Case Number:BLD2005-00598 Case Status:Finaled Date Received:9/14/2005
Description:LIFE/FIRE SAFETY REVIEW - The proposal is to use one room, Room J, for pre-school with no more than 12 children at the existing Community United Methodist Church facility. This proposal is utilizing the existing structures, septic systems, parking areas, and public water system. Date Issued:10/27/2005
Applicant: COMM METHODIST CHURCH Expiration Date:10/27/2006 12:00:00 AM
Site Address:130 CHURCH LN Case Finaled:9/14/2006
Parcel No:995900001 Other Cases Parcel Data Map It More Details Parcels Images

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: File Archived
Date Completed: 10/6/2006
Disposition: DONE
Description: Insp - FINAL FINAL Building
Date Completed: 9/14/2006
Disposition: DONE
Description: Insp - Miscellaneous
Date Completed: 9/15/2006
Disposition: DONE
Description: Insp - Final Building
Date Completed: 9/13/2006
Disposition: DONE
Description: Issue Building Permit (F)
Date Completed: 10/27/2005
Disposition: DONE
Description: Approve Permit-UF
Date Completed: 10/26/2005
Disposition: DONE
Description: Print Dummy UDC Permit-UF
Date Completed: 10/26/2005
Disposition: DONE
Description: Review Complete-U
Date Completed: 10/26/2005
Disposition: DONE
Description: Insp - Miscellaneous
Date Completed: 9/14/2006
Disposition: DONE
Description: Det. of Completeness-UF
Date Completed: 9/30/2005
Disposition: DONE
Description: Building Permit Application(F)
Date Completed: 9/15/2005
Disposition: DONE
Description: App Substantially Complete-U
Date Completed: 9/30/2005
Disposition: DONE
Description: Case Entered
Date Completed: 9/15/2005
Disposition:
Description: Plan Check
Date Completed: 10/20/2005
Disposition: DONE
Description: Septic Review Complete-U
Date Completed: 10/20/2005
Disposition: DONE
Description: Stormwater Review-U
Date Completed: 9/30/2005
Disposition: DONE
Description: Env. Sensitive Area Review-U
Date Completed: 9/30/2005
Disposition: DONE
Description: Consistency Review-U
Date Completed: 10/26/2005
Disposition: DONE
Description: RAP Review Complete-U
Date Completed: 9/30/2005
Disposition: DONE

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: Bld Setbacks
Wording Minimum setback frm Church Ln right-of-way is 20 ft. Minimum side and rear setbacks are 5 ft.

Title: Bld lot coverage
Wording Maximum lot coverage is not to exceed 25%. Lot coverage is defined as amount of impervious surface which includes roof tops, driveways, concrete, etc.

Title: HEALTH APPROVAL
Wording This Health approval for a temporary use as a preschool is granted based on the letter from the school operators stating use of the facilities for the school for a maximum of 3 yrs for one preschool-kindergarten class of no more than 12 children and 2 teachers.

Title: WATER USE
Wording Water use shall be monitored weekly for the first 2 months and monthly thereafter. Results shall be submitted to the Health Department quarterly.

Title: C-NO CHANGE TO STRUCTURE
Wording This proposal will be utilizing existing structure, parking, lightings, drainage and alike. No alteration or changes to these improvements are proposed.

Title: C-COMPLIANCE WITH STATE LICENSING
Wording Applicants shall demonstrate compliance with state licensing requirements of a Child Day Care Facilities.

Title: Aquifer Recharge Conditions (SFR)
Wording Critical Aquifer Recharge Areas may require special protection measures to mitigate water quality degradation. The submitted proposal does not require additional aquifer protection measures. However, during construction the project shall follow the Best Management Practices (BMPs) and facility design standards as identified and defined in the Stormwater Management Manual for the Puget Sound Basin.

Title: BMPs
Wording The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.


Case Findings
Below is a list of findings for this permit case. Findings typically record facts that the staff are using as the basis of their permit processing decisions.
Title: F-ZON
Wording This parcel has been designated as Rural Residential 1:5 under the Jefferson County Comprehensive Plan Land Use Map effective August 28, 1998.

Title: F-ASSESSORY USE
Wording The Administrator determined this proposal is an accessory use as it is sited on the premises of an existing community services use per UDC 4.18.1.d(1).

Title: F-PARKING
Wording The Administrator has determined the proposal will not create additional need for parking in excess of that currently provided on-site. Generally most church activities occur on the weekend or during the evening hours. The preschool will be in session from 9:30am to 1:30pm on Mondays through Thursdays. Parents will be carpooling and using public transportation. Those using the parking lot will only need to park for a short time as they drop off or pick up children. Teachers will use at most two (2) spaces for the duration of the morning.

Title: F-OFF-STREET DROP OFF
Wording Applicants are proposing to utilize the existing parking lot for vehicles to drop off and pick up children.

Title: F-ACCESS
Wording Church Ln (P608) is a private road. The road approach is existing and address of 130 Church Ln has been assigned to the parcel.

Title: F-CASE HISTORY
Wording 1. Conditional Use Permit (ZON02-00167) was approved October 31, 2003 for construct up to 28 bedrooms of housing for seniors, families, individuals and persons with disabilities. A binding site plan has also been submitted for purposes of subdivisiing off the south 7.5 acres of the parcel that will be utilized for the housing development proposal. 2. A sign permit (ZON00-00028) was finaled November 16, 2000 and the associated building permit (BLD00-00586) was finaled November 8, 2000. 3. A septic permit (SEP85-00166) was finaled April 11, 1986.

Title: F-NO SIGN
Wording No sign was proposed with this application. Any future sign proposal shall require review for consistency with applicable codes and ordinances.

Title: F-ZONING
Wording The applicant is proposing to utilize one room for preschool with maximum 12 children at the existing Community United Methodist Church. The property is also known as Lot 1 of South 7 Village Binding Site Plan, recorded on July 26, 2004 under AFN 487342. The property contains sufficient parkings and existing landscaping.

Title: F-Confirmed ESAs
Wording The application was reviewed by the Jefferson County Department of Community Development staff on September 30, 2005 for the potential presence of Environmentally Sensitive Areas (ESAs) under the provisions of the Unified Development Code (UDC). After an initial Geographic Information Systems mapping review and an investigative site inspection, the following ESAs were confirmed to be present on the subject property: Susceptible Aquifer Recharge Areas and Special Aquifer Recharge Protection Areas.

Title: F-Aquifer Recharge Area
Wording Aquifer Recharge Areas in Jefferson County are characterized by porous geological formations that allow percolation of the surface water into the soils and the underlying zone of saturation. Aquifers are geologic formations that contain sufficient saturated permeable material to yield significant quantities of water to wells and springs. Aquifers serve as the source of drinking water within most of the rural portions of Jefferson County.

Title: F-Susc. Aquifer Recharge Area
Wording Susceptible Aquifer Recharge Areas are those with geologic and hydrologic conditions that promote rapid infiltration of recharge waters to groundwater aquifers.

Title: F-Critical Aquifer Recharge Area
Wording Critical Aquifer Recharge Areas are defined as Seawater Intrusion Areas, and Special Aquifer Recharge Protection Areas and the following land uses located within Susceptible Aquifer Recharge Areas (1) All Industrial Land Uses (2) All Commercial Uses (3) All Rural Residential Land Uses requiring a Discretionary Use or Conditional Use Permit (4) All Rural Residential Land Uses with nonconforming uses that would otherwise require a Discretionary Use or Conditional Use Permit (5) Unsewered Planned Rural Residential Developments (6) Unsewered residential development with gross densities greater than one unit per acre. All of the above listed uses shall be subject to the applicable requirements and standards of the Jefferson County Unified Development Code.

Title: F-Stormwater
Wording All structures and improvements already exist. The applicant is not proposing any additional impervious surface or land disturbing activities. If land disturbing activity is proposed, Sections 6.6 and 6.7 of the Jefferson County Unified Development Code requires that your proposal shall adhere to Best Managment Practices (BMPs).

Title: F-SEPA Exempt
Wording Jefferson County determined that this proposal is categorically exempt from review under the State Environmental Policy Act (SEPA) pursuant to WAC 197-11-800(1)(b)(iii).

Title: F-Site Plan Changes
Wording The revised site plan as submitted on October 20, 2005 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated October 21, 2005 shall be resubmitted for review and approval by Jefferson County Department of Community Development.

Title: F-APPROVAL FOR PRESCHOO ONLY
Wording This approval is for a preschool with maximum 12 children at the existing Community United Methodist Church facility only. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits.