Permit Case Summary

Case Number: Search Help

Case Number:BLD2004-00278 Case Status:Finaled Date Received:4/29/2004
Description:NEW SFR W/ATTACHED GARAGE Date Issued:5/18/2004
Applicant:DAVID TREAT Expiration Date:5/18/2006 12:00:00 AM
Site Address:102 MONTGOMERY ST Case Finaled:12/22/2004
Parcel No:956701102 Other Cases Parcel Data Map It More Details Parcels Images

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: File Archived
Date Completed: 1/25/2006
Disposition: DONE
Description: Final Building Inspection
Date Completed: 12/22/2004
Disposition: DONE
Description: Miscellaneous inspection
Date Completed:
Disposition:
Description: Wallboard Inspection
Date Completed: 9/1/2004
Disposition: DONE
Description: Insulation Inspection
Date Completed: 8/20/2004
Disposition: DONE
Description: Framing Inspection
Date Completed: 8/18/2004
Disposition: DONE
Description: Foundation Inspection
Date Completed: 6/2/2004
Disposition: DONE
Description: Change Status to RENEWED
Date Completed: 5/27/2004
Disposition: DONE
Description: Footing & Setback Inspection
Date Completed: 5/26/2004
Disposition: DONE
Description: Issue Building Permit (F)
Date Completed: 5/18/2004
Disposition: DONE
Description: Approve Permit-UF
Date Completed: 5/17/2004
Disposition: DONE
Description: Review Complete-U
Date Completed: 5/17/2004
Disposition: DONE
Description: Det. of Completeness-UF
Date Completed: 5/13/2004
Disposition: DONE
Description: PLAN CHK - Addt'l Info Request
Date Completed: 5/13/2004
Disposition: DONE
Description: Application Received-UF
Date Completed: 5/3/2004
Disposition: DONE
Description: Application Received-UF
Date Completed: 5/3/2004
Disposition: DONE
Description: Building Permit Application(F)
Date Completed: 4/29/2004
Disposition: DONE
Description: App Substantially Complete-U
Date Completed: 5/13/2004
Disposition: DONE
Description: Case Entered
Date Completed: 4/29/2004
Disposition:
Description: Plan Check
Date Completed: 5/13/2004
Disposition: DONE
Description: Septic Review Complete-U
Date Completed: 5/17/2004
Disposition: DONE
Description: Potable Water Approval
Date Completed: 5/3/2004
Disposition: DONE
Description: Contractor License/Bond Info
Date Completed: 4/30/2004
Disposition: DONE
Description: Stormwater Review-U
Date Completed: 5/14/2004
Disposition: DONE
Description: Env. Sensitive Area Review-U
Date Completed: 5/14/2004
Disposition: DONE
Description: Consistency Review-U
Date Completed: 5/17/2004
Disposition: DONE
Description: RAP Review Complete-U
Date Completed: 5/17/2004
Disposition: DONE

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: Bld Setbacks
Wording The property is located adjacent to two (2) local access roads (Spruce Street and E. Montgomery). Setbacks from the roads shall be 20-feet. The setbacks shall be measured from the edge of the right-of-way to the proposed development. The remaining side and rear setback shall be 5-feet. Setbacks shall be measured perpendicularly from the lot line to the proposed development.

Title: Bld building height
Wording The building height is not to exceed 35 feet.

Title: Bld lot coverage
Wording Maximum lot coverage is not to exceed 25%. Lot coverage is defined as amount of impervious surface which includes roof tops, driveways, concrete, etc.

Title: Aquifer Recharge Conditions (SFR)
Wording Critical Aquifer Recharge Areas may require special protection measures to mitigate water quality degradation. The submitted proposal does not require additional aquifer protection measures. However, during construction the project shall follow the Best Management Practices (BMPs) and facility design standards as identified and defined in the Stormwater Management Manual for the Puget Sound Basin.

Title: Coastal & At Risk SIPZ-Water Con
Wording VOLUNTARY MEASURES OF COASTAL & AT RISK SIPZ: Water conservation measures: 1. Roof and other intercepted precipitation shall be routed to on-site detention ponds and/or other approved means and allowed to be released to the soil slowly. 2. Water collected from Storm water and roof catchments may be used for watering lawns and gardens. Unless catchment water has been treated to meet drinking water standards, there shall be no cross connections allowed between the potable supply and impounded water. 3. Water withdrawn from wells on each property shall not be used for watering of lawns and/or gardens. 4. Ground water withdrawn from each property shall be restricted to a rate of three (3) gallons per minute. 5. Installation of water conserving fixtures such as low flow toilets, faucets and shower restrictors and other water saving plumbing fixtures. 6. Landscaping plan (xeriscaping, native vegetation with minimal amounts of irrigation). Please NOTE that the above listed measures are not intended to be exhaustive, but rather is intended to be illustrative of the types of water conservation measures.

Title: Coastal & At Risk SIPZ-Measures
Wording VOLUNTARY MEASURES OF COASTAL & AT RISK SIPZ: 1. Installation of a flow meter. 2. On-going well monitoring for chloride concentration. 3. Submittal of monitoring data to County.

Title: Coastal SIPZ-Mand Potable Water
Wording MANDATORY MEASURES FOR COASTAL SIPZ: 1. For proof of potable water on a building permit application, applicant must utilize DOH-approved public water system if available. 2. If public water is unavailable, a qualifying alternative system may be used as proof of potable water or an individual well may be used as proof of potable water subject to the following requirement: a. Chloride concentration of a laboratory-certified well water sample submitted with building permit application. 3. If public water is unavailable, a qualifying alternative system may be used as proof of potable water.

Title: BMPs
Wording The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.

Title: Stormwater Plan
Wording A Stormwater Plan has been submitted and approved by the Department of Community Development. Once the subject permit has been issued the applicant shall fully implement the provisions of the submitted plan and contact the Jefferson County Department of Community Development to arrange a schedule to inspect the property for plan compliance. A Certificate of Occupancy will not be issued until the Department verifies plan compliance. No clearing for roadways or utilities shall occur on the project site until clearing necessary for the installation of temporary sedimentation and erosion control measures have been completed.


Case Findings
Below is a list of findings for this permit case. Findings typically record facts that the staff are using as the basis of their permit processing decisions.
Title: F-COVENANT
Wording The applicant is developing across two seperate tax parcels. A declaration of restrictive covenant was recorded with the Jefferson County Auditor's office on 4/5/04 under AFN482923.

Title: F-Confirmed ESAs
Wording The application was reviewed by the Jefferson County Department of Community Development staff on 4/22/04 for the potential presence of Environmentally Sensitive Areas (ESAs) under the provisions of the Unified Development Code (UDC). After an initial Geographic Information Systems mapping review and an investigative site inspection, the following ESAs were confirmed to be present on the subject property: Susceptible Aquifer Recharge Area, Seawater Intrusion Protection Zone (SIPZ) and Stormwater.

Title: F-Aquifer Recharge Area
Wording Aquifer Recharge Areas in Jefferson County are characterized by porous geological formations that allow percolation of the surface water into the soils and the underlying zone of saturation. Aquifers are geologic formations that contain sufficient saturated permeable material to yield significant quantities of water to wells and springs. Aquifers serve as the source of drinking water within most of the rural portions of Jefferson County.

Title: F-Susc. Aquifer Recharge Area
Wording Susceptible Aquifer Recharge Areas are those with geologic and hydrologic conditions that promote rapid infiltration of recharge waters to groundwater aquifers.

Title: F-SIPZ
Wording Marine shorelines and islands are susceptible to a condition that is known as seawater intrusion. Seawater intrusion is a condition in which the saltwater/freshwater interface in an aquifer moves inland so that wells drilled on upland areas cannot obtain freshwater suitable for public consumption without significant additional treatment and cost. Maintaining a stable balance in the saltwater/freshwater interface is primarily a function of the rate of aquifer recharge (primarily through rainfall) and the rate of groundwater withdrawals (primarily through wells). The Washington Department of Ecology is the agency with statutory authority to regulate groundwater withdrawal for individual wells in Jefferson County. New development, redevelopment, and land use activities on islands and in close proximity to marine shorelines in particular should be developed in such a manner to maximize aquifer recharge and maintain the saltwater/freshwater balance to the maximum extent possible by infiltrating stormwater runoff so that it recharges the aquifer.

Title: F-Coastal SIPZ
Wording The parcel is located within a coastal SIPZ (seawater intrusion protection zone) according to the County GIS map. There are voluntary and mandatory measures identified in the Jefferson County Seawater Intrusion Policy (Resolution 44-22, effective September 23, 2002) that apply to well drilling proposals and building permit applications on existing lots of record. A Coastal SIPZ is defined as: all islands and area within one-quarter mile of marine shoreline, but no history of chloride concentration above 100 mg/L in groundwater sources within 1000 feet.

Title: F-Stormwater
Wording The applicant is proposing to create or add 2,469-square feet of impervious surface. Sections 6.6 and 6.7 of the Jefferson County Unified Development Code requires that your proposal submit a Stormwater Site Plan.

Title: F-SEPA Exempt
Wording Jefferson County determined that this proposal is categorically exempt from review under the State Environmental Policy Act (SEPA) pursuant to WAC 197-11-800(1)(b)(i).

Title: F-Site Plan Changes
Wording The site plan as submitted with the building application on 4/22/04 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated 5/14/04 shall be resubmitted for review and approval by Jefferson County Department of Community Development.

Title: F-Approval for _____ Only
Wording This approval is for a single family dwelling with attached garage only. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits.