Description:
|
| | |
Miscellaneous action
|
|
Date Completed:
|
| | |
1/12/2006
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Final Building Inspection
|
|
Date Completed:
|
| | |
2/23/2005
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Inspection Reminder Sent
|
|
Date Completed:
|
| | |
2/8/2005
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Footing & Setback Inspection
|
|
Date Completed:
|
| | |
2/26/2003
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Foundation Inspection
|
|
Date Completed:
|
| | |
2/26/2003
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Change Status to RENEWED
|
|
Date Completed:
|
| | |
2/26/2003
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Det. of Completeness-UF
|
|
Date Completed:
|
| | |
2/24/2003
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Review Complete-U
|
|
Date Completed:
|
| | |
2/24/2003
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Approve Permit-UF
|
|
Date Completed:
|
| | |
2/24/2003
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Issue Building Permit (F)
|
|
Date Completed:
|
| | |
2/24/2003
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Application Received-UF
|
|
Date Completed:
|
| | |
2/12/2003
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
App Substantially Complete-U
|
|
Date Completed:
|
| | |
2/24/2003
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Case Entered
|
|
Date Completed:
|
| | |
2/10/2003
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Plan Check
|
|
Date Completed:
|
| | |
2/18/2003
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Septic Review Complete-U
|
|
Date Completed:
|
| | |
2/12/2003
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Contractor License/Bond Info
|
|
Date Completed:
|
| | |
2/10/2003
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Stormwater Review-U
|
|
Date Completed:
|
| | |
2/24/2003
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Env. Sensitive Area Review-U
|
|
Date Completed:
|
| | |
2/24/2003
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Consistency Review-U
|
|
Date Completed:
|
| | |
2/24/2003
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
RAP Review Complete-U
|
|
Date Completed:
|
| | |
2/10/2003
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Building Permit Application(F)
|
|
Date Completed:
|
| | |
2/10/2003
|
|
Disposition:
|
| | |
DONE
|
|
|
Title:
|
| | |
Bld Setbacks
|
|
Wording
|
| | |
Minimum setback from SR19 is 35 feet. Minimum side and rear setbacks are 5 feet. Buffers for environmentally sensitive areas further impact setbacks.
|
|
|
Title:
|
| | |
Bld building height
|
|
Wording
|
| | |
The building height is not to exceed 35 feet.
|
|
|
Title:
|
| | |
Bld lot coverage
|
|
Wording
|
| | |
Maximum lot coverage is not to exceed 25%.
|
|
|
Title:
|
| | |
Do Not Disturb Buffer
|
|
Wording
|
| | |
All construction activities shall not encroach upon the buffer. This includes the storage or preparation of materials.
|
|
|
Title:
|
| | |
Streamside Setback
|
|
Wording
|
| | |
The identified Fish and Wildlife Habitat Area (Type 1 Stream), shall maintain a vegetative buffer setback of 150-feet. The setback shall be measured horizontally from the Ordinary High Water Mark (OHWM) to the proposed shop.
|
|
|
Title:
|
| | |
5-Foot Stream Setback
|
|
Wording
|
| | |
An additional setback of five (5) feet is required from the edge of the buffer area to the proposed shop.
|
|
|
Title:
|
| | |
Aquifer Recharge Conditions (SFR)
|
|
Wording
|
| | |
Critical Aquifer Recharge Areas may require special protection measures to mitigate water quality degradation. The submitted proposal does not require additional aquifer protection measures. However, during construction the project shall follow the Best Management Practices (BMPs) and facility design standards as identified and defined in the Stormwater Management Manual for the Puget Sound Basin.
|
|
|
Title:
|
| | |
Stormwater Plan
|
|
Wording
|
| | |
A Small Parcel Erosion and Sediment Control Plan has been submitted and approved by the Department of Community Development. Once the subject permit has been issued the applicant shall fully implement the provisions of the submitted plan and contact the Jefferson County Department of Community Development to arrange a schedule to inspect the property for plan compliance. A Certificate of Occupancy will not be issued until the Department verifies plan compliance. No clearing for roadways or utilities shall occur on the project site until clearing necessary for the installation of temporary sedimentation and erosion control measures have been completed.
|
|
|
Title:
|
| | |
F-ACCESS
|
|
Wording
|
| | |
Rhody Dr (SR 19) is a minor arterial road. The road approach is existing, and an address of 10234 SR 19 has been assigned to the parcel.
|
|
|
Title:
|
| | |
F-CASE HISTORY
|
|
Wording
|
| | |
A septic permit (SEP78-00203) was finaled April 11, 1979. Designation of a reserve drainfield area was approved February 3, 2003.
|
|
|
Title:
|
| | |
F-Confirmed ESAs
|
|
Wording
|
| | |
The application was reviewed by the Jefferson County Department of Community Development staff on February 19, 2003 for the potential presence of Environmentally Sensitive Areas (ESAs) under the provisions of the Unified Development Code (UDC). After an initial Geographic Information Systems mapping review and an investigative site inspection, the following ESAs were confirmed to be present on the subject property: Conservancy Shoreline, Type I Stream, Wetlaqnds, Seismic Hazard, Flood Hazard, Susceptible Aquifer Recharge Area and Special Aquifer Recharge Protection Area..
|
|
|
Title:
|
| | |
F-Aquifer Recharge Area
|
|
Wording
|
| | |
Aquifer Recharge Areas in Jefferson County are characterized by porous geological formations that allow percolation of the surface water into the soils and the underlying zone of saturation. Aquifers are geologic formations that contain sufficient saturated permeable material to yield significant quantities of water to wells and springs. Aquifers serve as the source of drinking water within most of the rural portions of Jefferson County.
|
|
|
Title:
|
| | |
F-Susc. Aquifer Recharge Area
|
|
Wording
|
| | |
Susceptible Aquifer Recharge Areas are those with geologic and hydrologic conditions that promote rapid infiltration of recharge waters to groundwater aquifers.
|
|
|
Title:
|
| | |
F-Critical Aquifer Recharge Area
|
|
Wording
|
| | |
Critical Aquifer Recharge Areas are defined as Seawater Intrusion Areas, and Special Aquifer Recharge Protection Areas and the following land uses located within Susceptible Aquifer Recharge Areas (1) All Industrial Land Uses (2) All Commercial Uses (3) All Rural Residential Land Uses requiring a Discretionary Use or Conditional Use Permit (4) All Rural Residential Land Uses with nonconforming uses that would otherwise require a Discretionary Use or Conditional Use Permit (5) Unsewered Planned Rural Residential Developments (6) Unsewered residential development with gross densities greater than one unit per acre. All of the above listed uses shall be subject to the applicable requirements and standards of the Jefferson County Unified Development Code.
|
|
|
Title:
|
| | |
F-Streams
|
|
Wording
|
| | |
A Type 1 Stream (Fish and Wildlife Habitat Area) has been identified on the subject property. The stream will require a setback of 150-feet. The setback shall be measured horizontally from the Ordinary High Water Mark (OHWM). Fish and Wildlife Habitat Areas shall also have Buffers and Building Setbacks established.
|
|
|
Title:
|
| | |
F-Buffers
|
|
Wording
|
| | |
Buffers are areas that shall be maintained in their natural condition, however, minor pruning or alteration of vegetation may be permitted as long as the function and character of the buffer are not diminished.
|
|
|
Title:
|
| | |
F-Native Vegetation List
|
|
Wording
|
| | |
Among the native conifer species which may be used in buffers or for re-vegetation include, but are not limited to: Grand Fir (Aibes grandis), Sitka Spruce (Picea Sitchensis), Shore Pine (Pinus Contorta), Douglas Fir (Pseudotsuga Menziesii), Western Red Cedar (Thuja Plicata), and Western Hemlock (Tsuga Heterophylla).
Among native tree species which may be used includes: Vine Maple (Acer Circinatum), Big-Leaf Maple (Acer Macrophyllum), Red Alder (Alnus Rubra), Pacific Madrone (Arbutus Menziesii), Quaking Aspen (Populus Tremula), Black Cottonwood (Populus Trichocarpa), Bitter Cherry (Prunus Emarginata), Oregon White Oak (Quercus Garryana), Cascara (Rhamnus Purshiana), Pacific Willow (Saliz Lasiandra), and Scouler's Willow (Saliz Scouleriana).
Among the native shrub species which may be used are: Sevice-Berry (Amalanchier Alnifolia), Red Osier Dogwood (Cornus Stolonifera) Salal (Gaultheria Shallon), Ocean Spray (Holodiscus Discolor), Indian Plum (Oemlaria Cerasiformis), Pacific Ninebark (Physocarpus Capitus), Red Flowering Currant (Ribes Sanguineum), Wild Rose (Rosa Nutkana), Swamp Rose (Rosa Pisocarpa), Willows (Salix ssp.), Red Elderberry (Sambucus Racemosa), Snowberry (Symphoricarpos Albus), Evergreen Huckleberry (Vaccinium Ovatum), Red Huckleberry (Vaccinium Parvifolium).
|
|
|
Title:
|
| | |
F-Wetland Delineation Waiver
|
|
Wording
|
| | |
The project components are more than 250' from the mapped/identified wetland. The requirement for a wetland delineation and report is waived based on maintenance of a 225' buffer from the wetland per UDC Table 3-3.
|
|
|
Title:
|
| | |
F-Stormwater
|
|
Wording
|
| | |
The applicant is proposing to create or add 3,800 square feet of impervious surface and 3,800 square feet of land disturbing activities. Sections 6.6 and 6.7 of the Jefferson County Unified Development Code requires that your proposal submit a Small Parcel Erosion and Sediment Control Plan.
|
|
|
Title:
|
| | |
F-SEPA Exempt
|
|
Wording
|
| | |
Jefferson County determined that this proposal is categorically exempt from review under the State Environmental Policy Act (SEPA) pursuant to WAC 197-11-800(1)(b)(i).
|
|
|
Title:
|
| | |
F-Site Plan Changes
|
|
Wording
|
| | |
The site plan as submitted with the building application on February 10, 2003 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated February 24, 2003 shall be resubmitted for review and approval by Jefferson County Department of Community Development.
|
|
|
Title:
|
| | |
F-Approval for _____ Only
|
|
Wording
|
| | |
This approval is for a shop only. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits.
|
|
|
Title:
|
| | |
F-PARKING
|
|
Wording
|
| | |
A minimum of two (2) on-site parking spaces are required for a single family residence.
|
|
|
Title:
|
| | |
F-FLOOD & STREAM
|
|
Wording
|
| | |
Development Review staff conducted a site visit February 24, 2003 and determined the proposed shop's location is located out of the flood plain and more than 1,000 feet from the Chimacum Creek.
|
|