching small pipes to the existing piers, ramps, and floats. The installation of the fire suppression system is a condition of approval for a marina expansion approved through SDP 95-08.
This proposal is implementing the conditions of approval from SDP 95-08. This proposal is also considered maintenance activity for Inn at Port Hadlock Marina, and is exempt under Section 3.402(6) County Shoreline Management Master Plan (SMMP), which is normal repair and maintenance. The processing of a shoreline exemption still requires compliance with the SMMP.
|
|
|
Title:
|
| | |
F-SEPA
|
|
Wording
|
| | |
A Determination of Non-Significance (DNS) was issued for SDP 95-08 on February 27, 1996 for the marina expansion proposal, which included this required fire suppression system.
Furthermore, Jefferson County determined that this proposal is categorically exempt from review under the State Environmental Policy Act (SEPA) pursuant to WAC 197-11-800(3)- Normal Repair & Maintenance. Structures covered by water may be repaired and maintained provided that they are not specifically listed as non-exempted activities under WAC 197-11-800(3). The proposal is not considered dredging, a shoreline protection facility, or utility cables, dam, dike, or reservoir facility, which are all specifically not exempt under 197-11-800(3).
|
|
|
Title:
|
| | |
F-Confirmed ESAs
|
|
Wording
|
| | |
The application was reviewed by the Jefferson County Department of Community Development staff on January 6, 2006 for the potential presence of Environmentally Sensitive Areas (ESAs) under the provisions of the Unified Development Code (UDC). After an initial Geographic Information Systems mapping review and an investigative site inspection, the following ESAs were confirmed to be present on the subject property: Issues related to marine shorelines.
|
|
|
Title:
|
| | |
F-Stormwater
|
|
Wording
|
| | |
The applicant is not proposing any additional impervious surface or land disturbing activities. Sections 6.6 and 6.7 of the Jefferson County Unified Development Code requires that your proposal to comply with construction best management practices.
|
|
|
Title:
|
| | |
F-Site Plan Changes
|
|
Wording
|
| | |
The site plan as submitted with the shoreline exemption application on December 2, 2005 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated January 6, 2006 shall be resubmitted for review and approval by Jefferson County Department of Community Development.
|
|
|
Title:
|
| | |
F-Approval for _____ Only
|
|
Wording
|
| | |
This approval is for the installation of a fire suppression system only, which would be fiixed to the existing pier, ramp, and float facility. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits.
|
|