Permit Case Summary

Case Number: Search Help

Case Number:BLD2005-00690 Case Status:Finaled Date Received:11/2/2005
Description:NSFR W/ ATT GARAGE Date Issued:12/8/2005
Applicant: BISHOP LOGGING COMPANY Expiration Date:12/8/2007 12:00:00 AM
Site Address:83 FIR CIR Case Finaled:5/12/2006
Parcel No:932300036 Other Cases Parcel Data Map It More Details Parcels Images

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: File Archived
Date Completed: 11/29/2007
Disposition: DONE
Description: Insp - FINAL FINAL Building
Date Completed: 5/12/2006
Disposition: DONE
Description: Insp - Final Building
Date Completed: 5/12/2006
Disposition: DONE
Description: Insp - Final Building
Date Completed: 5/11/2006
Disposition: FAIL
Description: Insp - Framing
Date Completed: 1/19/2006
Disposition: DONE
Description: Change Status to RENEWED
Date Completed: 1/9/2006
Disposition: DONE
Description: Issue Building Permit (F)
Date Completed: 12/8/2005
Disposition: DONE
Description: Approve Permit-UF
Date Completed: 12/7/2005
Disposition: DONE
Description: Approve Permit-UF
Date Completed: 12/6/2005
Disposition: DONE
Description: Print Dummy UDC Permit-UF
Date Completed: 12/6/2005
Disposition: DONE
Description: Review Complete-U
Date Completed: 12/6/2005
Disposition: DONE
Description: Det. of Completeness-UF
Date Completed: 12/6/2005
Disposition: DONE
Description: Add SF Dwelling Inspection Set
Date Completed:
Disposition:
Description: Insp - Setbacks
Date Completed: 1/6/2006
Disposition: DONE
Description: Insp - Erosion Control
Date Completed: 1/17/2006
Disposition: DONE
Description: Insp - Foundation Footing
Date Completed: 1/6/2006
Disposition: DONE
Description: Insp - Foundation Stem Wall
Date Completed:
Disposition:
Description: Insp - Straps
Date Completed:
Disposition:
Description: Insp - Shear Wall Nailing
Date Completed: 2/9/2006
Disposition: DONE
Description: Insp - Rough-in Plumbing
Date Completed: 3/16/2006
Disposition: DONE
Description: Insp - Underground Plumbing
Date Completed:
Disposition:
Description: Insp - Gas Line: Interior
Date Completed:
Disposition:
Description: Insp - Gas Line: Exterior
Date Completed:
Disposition:
Description: Insp - Propane Tank
Date Completed:
Disposition:
Description: Insp - Heat/Chimney Clearance
Date Completed:
Disposition:
Description: Insp - Framing
Date Completed: 3/16/2006
Disposition: DONE
Description: Insp - Airseal
Date Completed: 3/20/2006
Disposition: DONE
Description: Insp - Insulation: Walls
Date Completed: 3/20/2006
Disposition: DONE
Description: Insp - Insulation: Floors
Date Completed:
Disposition:
Description: Insp - Insulation: Ceiling
Date Completed:
Disposition:
Description: Insp - Int. Shear Wall Nailing
Date Completed: 3/28/2006
Disposition: DONE
Description: Insp - Drywell/Alt Drainage
Date Completed:
Disposition:
Description: Insp - Address Posted
Date Completed:
Disposition:
Description: Insp - Final Building
Date Completed: 5/9/2006
Disposition: FAIL
Description: Septic System Finaled
Date Completed: 5/9/2006
Disposition: DONE
Description: Insp - Blocking
Date Completed:
Disposition:
Description: Insp - Wallboard Nailing
Date Completed:
Disposition:
Description: Building Permit Application(F)
Date Completed: 11/2/2005
Disposition: DONE
Description: App Substantially Complete-U
Date Completed: 12/6/2005
Disposition: DONE
Description: Case Entered
Date Completed: 11/2/2005
Disposition:
Description: Plan Check
Date Completed: 11/17/2005
Disposition: DONE
Description: Septic Review Complete-U
Date Completed: 11/16/2005
Disposition: DONE
Description: Potable Water Approval
Date Completed: 11/9/2005
Disposition: DONE
Description: Contractor License/Bond Info
Date Completed: 11/3/2005
Disposition: DONE
Description: Stormwater Review-U
Date Completed: 12/6/2005
Disposition: DONE
Description: Env. Sensitive Area Review-U
Date Completed: 12/6/2005
Disposition: DONE
Description: Consistency Review-U
Date Completed: 12/6/2005
Disposition: DONE
Description: RAP Review Complete-U
Date Completed: 12/6/2005
Disposition: DONE

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: Bld Security/hooded lights
Wording Lighting fixtures shall be designed and hooded to prevent the light source from being directly visible from outside the boundaries of the property. The intensity or brightness of all lighting, during construction and after project completion shall not adversely affect the use of surrounding properties or adjoining rights-of-way.

Title: Bld Exterior height lights
Wording Exterior lighting for residential uses shall not exceed twenty feet (20') in height from the finished grade, excepting when such lighting is an integral part of a building or structure. Ground level lighting is encouraged.

Title: Bld Setbacks
Wording Setback from Fir Circle right-of-way is no less than 20 ft., side and rear setbacks are no less than 5 ft. If an environmentally sensitive area (ESA) is present, then the more restrictive setback shall apply.

Title: Bld building height
Wording The building height is not to exceed 35 feet.

Title: Bld lot coverage
Wording Pre-existing legal lots of record less than one acre in size in Rural Residential districts are subject to the stormwater requirements in UDC Section 6.7 and must meet the "Area of Impervious Surface Coverage" to the maximum extent practicable as determined by the Administrator." Lot coverage is defined as amount of impervious surface, which includes rooftops, driveways, concrete, etc.

Title: Outdoor Residential Storage
Wording Outdoor residential storage shall be maintained in an orderly manner and shall create no fire, safety, health or sanitary hazard.

Title: Unlicensed/Inoperable Vehicles
Wording Not more than two (2) unlicensed or inoperable vehicles shall be stored on any lot less than one-half acre unless totally screened from view of neighboring dwellings and rights-of-way. Such screening shall meet all applicable performance and development standards specific to the district in which the storage is kept, and shall be in keeping with the character of the area. Screening shall meet the requirements of Unified Development Code (UDC) Section 6. Outdoor storage of thirteen (13) or more unlicensed or inoperable vehicles is prohibited except in those districts where specified as an automobile wrecking yard or junk (or salvage) yard and allowed as a Permitted Use in Table 3-1 of the UDC, and such storage shall meet the requirements of UDC Section 4.10. In no case, shall any such unlicensed or inoperable vehiclesbe stored in an Environmentally Sensitive Area (ESA).

Title: STORMWATER ON SITE
Wording Stormwater shall be retained and infiltrated on site. The owner shall control all sedimentation and erosion on the property.

Title: PARKING
Wording A minimum of two (2) on-site parking spaces is required for the single-family residence.

Title: Aquifer Recharge Conditions (SFR)
Wording Critical Aquifer Recharge Areas may require special protection measures to mitigate water quality degradation. The submitted proposal does not require additional aquifer protection measures. However, during construction the project shall follow the Best Management Practices (BMPs) and facility design standards as identified and defined in the Stormwater Management Manual for the Puget Sound Basin.

Title: BMPs
Wording The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.

Title: Stormwater Plan
Wording A Stormwater Plan has been submitted and approved by the Department of Community Development. Once the subject permit has been issued the applicant shall fully implement the provisions of the submitted plan and contact the Jefferson County Department of Community Development to arrange a schedule to inspect the property for plan compliance. A Certificate of Occupancy will not be issued until the Department verifies plan compliance. No clearing for roadways or utilities shall occur on the project site until clearing necessary for the installation of temporary sedimentation and erosion control measures have been completed.


Case Findings
Below is a list of findings for this permit case. Findings typically record facts that the staff are using as the basis of their permit processing decisions.
Title: F-COMP PLAN
Wording This is a legal nonconforming parcel designated as Rural Residential 1:5 under the Jefferson County Comprehensive Plan Land Use Map effective August 28, 1998.

Title: F-PUBLIC WATER
Wording This parcel is served by a public water system (PUD #1).

Title: F-SEPTIC
Wording A septic permit (SEP94-00467) was approved December 29, 1994 for a capacity of 360 gallons per day. This permit was finalled December 12, 2001.

Title: F-ACCESS
Wording Fir Circle (C642909) is a county local access road. A road approach is existing and an address of 83 Fir Circle has been assigned to the parcel.

Title: F-PARCEL CREATION
Wording This parcel was created through Bishop Acres under AFN 329172, recorded March 19, 1990, Volume 6, pages 126 & 127 with the Jefferson County Auditor's office.

Title: F-Confirmed ESAs
Wording The application was reviewed by the Jefferson County Department of Community Development staff on December 6, 2005 for the potential presence of Environmentally Sensitive Areas (ESAs) under the provisions of the Unified Development Code (UDC). After an initial Geographic Information Systems mapping review, the following ESAs were confirmed to be present on the subject property: Special Aquifer Recharge Protection Area (SARPA).

Title: F-Aquifer Recharge Area
Wording Aquifer Recharge Areas in Jefferson County are characterized by porous geological formations that allow percolation of the surface water into the soils and the underlying zone of saturation. Aquifers are geologic formations that contain sufficient saturated permeable material to yield significant quantities of water to wells and springs. Aquifers serve as the source of drinking water within most of the rural portions of Jefferson County.

Title: F-Critical Aquifer Recharge Area
Wording Critical Aquifer Recharge Areas are defined as Seawater Intrusion Areas, and Special Aquifer Recharge Protection Areas and the following land uses located within Susceptible Aquifer Recharge Areas (1) All Industrial Land Uses (2) All Commercial Uses (3) All Rural Residential Land Uses requiring a Discretionary Use or Conditional Use Permit (4) All Rural Residential Land Uses with nonconforming uses that would otherwise require a Discretionary Use or Conditional Use Permit (5) Unsewered Planned Rural Residential Developments (6) Unsewered residential development with gross densities greater than one unit per acre. All of the above listed uses shall be subject to the applicable requirements and standards of the Jefferson County Unified Development Code.

Title: F-Stormwater
Wording The applicant is proposing to create or add 2,550 square feet of impervious surface and 2,550 square feet of land disturbing activities. Sections 6.6 and 6.7 of the Jefferson County Unified Development Code requires the project applicant submit a stormwater plan meeting Minimum Requirements #1 through #5 of the Department of Ecology Stormwater Management Manual for Western Washington. The stormwater plan shall address measures to control stormwater, erosion and sediment during construction and shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.

Title: F-SEPA Exempt
Wording Jefferson County determined that this proposal is categorically exempt from review under the State Environmental Policy Act (SEPA) pursuant to WAC 197-11-800(1)(b)(i).

Title: F-Site Plan Changes
Wording The site plan as submitted with the building permit application on November 2, 2005 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated December 6, 2006 shall be resubmitted for review and approval by Jefferson County Department of Community Development.

Title: F-APPROVAL FOR NSFR ONLY
Wording This approval is for a single-family residence with attached garage only. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits.