Permit Case Summary

Case Number: Search Help

Case Number:BLD2003-00025 Case Status:Finaled Date Received:1/13/2003
Description:FREESTANDING WORKROOM/STORAGE ADDITION TO MOBILE HOME Date Issued:3/13/2003
Applicant:KENNETH GOLDEN Expiration Date:3/13/2005 12:00:00 AM
Site Address:431 CEDAR AVE Case Finaled:5/20/2003
Parcel No:986401103 Other Cases Parcel Data Map It More Details Parcels Images

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: File Archived
Date Completed: 1/12/2006
Disposition: DONE
Description: Final Building Inspection
Date Completed: 5/20/2003
Disposition: DONE
Description: Miscellaneous inspection
Date Completed:
Disposition:
Description: Wallboard Inspection
Date Completed: 4/28/2003
Disposition: DONE
Description: Insulation Inspection
Date Completed: 4/21/2003
Disposition: DONE
Description: Framing Inspection
Date Completed: 4/15/2003
Disposition: DONE
Description: Foundation Inspection
Date Completed: 3/24/2003
Disposition: DONE
Description: Change Status to RENEWED
Date Completed: 3/21/2003
Disposition: DONE
Description: Footing & Setback Inspection
Date Completed: 3/21/2003
Disposition: DONE
Description: Review Complete-U
Date Completed: 3/13/2003
Disposition: DONE
Description: Approve Permit-UF
Date Completed: 3/13/2003
Disposition: DONE
Description: Issue Building Permit (F)
Date Completed: 3/13/2003
Disposition: DONE
Description: Issue Building Permit (F)
Date Completed: 3/13/2003
Disposition: DONE
Description: Det. of Completeness-UF
Date Completed: 1/25/2003
Disposition: DONE
Description: Additional Info Request-U
Date Completed: 1/29/2003
Disposition: DONE
Description: App Substantially Complete-U
Date Completed: 1/25/2003
Disposition: DONE
Description: Case Entered
Date Completed: 1/14/2003
Disposition:
Description: Plan Check
Date Completed: 3/12/2003
Disposition: DONE
Description: Septic Review Complete-U
Date Completed: 2/25/2003
Disposition: DONE
Description: Contractor License/Bond Info
Date Completed: 1/14/2003
Disposition: DONE
Description: Stormwater Review-U
Date Completed: 3/13/2003
Disposition: DONE
Description: Env. Sensitive Area Review-U
Date Completed: 3/13/2003
Disposition: DONE
Description: Consistency Review-U
Date Completed: 3/13/2003
Disposition: DONE
Description: RAP Review Complete-U
Date Completed: 1/14/2003
Disposition: DONE
Description: Building Permit Application(F)
Date Completed: 1/14/2003
Disposition: DONE
Description: Application Received-UF
Date Completed: 1/14/2003
Disposition: DONE

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: Bld Custom Condition
Wording FINAL SIGN-OFF ON LABOR & INDUSTRIES PERMIT REQUIRED PRIOR TO FINAL CERTIFICATE OF OCCUPANCY.

Title: Bld Setbacks
Wording First Street is classified as a local access road and thus requires a minimum 20-foot front yard setback. The side and rear lot lines require a minimum 5-feet. All setbacks shall be measured perpendicularly from the lot line to any proposed development.

Title: Bld building height
Wording The building height is not to exceed 35 feet.

Title: Bld lot coverage
Wording Maximum lot coverage is not to exceed 25%. Lot coverage is defined by the amount of impervious surface which includes roof tops, driveways, concrete, etc.

Title: Aquifer Recharge Conditions (SFR)
Wording Critical Aquifer Recharge Areas may require special protection measures to mitigate water quality degradation. The submitted proposal does not require additional aquifer protection measures. However, during construction the project shall follow the Best Management Practices (BMPs) and facility design standards as identified and defined in the Stormwater Management Manual for the Puget Sound Basin.

Title: BMPs
Wording The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.


Case Findings
Below is a list of findings for this permit case. Findings typically record facts that the staff are using as the basis of their permit processing decisions.
Title: F-Custom Universal Finding
Wording A Declaration of Easement was recorded to allow the septic to be installed on an adjoining lot. The easement was filed under Vol 349, Pg 113 with the Jefferson County Auditors Office.

Title: F-Aquifer Recharge Area
Wording Aquifer Recharge Areas in Jefferson County are characterized by porous geological formations that allow percolation of the surface water into the soils and the underlying zone of saturation. Aquifers are geologic formations that contain sufficient saturated permeable material to yield significant quantities of water to wells and springs. Aquifers serve as the source of drinking water within most of the rural portions of Jefferson County.

Title: F-Susc. Aquifer Recharge Area
Wording Susceptible Aquifer Recharge Areas are those with geologic and hydrologic conditions that promote rapid infiltration of recharge waters to groundwater aquifers.

Title: F-No ESAs Found
Wording The application was reviewed by the Jefferson County Department of Community Development for the presence of Environmentally Sensitive Areas (ESAs). The Department conducted a review and has concluded that the property DOES NOT contain Environmentally Sensitive Areas. However, future proposals will be subject to a new ESA review and conditions may be added if new ESAs are found on the property.

Title: F-Stormwater
Wording The applicant is proposing to create or add 280 square feet of impervious surface. Sections 6.6 and 6.7 of the Jefferson County Unified Development Code requires that your proposal adhere to Best Management Practices (BMPs) to control sedimentation and erosion on the subject property.

Title: F-Site Plan Changes
Wording The site plan as submitted with the building application on 1/13/03 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated 1/29/03 shall be resubmitted for review and approval by Jefferson County Department of Community Development.

Title: F-Approval for _____ Only
Wording This approval is for an addition to a mobile home only. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits.