Permit Case Summary

Case Number: Search Help

Case Number:BLD2003-00118 Case Status:Finaled Date Received:2/27/2003
Description:CHANGE OF USE - FROM SALON/OFFICE TO INTERNET/SUB SHOP Date Issued:3/18/2003
Applicant:BRIAN ANDERSON Expiration Date:3/18/2004 12:00:00 AM
Site Address:51 CHIMACUM RD Case Finaled:5/7/2003
Parcel No:901024051 Other Cases Parcel Data Map It More Details

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: Miscellaneous Action
Date Completed: 1/12/2006
Disposition: DONE
Description: Final Building Inspection
Date Completed: 5/7/2003
Disposition: DONE
Description: SEPTIC system FINALED
Date Completed: 5/8/2003
Disposition: DONE
Description: Final Planning Appr
Date Completed: 5/9/2003
Disposition: DONE
Description: SEPTIC system FINALED
Date Completed: 5/7/2003
Disposition: DONE
Description: Issue Building Permit (F)
Date Completed: 3/18/2003
Disposition: DONE
Description: Approve Permit-UF
Date Completed: 3/13/2003
Disposition: DONE
Description: Review Complete-U
Date Completed: 3/12/2003
Disposition: DONE
Description: Det. of Completeness-UF
Date Completed: 3/4/2003
Disposition: DONE
Description: Additional Info Request-U
Date Completed: 3/12/2003
Disposition: DONE
Description: Application Received-UF
Date Completed: 3/3/2003
Disposition: DONE
Description: App Substantially Complete-U
Date Completed: 3/4/2003
Disposition: DONE
Description: Case Entered
Date Completed: 2/28/2003
Disposition:
Description: Plan Check
Date Completed: 3/6/2003
Disposition: DONE
Description: Septic Review Complete-U
Date Completed: 3/5/2003
Disposition: DONE
Description: Stormwater Review-U
Date Completed: 3/12/2003
Disposition: DONE
Description: Env. Sensitive Area Review-U
Date Completed: 3/12/2003
Disposition: DONE
Description: Consistency Review-U
Date Completed: 3/12/2003
Disposition: DONE
Description: RAP Review Complete-U
Date Completed: 2/28/2003
Disposition: DONE
Description: DRD Approval (Zoning)
Date Completed: 3/12/2003
Disposition: DONE
Description: Building Permit Application(F)
Date Completed: 2/28/2003
Disposition: DONE

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: FOOD SERVICE CONDITION
Wording The applicant shall comply with the conditions of the March 6, 2003 approved Food Service Establishment Permit issued by the Jefferson County Environmental Health Department.

Title: PARKING
Wording Off-street parking shall be provided for the internet/deli business. A total of at least 10 parking spaces shall be provided for customers and employees. Wheel stops,striping, or similar measures are required for each parking space.

Title: LIGHTING
Wording Any lighting installed in parking areas shall be consistent with the requirements of the UDC, i.e. exterior lighting shall not exceed 30 feet in height above the finished grade for a commercial use. Exterior lighting shall be directed downwardand away from adjoining properties. No lighting shall blink, flash, or be of unusually high intensity or brightness.

Title: HC PARKING
Wording Parking for physically handicapped needs shall be provided consistent with State standards. A minimum of one (1) parking space is required. Parking spaces for physically handicapped needs shall comply with the Washington State Regulations for barrier-free facilities (WAC51-40). Such spaces shall not be less than twelve feet-6 inches (12' 6") wide.

Title: LANDSCAPING
Wording The existing landscaping areas in front of the building shall be continually maintained and groomed.

Title: SIGN CONDITION
Wording A sign permit may be required for the proposed attached sign. The total square footage of the sign shall not exceed 64 square feet. Any illunimation of the sign shall be shaded, shielded, or directed so the light intensity or brightness shall not adveresly affect surrounding properties or public rights of way or create a hazard or nuisance to the traveling public,or to surrounding properties.

Title: SIGN REQUIREMENTS
Wording No sign or part thereof shall consist of rotating, revolving, or moving parts; consist of banners, streamers, or spinners; or involve flashing,blinking or alternating lights.

Title: INGRESS/EGRESS
Wording All ingress and egress to a parking lot containing four (4) or more parking spaces shall be developed so vehicles entering and leaving the parking lot are headed in a forward motion.

Title: AQUIFER RECHARGE CONDITIONS
Wording Critical Aquifer Recharge Areas may require special protection measures to mitigate water quality degradation. The submitted proposal does not require additional aquifer protection measures. However, during construction the project shall follow the Best Management Practices (BMPs) and facility design standards as identified and defined in the Stormwater Management Manual for the Puget Sound Basin.

Title: BMPs
Wording The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.


Case Findings
Below is a list of findings for this permit case. Findings typically record facts that the staff are using as the basis of their permit processing decisions.
Title: F-Confirmed ESAs
Wording The application was reviewed by the Jefferson County Department of Community Development staff on March 4, 2003 for the potential presence of Environmentally Sensitive Areas (ESAs) under the provisions of the Unified Development Code (UDC). After an initial Geographic Information Systems mapping review and an investigative site inspection, the following ESAs were confirmed to be present on the subject property: Purple Martin (fish & wildlife); Susceptible plus Commercial Aquifer Recharge Area and Sea Water Intrusion Protection Area.

Title: F-Aquifer Recharge Area
Wording Aquifer Recharge Areas in Jefferson County are characterized by porous geological formations that allow percolation of the surface water into the soils and the underlying zone of saturation. Aquifers are geologic formations that contain sufficient saturated permeable material to yield significant quantities of water to wells and springs. Aquifers serve as the source of drinking water within most of the rural portions of Jefferson County.

Title: F-Susc. Aquifer Recharge Area
Wording Susceptible Aquifer Recharge Areas are those with geologic and hydrologic conditions that promote rapid infiltration of recharge waters to groundwater aquifers.

Title: F-Critical Aquifer Recharge Area
Wording Critical Aquifer Recharge Areas are defined as Seawater Intrusion Areas, and Special Aquifer Recharge Protection Areas and the following land uses located within Susceptible Aquifer Recharge Areas (1) All Industrial Land Uses (2) All Commercial Uses (3) All Rural Residential Land Uses requiring a Discretionary Use or Conditional Use Permit (4) All Rural Residential Land Uses with nonconforming uses that would otherwise require a Discretionary Use or Conditional Use Permit (5) Unsewered Planned Rural Residential Developments (6) Unsewered residential development with gross densities greater than one unit per acre. All of the above listed uses shall be subject to the applicable requirements and standards of the Jefferson County Unified Development Code.

Title: F-SIPZ
Wording Marine shorelines and islands are susceptible to a condition that is known as seawater intrusion. Seawater intrusion is a condition in which the saltwater/freshwater interface in an aquifer moves inland so that wells drilled on upland areas cannot obtain freshwater suitable for public consumption without significant additional treatment and cost. Maintaining a stable balance in the saltwater/freshwater interface is primarily a function of the rate of aquifer recharge (primarily through rainfall) and the rate of groundwater withdrawals (primarily through wells). The Washington Department of Ecology is the agency with statutory authority to regulate groundwater withdrawal for individual wells in Jefferson County. New development, redevelopment, and land use activities on islands and in close proximity to marine shorelines in particular should be developed in such a manner to maximize aquifer recharge and maintain the saltwater/freshwater balance to the maximum extent possible by infiltrating stormwater runoff so that it recharges the aquifer.

Title: F-Coastal SIPZ
Wording The parcel is located within a coastal SIPZ (seawater intrusion protection zone) according to the County GIS map. There are voluntary and mandatory measures identified in the Jefferson County Seawater Intrusion Policy (Resolution 44-22, effective September 23, 2002) that apply to well drilling proposals and building permit applications on existing lots of record. A Coastal SIPZ is defined as: all islands and area within one-quarter mile of marine shoreline, but no history of chloride concentration above 100 mg/L in groundwater sources within 1000 feet.

Title: F-Stormwater
Wording The applicant is proposing to create or add zero square feet of impervious surface and zero square feet of land disturbing activities. Sections 6.6 and 6.7 of the Jefferson County Unified Development Code requires that your proposal submit a stormwater calculation sheet.

Title: F-SEPA Exempt
Wording Jefferson County determined that this proposal is categorically exempt from review under the State Environmental Policy Act (SEPA) pursuant to WAC 197-11-800(1)(b)(i).

Title: F-APPROVAL FOR INTERNET/SUBS ONLY
Wording This approval is for a Internet & Sub Shop as a change of use only. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits.

Title: F-ZONING/USE
Wording The pacel is a legal non-conforming lot that is designated Rural Village Center (RVC) under the Jefferson County Comprehensive Plan Land Use Map effective August 28, 1998.

Title: F-PRIOR SEPTIC [1977]
Wording A septic permit (SEP77-00134) for expansion/repair of the sewage disposal system was issued 6/21/1977 and finaled 1/29/1992.

Title: F-PRIOR SEPTIC [2002]
Wording A septic system permit (SEP02-00244) for improvements and expansion of the existing sewage system was issued 11/15/2002. It has not been finaled.

Title: F-PRIOR BUILDING PERMIT [1992]
Wording A building permit (BLD92-00050) was issued for the building to change the use with minor structural and plumbing changes for the beauty shop. It was issued 2/5/1992 and finaled shortly thereafter.

Title: F-PRIOR BUILDING PERMIT [1999]
Wording A change of use permit (BLD99-00069) to change AA meeting facility to reception area for a hair salon. The permit was issued 2/23/1999 and finaled 2/4/2000.