Permit Case Summary

Case Number: Search Help

Case Number:BLD2005-00559 Case Status:Finaled Date Received:8/26/2005
Description:MODIFY EXISTING UNMANNED WIRELESS FACILITY CONSISTING OF REMOVING & REPLACE 6 EXISTING ANTENNAS W/ 6 KATHREIN ANTENNAS & ADD 4 NEKIA CABINETS IN EXISTING LEASE AREA Date Issued:10/3/2005
Applicant: WIRELESS FACILITIES INC Expiration Date:10/3/2006 12:00:00 AM
Site Address:313 ELKHOUND PASS RD Case Finaled:8/17/2006
Parcel No:702132002 Other Cases Parcel Data Map It More Details

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: File Archived
Date Completed: 10/9/2006
Disposition: DONE
Description: Insp - FINAL FINAL Building
Date Completed: 8/17/2006
Disposition: DONE
Description: Issue Building Permit (F)
Date Completed: 10/3/2005
Disposition: DONE
Description: Approve Permit-UF
Date Completed: 9/29/2005
Disposition: DONE
Description: Print Dummy UDC Permit-UF
Date Completed: 9/29/2005
Disposition: DONE
Description: Review Complete-U
Date Completed: 9/29/2005
Disposition: DONE
Description: Consistency Review-U
Date Completed: 9/29/2005
Disposition: DONE
Description: Stormwater Review-U
Date Completed: 9/28/2005
Disposition: DONE
Description: Env. Sensitive Area Review-U
Date Completed: 9/28/2005
Disposition: DONE
Description: Insp - Final Building
Date Completed: 8/16/2006
Disposition: DONE
Description: Insp - Setbacks
Date Completed: 8/16/2006
Disposition: DONE
Description: Insp - Post Holes
Date Completed:
Disposition:
Description: Plan Check
Date Completed: 9/6/2005
Disposition: DONE
Description: Building Permit Application(F)
Date Completed: 8/29/2005
Disposition: DONE
Description: App Substantially Complete-U
Date Completed: 8/29/2005
Disposition: DONE
Description: Case Entered
Date Completed: 8/29/2005
Disposition:
Description: Contractor License/Bond Info
Date Completed: 8/29/2005
Disposition: DONE
Description: RAP Review Complete-U
Date Completed: 8/29/2005
Disposition: DONE

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: C-MIN REQ #2
Wording The project shall comply with Construction Stormwater Pollution Prevention (SWPP) Elements #1 through #12 of the Department of Ecology's Stormwater Management Manual for Western Washington to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.

Title: C-COMPLIANCE
Wording Upon written application, prior to the expiration of the 180-day period, the Administrator shall in writing grant a 180-day extension for reuse of the facility. Additional extensions beyond the first 180 day extension may be granted by the Administrator, subject to any conditions required to bring the project or facility into compliance with current law(s) and make it compatible with surrounding development.

Title: C-KNOX BOX KEY
Wording A knox box key access shall be provided by the applicant.

Title: C-RESCUE TEAM
Wording A high angle rescue team shall be provided by the applicant when work is being conducted on the tower.

Title: C-ROAD ACCESS
Wording Road access shall be accessible for emergency vehicles.

Title: C-SETBACKS
Wording The tower will be sited approximately 917-ft from the northern lot line, 946-ft from the eastern lot line and 1315-ft from the southern lot line and 1714-ft from the western lot line.

Title: C-MEET CODE
Wording Construction of the wireless telecommunication facilities is subject to the requirements of the County Building Code, Chapter 15.05 JCC, and all Building Code (UBC), the Electrical Code (NEC), the requirements of the National Electronics Industries Association/Telecommunications Industries Association (EIA/TIA) 222 Revision F Standard entitled "Structural Standards for Steel Antenna Supporting Structures" and any additional applicable standards published by the Electronics Industries Association, the Uniform Fire Code and the Jefferson County Critical Areas Ordinance.

Title: C-SECURITY LIGHTING
Wording Security lighting for the equipment enclosure shall be minimized. Any newly installed security lighting shall be oriented downward and shielded so that light falls only within the boundaries of the property and shall be triggered only by a motion sensor.

Title: C-CARE OF FACILITY
Wording The applicant shall protect the facility from unauthorized access consistent with the purpose of protecting the public health, safety and welfare. The applicant shall maintain the facility in a good and safe condition and preserve its original appearance and concealment or camouflage elements incorporated into the design at the time of approval. Maintenance shall include, but not be limited to, such items as painting, structural repair, repair of equipment and maintenance of landscaping.

Title: C-SUBLEASING AITHORIZATION
Wording If the applicant transfers, assigns, or subleases a wireless communication facility, a copy of the land use agreement and FCC license shall be submitted in writing to the Director, as well as the name and telephone number of a person responsible for the facility, who is capable of responding immediately.

Title: C-REMOVAL IF ABANDONED
Wording If an abandoned facility is not removed within 180 days or a longer period of time determined in writing by the Director, the County shall have the authority to enter the property and remove the facilities. All reasonable and documented costs of such removal shall be charged to the provider and/or landowner of record.

Title: C-ZONING COMPLIANCE
Wording For all towers and related equipment enclosures located in commercial and residential districts, or a agricultural land, the applicant shall prepare a landscaping plan for review and approval. Landscaping shall be placed outside the security fence and shall consist of fast growing vegetation with a minimum planted height of six feet, placed so as to form a solid hedge within two years of planting. Existing vegetation shall be preserved to ensure that the tower and related equipment are adequately screened and concealed The County may require a supplemental planting plan prior to issuance of a Certificate of Compliance. In lieu of compliance with this requirement, the applicant may apply for a variance pursuant to Section 18.42.120 Variances.

Title: C-TYPE II STREAM
Wording A Type (2) Stream (Fish and Wildlife Habitat Area) has been identified on the subject property. The stream will require a setback of 150-feet. The setback shall be measured horizontally from the Ordinary High Water Mark (OHWM). Fish and Wildlife Habitat Areas shall also have Buffers and Building Setbacks established. The proposed tower is located approximately 1/2 mile from the stream.

Title: C-CUP CONDITIONS
Wording A Type II Conditional Use Permit was issued for the proposed cell tower. The applicant shall adhere to all conditions stipulated through ZON03-00058.

Title: C-PAINT
Wording The structure and associated equipment shall paint the pole and associated equipment in a manner that blends with the natural surroundings.

Title: C-LIGHTING
Wording Lighting shall be in conformance with applicable FAA and FCC policies and approval.

Title: C-EMERGENCY RESPONSE
Wording Prior to the operation of the telecommunication facilities, the applicant shall document that the system has been integrated into the County's Emergency Response System as required by Section 18.42.050.

Title: C-DESIGN STANDARD
Wording Based on Section 18.42.090, Design Review Standard a-3, the applicant shall submit documentation from the FCC or FAA confirming that the tower is not required to be lit. The documentation shall be provided prior to issuance of a Certificate of Occupancy.

Title: C-VEGETATION
Wording Existing plant materials located on and off the lease site shall be preserved to ensure that the tower and related equipment are sufficiently concealed from ground level, adjacent properties and viewscapes. If it is not possible to achieve adequate screening by preserving existing vegetation on the site, the applicant shall lease or secure an easement for additional land to preserve existing significant vegetation or to allow the planting of additional vegetation.

Title: C-FACILITY MAINTENANCE
Wording The applicant shall protect the facility from unauthorized access consistent with the purpose of protecting the public health, safety and welfare. The applicant shall maintain the facility in a good and safe condition and preserve its original appearance and concealment or camouflage elements incorporated into the design at the time of approval. Maintenance shall include, but not be limited to, such items as painting, structural repair, repair of equipment and maintenance of landscaping.

Title: C-SUBLEASING
Wording If the applicant transfers, assigns, or subleases a wireless communication facility, a copy of the land use agreement and FCC license shall be submitted in writing to the Administrator, as well as the name and telephone number of a person responsible for the facility, who is capable of responding immediately.

Title: C-DEBT FEES
Wording The applicant shall be responsible for all direct and indirect expenses incurred related to review and compliance with the conditions of approval. All fees shall be as authorized by County Ordinance. In accordance with the Jefferson County Department of Public Works Fee Schedule, the applicant shall pay all costs of work incidental to review the before final approval is granted. The Department's review fee is currently $56.00 per hour.

Title: C-ABANDONED IF UNUSED
Wording In the event the wireless telecommunication facility is unused for a period of 180 consecutive days will be declared abandoned by the County. The property owner shall remove abandoned facilities within 180 days from the date of abandonment. Failure to remove an abandoned facility shall be considered a public nuisance subject to penalties.

Title: C-ABANDONED
Wording If an abandoned facility is not removed within 180 days or a longer period of time determined in writing by the Administrator, the County shall have the authority to enter the property and remove the facilities. All reasonable and documented costs of such removal shall be charged to the provider and/or landowner of record.

Title: C-BUFFER
Wording Buffers are areas that shall be maintained in their natural condition, however, minor pruning or alteration of vegetation may be permitted as long as the function and character of the buffer are not diminished.


Case Findings
Below is a list of findings for this permit case. Findings typically record facts that the staff are using as the basis of their permit processing decisions.
Title: F-STREAM DISTANCE
Wording The proposal is located outside of the streamside buffer area. The Type 2 Stream is approximately 1/2 mile away from the proposed development.

Title: F-GEOHAZARD AREAS
Wording The proposed location of the tower is not on an identified steep slope or landslide hazard area. Therefore, additional conditions and setback do not apply.

Title: F-DNS ISSUED
Wording This proposal was reviewed under the State Environmental Policy Act (SEPA) by Jefferson County acting as lead agency in conjunction of ZON03-00058 and BLD03-00545. Determination of Non-Significance (DNS) issued on October 9, 2003.

Title: F-MORATORIUM
Wording A portion of the proposal was logged and a six (6) year moratorium was placed on the property. The portion of the property is outside of the location of the moratorium.

Title: F-CASE HISTORY
Wording A building permit (BLD03-00545) was finaled on January 20, 2004 for a 150-ft monopole and associated ground equipment, an associated zoning review (ZON03-00058) was completed November 20, 2003.

Title: F-Confirmed ESAs
Wording The application was reviewed by the Jefferson County Department of Community Development staff on September 28, 2005 for the potential presence of Environmentally Sensitive Areas (ESAs) under the provisions of the Unified Development Code (UDC). After an initial Geographic Information Systems mapping review and an investigative site inspection, the following ESAs were confirmed to be present on the subject property: Type 2 and Type 5 Steams, Wetlands, Seismic Hazard Areas, Level I Landslide Hazard Areas, Erosion Hazard Areas and Susceptibe Aquifer Recharge Areas.

Title: F-Aquifer Recharge Area
Wording Aquifer Recharge Areas in Jefferson County are characterized by porous geological formations that allow percolation of the surface water into the soils and the underlying zone of saturation. Aquifers are geologic formations that contain sufficient saturated permeable material to yield significant quantities of water to wells and springs. Aquifers serve as the source of drinking water within most of the rural portions of Jefferson County.

Title: F-Susc. Aquifer Recharge Area
Wording Susceptible Aquifer Recharge Areas are those with geologic and hydrologic conditions that promote rapid infiltration of recharge waters to groundwater aquifers.

Title: F-Geohazard Area
Wording Geologically Hazardous Areas in Jefferson County are characterized by slope, soil type, geologic material, and groundwater that may combine to create problems with slope stability, erosion, and water quality during and after construction or during natural events such as earthquakes or severe rainstorms.

Title: F-Adjacent Forest Land Disclosure
Wording Jefferson County has determined that the use of real property for agriculture and forestry operations is a high priority and favored use in the county. The county will not consider to be a nuisance those inconveniences or discomforts arising from such operations, if such operations are consistent with commonly accepted best management practices in compliance with local, state, and federal laws. If your real property includes or is within five hundred (500) feet of real property designated as Rural Residential 1:10 or 1:20, Rural Industrial, Rural Commercial, Agriculture, or Forestry, you may be subject to inconveniences or discomforts arising from such farming and forestry operations, including but not limited to noise, tree removal, odors, flies, fumes, dust, smoke, the operation of farm and forestry machinery during any 24-hour period, the storage and disposal or manure, and the application of permitted fertilizers and permitted pesticides. One or more of these inconveniences may occur as a result of agricultural and forestry operations which are in conformance with existing laws and regulations.

Title: F-Site Plan Changes
Wording The site plan as submitted with the building permit application on September 1, 2005 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated September 28, 2005 shall be resubmitted for review and approval by Jefferson County Department of Community Development.

Title: F-Approval for _____ Only
Wording This approval is for modifying existing unmanned wireless facility consisting of removing and replacing six existing antennas with six kathrein antennas and add four nekia cabinets in existing lease area only. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits.