Description:
|
| | |
Miscellaneous Action
|
|
Date Completed:
|
| | |
1/12/2006
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Final Building Inspection
|
|
Date Completed:
|
| | |
5/7/2003
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
SEPTIC system FINALED
|
|
Date Completed:
|
| | |
5/8/2003
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Final Planning Appr
|
|
Date Completed:
|
| | |
5/9/2003
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
SEPTIC system FINALED
|
|
Date Completed:
|
| | |
5/7/2003
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Issue Building Permit (F)
|
|
Date Completed:
|
| | |
3/18/2003
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Approve Permit-UF
|
|
Date Completed:
|
| | |
3/13/2003
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Review Complete-U
|
|
Date Completed:
|
| | |
3/12/2003
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Det. of Completeness-UF
|
|
Date Completed:
|
| | |
3/4/2003
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Additional Info Request-U
|
|
Date Completed:
|
| | |
3/12/2003
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Application Received-UF
|
|
Date Completed:
|
| | |
3/3/2003
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
App Substantially Complete-U
|
|
Date Completed:
|
| | |
3/4/2003
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Case Entered
|
|
Date Completed:
|
| | |
2/28/2003
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Plan Check
|
|
Date Completed:
|
| | |
3/6/2003
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Septic Review Complete-U
|
|
Date Completed:
|
| | |
3/5/2003
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Stormwater Review-U
|
|
Date Completed:
|
| | |
3/12/2003
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Env. Sensitive Area Review-U
|
|
Date Completed:
|
| | |
3/12/2003
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Consistency Review-U
|
|
Date Completed:
|
| | |
3/12/2003
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
RAP Review Complete-U
|
|
Date Completed:
|
| | |
2/28/2003
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
DRD Approval (Zoning)
|
|
Date Completed:
|
| | |
3/12/2003
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Building Permit Application(F)
|
|
Date Completed:
|
| | |
2/28/2003
|
|
Disposition:
|
| | |
DONE
|
|
|
Title:
|
| | |
FOOD SERVICE CONDITION
|
|
Wording
|
| | |
The applicant shall comply with the conditions of the March 6, 2003 approved Food Service Establishment Permit issued by the Jefferson County Environmental Health Department.
|
|
|
Title:
|
| | |
PARKING
|
|
Wording
|
| | |
Off-street parking shall be provided for the internet/deli business. A total of at least 10 parking spaces shall be provided for customers and employees. Wheel stops,striping, or similar measures are required for each parking space.
|
|
|
Title:
|
| | |
LIGHTING
|
|
Wording
|
| | |
Any lighting installed in parking areas shall be consistent with the requirements of the UDC, i.e. exterior lighting shall not exceed 30 feet in height above the finished grade for a commercial use. Exterior lighting shall be directed downwardand away from adjoining properties. No lighting shall blink, flash, or be of unusually high intensity or brightness.
|
|
|
Title:
|
| | |
HC PARKING
|
|
Wording
|
| | |
Parking for physically handicapped needs shall be provided consistent with State standards. A minimum of one (1) parking space is required. Parking spaces for physically handicapped needs shall comply with the Washington State Regulations for barrier-free facilities (WAC51-40). Such spaces shall not be less than twelve feet-6 inches (12' 6") wide.
|
|
|
Title:
|
| | |
LANDSCAPING
|
|
Wording
|
| | |
The existing landscaping areas in front of the building shall be continually maintained and groomed.
|
|
|
Title:
|
| | |
SIGN CONDITION
|
|
Wording
|
| | |
A sign permit may be required for the proposed attached sign. The total square footage of the sign shall not exceed 64 square feet. Any illunimation of the sign shall be shaded, shielded, or directed so the light intensity or brightness shall not adveresly affect surrounding properties or public rights of way or create a hazard or nuisance to the traveling public,or to surrounding properties.
|
|
|
Title:
|
| | |
SIGN REQUIREMENTS
|
|
Wording
|
| | |
No sign or part thereof shall consist of rotating, revolving, or moving parts; consist of banners, streamers, or spinners; or involve flashing,blinking or alternating lights.
|
|
|
Title:
|
| | |
INGRESS/EGRESS
|
|
Wording
|
| | |
All ingress and egress to a parking lot containing four (4) or more parking spaces shall be developed so vehicles entering and leaving the parking lot are headed in a forward motion.
|
|
|
Title:
|
| | |
AQUIFER RECHARGE CONDITIONS
|
|
Wording
|
| | |
Critical Aquifer Recharge Areas may require special protection measures to mitigate water quality degradation. The submitted proposal does not require additional aquifer protection measures. However, during construction the project shall follow the Best Management Practices (BMPs) and facility design standards as identified and defined in the Stormwater Management Manual for the Puget Sound Basin.
|
|
|
Title:
|
| | |
BMPs
|
|
Wording
|
| | |
The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.
|
|
|
Title:
|
| | |
F-Confirmed ESAs
|
|
Wording
|
| | |
The application was reviewed by the Jefferson County Department of Community Development staff on March 4, 2003 for the potential presence of Environmentally Sensitive Areas (ESAs) under the provisions of the Unified Development Code (UDC). After an initial Geographic Information Systems mapping review and an investigative site inspection, the following ESAs were confirmed to be present on the subject property: Purple Martin (fish & wildlife); Susceptible plus Commercial Aquifer Recharge Area and Sea Water Intrusion Protection Area.
|
|
|
Title:
|
| | |
F-Aquifer Recharge Area
|
|
Wording
|
| | |
Aquifer Recharge Areas in Jefferson County are characterized by porous geological formations that allow percolation of the surface water into the soils and the underlying zone of saturation. Aquifers are geologic formations that contain sufficient saturated permeable material to yield significant quantities of water to wells and springs. Aquifers serve as the source of drinking water within most of the rural portions of Jefferson County.
|
|
|
Title:
|
| | |
F-Susc. Aquifer Recharge Area
|
|
Wording
|
| | |
Susceptible Aquifer Recharge Areas are those with geologic and hydrologic conditions that promote rapid infiltration of recharge waters to groundwater aquifers.
|
|
|
Title:
|
| | |
F-Critical Aquifer Recharge Area
|
|
Wording
|
| | |
Critical Aquifer Recharge Areas are defined as Seawater Intrusion Areas, and Special Aquifer Recharge Protection Areas and the following land uses located within Susceptible Aquifer Recharge Areas (1) All Industrial Land Uses (2) All Commercial Uses (3) All Rural Residential Land Uses requiring a Discretionary Use or Conditional Use Permit (4) All Rural Residential Land Uses with nonconforming uses that would otherwise require a Discretionary Use or Conditional Use Permit (5) Unsewered Planned Rural Residential Developments (6) Unsewered residential development with gross densities greater than one unit per acre. All of the above listed uses shall be subject to the applicable requirements and standards of the Jefferson County Unified Development Code.
|
|
|
Title:
|
| | |
F-SIPZ
|
|
Wording
|
| | |
Marine shorelines and islands are susceptible to a condition that is known as seawater intrusion. Seawater intrusion is a condition in which the saltwater/freshwater interface in an aquifer moves inland so that wells drilled on upland areas cannot obtain freshwater suitable for public consumption without significant additional treatment and cost. Maintaining a stable balance in the saltwater/freshwater interface is primarily a function of the rate of aquifer recharge (primarily through rainfall) and the rate of groundwater withdrawals (primarily through wells). The Washington Department of Ecology is the agency with statutory authority to regulate groundwater withdrawal for individual wells in Jefferson County. New development, redevelopment, and land use activities on islands and in close proximity to marine shorelines in particular should be developed in such a manner to maximize aquifer recharge and maintain the saltwater/freshwater balance to the maximum extent possible by infiltrating stormwater runoff so that it recharges the aquifer.
|
|
|
Title:
|
| | |
F-Coastal SIPZ
|
|
Wording
|
| | |
The parcel is located within a coastal SIPZ (seawater intrusion protection zone) according to the County GIS map. There are voluntary and mandatory measures identified in the Jefferson County Seawater Intrusion Policy (Resolution 44-22, effective September 23, 2002) that apply to well drilling proposals and building permit applications on existing lots of record.
A Coastal SIPZ is defined as: all islands and area within one-quarter mile of marine shoreline, but no history of chloride concentration above 100 mg/L in groundwater sources within 1000 feet.
|
|
|
Title:
|
| | |
F-Stormwater
|
|
Wording
|
| | |
The applicant is proposing to create or add zero square feet of impervious surface and zero square feet of land disturbing activities. Sections 6.6 and 6.7 of the Jefferson County Unified Development Code requires that your proposal submit a stormwater calculation sheet.
|
|
|
Title:
|
| | |
F-SEPA Exempt
|
|
Wording
|
| | |
Jefferson County determined that this proposal is categorically exempt from review under the State Environmental Policy Act (SEPA) pursuant to WAC 197-11-800(1)(b)(i).
|
|
|
Title:
|
| | |
F-APPROVAL FOR INTERNET/SUBS ONLY
|
|
Wording
|
| | |
This approval is for a Internet & Sub Shop as a change of use only. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits.
|
|
|
Title:
|
| | |
F-ZONING/USE
|
|
Wording
|
| | |
The pacel is a legal non-conforming lot that is designated Rural Village Center (RVC) under the Jefferson County Comprehensive Plan Land Use Map effective August 28, 1998.
|
|
|
Title:
|
| | |
F-PRIOR SEPTIC [1977]
|
|
Wording
|
| | |
A septic permit (SEP77-00134) for expansion/repair of the sewage disposal system was issued 6/21/1977 and finaled 1/29/1992.
|
|
|
Title:
|
| | |
F-PRIOR SEPTIC [2002]
|
|
Wording
|
| | |
A septic system permit (SEP02-00244) for improvements and expansion of the existing sewage system was issued 11/15/2002. It has not been finaled.
|
|
|
Title:
|
| | |
F-PRIOR BUILDING PERMIT [1992]
|
|
Wording
|
| | |
A building permit (BLD92-00050) was issued for the building to change the use with minor structural and plumbing changes for the beauty shop. It was issued 2/5/1992 and finaled shortly thereafter.
|
|
|
Title:
|
| | |
F-PRIOR BUILDING PERMIT [1999]
|
|
Wording
|
| | |
A change of use permit (BLD99-00069) to change AA meeting facility to reception area for a hair salon. The permit was issued 2/23/1999 and finaled 2/4/2000.
|
|