Description:
|
| | |
Miscellaneous Action
|
|
Date Completed:
|
| | |
7/21/2011
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
File Archived
|
|
Date Completed:
|
| | |
7/17/2007
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Certificate of Occupancy-F
|
|
Date Completed:
|
| | |
8/1/2006
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - FINAL FINAL Building
|
|
Date Completed:
|
| | |
7/18/2006
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Final Building
|
|
Date Completed:
|
| | |
7/18/2006
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Temporary Cert of Occupancy(F)
|
|
Date Completed:
|
| | |
4/18/2006
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Footing
|
|
Date Completed:
|
| | |
9/27/2005
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Footing
|
|
Date Completed:
|
| | |
9/15/2005
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Change Status to RENEWED
|
|
Date Completed:
|
| | |
8/30/2005
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Shear Wall Nailing
|
|
Date Completed:
|
| | |
8/25/2005
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Straps
|
|
Date Completed:
|
| | |
9/21/2005
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Framing
|
|
Date Completed:
|
| | |
10/26/2005
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Address Posted
|
|
Date Completed:
|
| | |
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Insp - Final Building
|
|
Date Completed:
|
| | |
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Septic System Finaled
|
|
Date Completed:
|
| | |
7/17/2006
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Wallboard Nailing
|
|
Date Completed:
|
| | |
8/30/2005
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Foundation Stem Wall
|
|
Date Completed:
|
| | |
8/9/2005
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Foundation Footing
|
|
Date Completed:
|
| | |
8/2/2005
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Insp - Setbacks
|
|
Date Completed:
|
| | |
8/2/2005
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Issue Building Permit (F)
|
|
Date Completed:
|
| | |
6/15/2005
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Approve Permit-UF
|
|
Date Completed:
|
| | |
6/15/2005
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Final Public Works Approval
|
|
Date Completed:
|
| | |
7/12/2006
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Final Planning Approval
|
|
Date Completed:
|
| | |
7/12/2006
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Additional Info Request-U
|
|
Date Completed:
|
| | |
6/15/2005
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Building Permit Application(F)
|
|
Date Completed:
|
| | |
12/8/2004
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Case Entered
|
|
Date Completed:
|
| | |
12/8/2004
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Plan Check
|
|
Date Completed:
|
| | |
2/15/2005
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Septic Review Complete-U
|
|
Date Completed:
|
| | |
6/13/2005
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Potable Water Approval
|
|
Date Completed:
|
| | |
12/16/2004
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Contractor License/Bond Info
|
|
Date Completed:
|
| | |
12/9/2004
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Stormwater Review-U
|
|
Date Completed:
|
| | |
6/15/2005
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Env. Sensitive Area Review-U
|
|
Date Completed:
|
| | |
1/4/2005
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Consistency Review-U
|
|
Date Completed:
|
| | |
6/15/2005
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
RAP Review Complete-U
|
|
Date Completed:
|
| | |
6/14/2005
|
|
Disposition:
|
| | |
DONE
|
|
|
Title:
|
| | |
Bld Final Zoning Approval
|
|
Wording
|
| | |
The applicant and/or representative shall contact the Development Review Division of the Permit Center (360-379-4450) regarding a final inspection for compliance of zoning permit conditions prior to scheduling a final building inspection.
|
|
|
Title:
|
| | |
C-PWD, CHURCH LANE
|
|
Wording
|
| | |
Church Lane has a total roadway width of 24 feet ( an 18 foot wide traveled way with 3 foot shoulders) and would be adequate to serve the proposal. Depending on future development, Church Lane may require improvements.
|
|
|
Title:
|
| | |
C-PWD, EMERGENCY ACCESS
|
|
Wording
|
| | |
The Department recommends that the applicant investigate the opportunities for an additional emergency-only access from Elkins Road. This could possibly be combined with a pedestrian and bicycle trail.
|
|
|
Title:
|
| | |
C-PWD, ROAD DESIGN
|
|
Wording
|
| | |
Based on AASHTO guidelines, the design standard for roadway with less than 40 ADT is 22-feet (an 18-foot wide traveled way with 2-foot wide shoulders). The design standard for a roadway with 400-1,500 ADT is 30-feet (a 20-foot wide traveled way with 5-foot wide shoulders). A 22-foot wide roadway is adequate to serve the first phase of the development. Depending on the type of development and traffic generation, subsequent development phases may require a 30-foot wide road.
|
|
|
Title:
|
| | |
C-PWD, SIDEWALK
|
|
Wording
|
| | |
Construction of the access road also requires construction of a 5-foot wide sidwalk to be linked to the sidewalks on Chimacum Road.
|
|
|
Title:
|
| | |
C-PWD, PARKING LOT
|
|
Wording
|
| | |
Parking lot entrances shall intersect the access road at as close a 90 degree angle as feasible.
|
|
|
Title:
|
| | |
C-PWD, EMERGENCY VEHICLE
|
|
Wording
|
| | |
In order to provide adequate emergency vehicle access, hammerhead turnarounds shall be constructed to AASHTO standards.
|
|
|
Title:
|
| | |
C-PWD, ADDRESSES
|
|
Wording
|
| | |
Addresses shall be assigned to all residential units. Addresses may be applied for at the time of building permit application.
|
|
|
Title:
|
| | |
C-PWD, ADDRESS PLATES
|
|
Wording
|
| | |
Address plates shall be located in accordance with the provisions of the Jefferson County 911 Emergency Locator System Ordinance.
|
|
|
Title:
|
| | |
C-STORMWATER
|
|
Wording
|
| | |
The proposal includes the construction of more than 5,000 square feet of impervious surface and more than one acre of land disturbing activity. The Unified Development Code requires proponents of developments that meet these criteria to implement a Stormwater Site Plan that includes a Large Parcel Erosion Control Plan and a Permanent Stormwater Quality Control Plan. The Stormwater Site Plan shall comply with Minimum Requirements #1-10 from the Washington Department of Ecology Stormwater Management Manual for the Puget Sound Basin. A Stormwater Site Plan that meets these requirements shall be submitted to the Jefferson County Department of Public Works for review and approval prior to commencing land disturbing activity.
|
|
|
Title:
|
| | |
C-DPW, STORMWATER MGMT
|
|
Wording
|
| | |
In order to meet the requirements of the Washington Department of Ecology Stormwater Management Manual for the Puget Sound Basin and to ensure that the appoved stormwater management facilities are appropriately maintained for the life of the project, Jefferson County requires the proponent to enter into a Stormwater Management Facility Maintenance Agreement with the county. After construction has been completed, the Department will send the proponent a copy of the Agreement that has been signed by the Public Works Director. The Department cannot give final approval for the project until the Agreement has been signed and filed with the Jefferson County Auditor.
|
|
|
Title:
|
| | |
C-DPW, STORMWATER
|
|
Wording
|
| | |
After construction is complete, the proponent shall submit a letter from the project engineer certifying that the stormwater management facilities have been constructed as per the approved plans. The Department cannot give final approval for the project until this certification has been received.
|
|
|
Title:
|
| | |
C-DPW, CONSTRUCTION PLAN
|
|
Wording
|
| | |
Construction of roads, stormwater facilities, and/or land disturbing activities requires that the applicant submit plans for review by the Deparmtent of Public Works.
The applicant shall request inspections by the Department of Public Works during various phases of construction. Typically the following inspections are required:
a. Installation of temporary erosion and sediment control measures;
b. Clearing and road subgrade preparation;
c. Application of gravel base;
d. Application of crushed surfacing top course;
e. Construction of stormwater management facilities;
f. Final Binding Site Plan review.
Additonal inspections may be necessary based on site-specific conditions or the nature of the project.
|
|
|
Title:
|
| | |
C-PWD, FEES
|
|
Wording
|
| | |
In accordance with the Jefferson County Fee Schedule Ordinance, the Public Works Department charges an hourly fee for application and plan review, project inspections, meetings, hearings, and final review. The applicant shall pay all fees incidental to this proposal prior to scheduling final building inspection. In the event that approval for the proposal is denied by Jefferson County or the applicant does not complete the proposal, the applicant shall still be responsible for paying the Department's fees. The Department's fee is currently $50 per hour.
|
|
|
Title:
|
| | |
C-JEFFERSON TRANSIT
|
|
Wording
|
| | |
Jefferson Transit service provides the Tri-Area Loop bus traveling south on Chimacum Road. Jefferson Transit anticipates a route change in the future that will have bus service along both sides of Chimacum Road. A bus pullout and shelter is required to be located in the right-of-way on the west side of Chimacum Road, near Church Lane. A reserved area adequate in size for a bus pullout needs to be located on the east side of Chimacum Road for future use. Siting for a bus pullout must comply with ADA requirements, with particular consideration for operation of wheelchair lifts.
|
|
|
Title:
|
| | |
C-JEFFERSON TRANSIT
|
|
Wording
|
| | |
Adequate access within the site is required to safely load and unload Dial-A-Ride passengers. The vehicles used to transport Dial-A-Ride passengers are up to 25 feet in length. The Dial-A-Ride vehicle needs at least a 25-foot long space, preferably designed for pull-through ingress and egress. (If backing is required, there needs to be a 35-foot straight-back zone, free of obstructions).
|
|
|
Title:
|
| | |
C-FIRE DISTRICT 1
|
|
Wording
|
| | |
Fire apparatus access to the far ends of the complexes needs to be provided as well as a collapse zone around the structures.
|
|
|
Title:
|
| | |
C-FIRE DISTRICT 1
|
|
Wording
|
| | |
The proposed pedestrian paths need to be upgraded to fire lanes, providing emergency access to all sides and exposures of all buildings. The fire lanes need to be outside the above-mentioned collapse zone.
|
|
|
Title:
|
| | |
C-DOE
|
|
Wording
|
| | |
All storm drains within the development should be stenciled "Dump No Waste, Drains to Groundwater".
|
|
|
Title:
|
| | |
C-DOT
|
|
Wording
|
| | |
The Washington State Department of Transportation will not be responsible for noise attenuation. The proponent bears responsibility of noise and land use compatibility. The development should be planned, designed and constructed in such a way that noise impacts are minimized.
|
|
|
Title:
|
| | |
C-DOT
|
|
Wording
|
| | |
Advertising signs visible from an adjacent State Highway must comply with the State Scenic Vistas Act of 1971, which is administered by the Department. For information regarding the signing regulations, contact the Olympic Region Traffic Operations Office at (360) 357-2671.
|
|
|
Title:
|
| | |
C-NPP
|
|
Wording
|
| | |
If municipal sewer becomes available at the site, then existing on-site septic systems must be properly abandoned and connection to sewer will be required.
|
|
|
Title:
|
| | |
C-LIGHTING
|
|
Wording
|
| | |
Exterior lighting shall not exceed thirty (30) feet in height from the finished grade for commercial uses and twenty (20) feet for residential uses (except when such lighting is an integral part of the building).
|
|
|
Title:
|
| | |
C-LIGHTING
|
|
Wording
|
| | |
Exterior lighting shall be energy-efficient and shielded or recessed so that direct glare and reflections are contained within the boundaries of the parcel.
|
|
|
Title:
|
| | |
C-LIGHTING
|
|
Wording
|
| | |
Exterior lighting shall be directed downward and away from adjoining properties and public rights-of-way. No lighting shall blink, flash, or be of unusually high intensity or brightness.
|
|
|
Title:
|
| | |
C-LIGHTING
|
|
Wording
|
| | |
All lighting fixtures shall be appropriate in scale, intensity, and height to the use they are serving.
|
|
|
Title:
|
| | |
C-LIGHTING
|
|
Wording
|
| | |
Any lighting installed in parking areas shall be of direct cutoff design so that the source is not visible from adjacent properties.
|
|
|
Title:
|
| | |
C-SCREEN C LANDSCAPING
|
|
Wording
|
| | |
A 10-foot wide Screen-C landscaping shall be provided along all road frontages.
|
|
|
Title:
|
| | |
C-VEGETATION
|
|
Wording
|
| | |
Existing trees, vegetative plantings, undisturbed open space, and/or topographic or natural features which meet or exceed the landscape standards shall be considered to fulfill the landscaping or screening requirements of UDC Section 6.13. A landscaping plan submitted in conjunction with this proposal shall be implemented.
|
|
|
Title:
|
| | |
C-VEGETATION
|
|
Wording
|
| | |
The existing natural vegetation along the property perimeter shall be retained in its current natural conditions.
|
|
|
Title:
|
| | |
C-LANDSCAPING
|
|
Wording
|
| | |
All landscaping and necessary support systems shall be maintained for the life of the project.
|
|
|
Title:
|
| | |
C-LANDSCAPING
|
|
Wording
|
| | |
All landscape materials shall be pruned and trimmed as necessary to maintain a healthy growing condition.
|
|
|
Title:
|
| | |
C-LANDSCAPING, FREE OF TRASH
|
|
Wording
|
| | |
All landscaped areas shall be kept free of trash.
|
|
|
Title:
|
| | |
C-TRASH REMOVAL
|
|
Wording
|
| | |
The proponent shall make arrangements for trash and rubbish removal. Trash receptacles stored outside shall be screened from public view and installed in such a way that prohibits wildlife access to them.
|
|
|
Title:
|
| | |
C-NOISE
|
|
Wording
|
| | |
Noise levels shall not exceed those levels established by the Washington State Department of Ecology under WAC 173-60, and by Jefferson County under Resolution No. 67-85, "Establishment of Environmental Designations for Noise Abatement Areas of Jefferson County".
|
|
|
Title:
|
| | |
C-BULK & DIMENSIONAL
|
|
Wording
|
| | |
The following bulk and dimensional setbacks are required:
* Minimum setback from Church Lane and any other ingress/egress easements that may exist shall be 20 feet from edge of right-of-way.
* Minimum west, south, and east property line setbacks shall be 35 feet.
* Maximum building height shall not exceed 35 feet.
* Maximum impervious surface coverage shall not exceed 60 percent.
|
|
|
Title:
|
| | |
C-PARKING
|
|
Wording
|
| | |
A minimum of 30 parking spaces is required. (With maximum number of units of 28, parking is calculated at 1.5 spaces totaling 42 parking spaces).
|
|
|
Title:
|
| | |
C-PARKING
|
|
Wording
|
| | |
A minimum of one (1) handicap parking space for each building is required and shall be not less than 13 feet 0 inches wide.
|
|
|
Title:
|
| | |
C-PARKING
|
|
Wording
|
| | |
The handicap parking spaces shall be designated with appropriate signage consistent with state requirements.
|
|
|
Title:
|
| | |
C-PARKING
|
|
Wording
|
| | |
Parking spaces shall be developed so vehicles entering and leaving the parking lot are headed in a forward motion.
|
|
|
Title:
|
| | |
C-PARKING
|
|
Wording
|
| | |
Parking lots and accesses shall be provided with an all-weather surface.
|
|
|
Title:
|
| | |
C-PARKING
|
|
Wording
|
| | |
Parking spaces shall be designated by wheel stops, striping or similar measures.
|
|
|
Title:
|
| | |
C-LOADING
|
|
Wording
|
| | |
No loading and off-loading shall occur on the road rights-of-way.
|
|
|
Title:
|
| | |
C-STREET SIGNS
|
|
Wording
|
| | |
All street signs, traffic signs, and traffic striping shall be installed prior to final approval.
|
|
|
Title:
|
| | |
C-DCD SIGNS
|
|
Wording
|
| | |
Proposed signs are subject to separate application and review. Proposed signs may require a building permit.
|
|
|
Title:
|
| | |
C-FIRE HYDRANTS
|
|
Wording
|
| | |
The Uniform Fire Code requires that fire hydrant(s) be located no farther than 150 feet from the structure(s). The applicant shall contact the Jefferson County Fire Marshall regarding alternate requirements or placement of hydrants prior to issuance of a building permit. All fire hydrant locations shall be depicted on the Final Binding Site Plan.
|
|
|
Title:
|
| | |
F-ZONING REVIEW
|
|
Wording
|
| | |
A conditional Use Permit was approved October 31, 2003 for construction of up to 28 bedrooms of housing for seniors, families, individuals and persons with disabilities. 1-4 bedroom units in concept, will house permanent and transitional very low to moderate income folks. 28 bedrooms is entire project until such time that infrastructure/sewer becomes available to the property. A binding site plan was recorded July 26, 2004 under AFN 487342 for this development that subdivided the original parcel into two parcels. The south 7.5 acres parcel was intended for this housing development proposal.
|
|
|
Title:
|
| | |
F-SEPA
|
|
Wording
|
| | |
SEPA review was conducted under MLA02-00167 for this development. A Mitigated Determination of Non-Significance was issued July 30, 2003. The appeal period ended August 13, 2003, and no appeal was received.
The CUP file (ZON02-0032) contains a staff report depicting a detailed analysis of the project including SEPA. Refer to Log Item 94 of said file.
|
|
|
Title:
|
| | |
F-PUBLIC HEARING
|
|
Wording
|
| | |
An Open Record Public Hearing was conducted on September 23, 2003 by the Jefferson County Hearings Examiner. The Examiner made written Findings, Conclusions and Decision dated October 14, 2003. The Decision of Approval, subject to conditions, dated October 14, 2003 was mailed to all parties of record. The Decision of Approval was subject to a 14 day appeal period that ended on October 28, 2003. No appeal was received on this decision.
|
|
|
Title:
|
| | |
F-WATER
|
|
Wording
|
| | |
Jefferson County PUD #1 provides potable water to the development.
|
|
|
Title:
|
| | |
F-Site Plan Changes
|
|
Wording
|
| | |
The site plan as submitted with the building application on December 9, 2004 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated June 14, 2005 shall be resubmitted for review and approval by Jefferson County Department of Community Development.
|
|
|
Title:
|
| | |
F-APPROVAL FOR MULTI-FAMILY ONLY
|
|
Wording
|
| | |
This approval is for four new modular homes for multi-family housing and on-site improvements only. The Church Lane and Chimacum Road improvements shall be reviewed under a separate permit. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits.
|
|