Permit Case Summary

Case Number: Search Help

Case Number:BLD2003-00004 Case Status:Finaled Date Received:1/3/2003
Description:SHERIFF / DISPATCH / EOC Date Issued:4/22/2003
Applicant: JEFFERSON COUNTY Expiration Date:4/22/2005 12:00:00 AM
Site Address:81 ELKINS RD Case Finaled:3/1/2005
Parcel No:901111009 Other Cases Parcel Data Map It More Details

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: Miscellaneous Action
Date Completed: 7/21/2011
Disposition: DONE
Description: File Archived
Date Completed: 1/24/2006
Disposition: DONE
Description: Certificate of Occupancy-F
Date Completed: 3/1/2005
Disposition: DONE
Description: Final Building Inspection
Date Completed: 3/1/2005
Disposition: DONE
Description: Miscellaneous inspection
Date Completed:
Disposition:
Description: TEMPORARY Cert of Occupancy(F)
Date Completed:
Disposition:
Description: Plumbing Inspection
Date Completed: 7/1/2004
Disposition: DONE
Description: Framing Inspection
Date Completed: 7/1/2004
Disposition: DONE
Description: Underground Plumbing Insp.
Date Completed: 6/10/2004
Disposition: DONE
Description: TEMPORARY Cert of Occupancy(F)
Date Completed:
Disposition:
Description: Plumbing Inspection
Date Completed: 2/23/2004
Disposition: DONE
Description: Wallboard Inspection
Date Completed: 2/10/2004
Disposition: DONE
Description: Wallboard Inspection
Date Completed: 1/21/2004
Disposition: DONE
Description: Insulation Inspection
Date Completed: 1/21/2004
Disposition: DONE
Description: Miscellaneous inspection
Date Completed: 1/14/2004
Disposition: DONE
Description: Framing Inspection
Date Completed: 1/12/2004
Disposition: DONE
Description: Insulation Inspection
Date Completed: 1/12/2004
Disposition: DONE
Description: Plumbing Inspection
Date Completed: 1/6/2004
Disposition: DONE
Description: Framing Inspection
Date Completed: 1/5/2004
Disposition: DONE
Description: Shear Wall Inspection
Date Completed: 12/29/2003
Disposition: DONE
Description: Shear Wall Inspection
Date Completed: 11/25/2003
Disposition: DONE
Description: Miscellaneous inspection
Date Completed: 10/13/2003
Disposition: DONE
Description: Footing & Setback Inspection
Date Completed: 9/3/2003
Disposition: DONE
Description: Plumbing Inspection
Date Completed: 8/13/2003
Disposition: DONE
Description: Foundation Inspection
Date Completed: 8/6/2003
Disposition: DONE
Description: Change Status to RENEWED
Date Completed: 7/31/2003
Disposition: DONE
Description: Footing & Setback Inspection
Date Completed: 7/31/2003
Disposition: DONE
Description: Issue Building Permit (F)
Date Completed: 4/22/2003
Disposition: DONE
Description: Review Complete-U
Date Completed: 4/18/2003
Disposition: DONE
Description: App Substantially Complete-U
Date Completed: 3/3/2003
Disposition: DONE
Description: Case Entered
Date Completed: 1/6/2003
Disposition:
Description: Plan Check
Date Completed: 3/25/2003
Disposition: DONE
Description: Septic Review Complete-U
Date Completed: 2/28/2003
Disposition: DONE
Description: Potable Water Approval
Date Completed: 1/13/2003
Disposition: DONE
Description: Contractor License/Bond Info
Date Completed: 4/18/2003
Disposition: DONE
Description: Stormwater Review-U
Date Completed: 4/16/2003
Disposition: DONE
Description: Env. Sensitive Area Review-U
Date Completed: 3/3/2003
Disposition: DONE
Description: Consistency Review-U
Date Completed: 4/16/2003
Disposition: DONE
Description: RAP Review Complete-U
Date Completed: 1/6/2003
Disposition: DONE
Description: Final Planning Appr
Date Completed: 4/18/2003
Disposition: DONE
Description: DRD Approval (Zoning)
Date Completed: 4/16/2003
Disposition: DONE
Description: Building Permit Application(F)
Date Completed: 1/6/2003
Disposition: DONE
Description: Application Received-UF
Date Completed: 1/6/2003
Disposition: DONE

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: LIGHTING
Wording Lighting fixtures shall be designed and hooded to prevent the light source from being directly visible from outside the boundaries of the properties. The intensity or brightness of all lighting, during construction and after project completion shall not adversely affect the use of surrounding properties and adoining rights-of-way.

Title: LIGHTING
Wording Exterior flashing, moving, or blinking lighting is prohibited.

Title: LANDSCAPING
Wording A "Screen-C" landscaping shall be provided adjacent to Elkins Road in front of the new sheriff facility building. The landscaping shall be a minimum of 10 feet in width and consist of a mix of evergreen and deciduous trees and shrubs generally interspersed to create a continuous canopy.

Title: LANDSCAPING
Wording A landscaping plan has been submitted for review. Revisions to the landscaping plan shall be reviewed by the Development Review Division for compliance with the UDC.

Title: LANDSCAPING
Wording Areas disturbed during construction shall be replanted with native vegetation and maintained until firmly established.

Title: LANDSCAPING
Wording Topsoil removed during the course of construction shall be redistributed on all landscaped surfaces and shall be stabilized by seeding and planting.

Title: LANDSCAPING
Wording The existing vegetation screen around the property perimeter shall be maintained.

Title: LANDSCAPING
Wording All landscaping and necessary support systems shall be maintained for the life of the project.

Title: LANDSCAPING
Wording All landscape materials shall be pruned and trimmed as necessary to maintain a healthy growing condition.

Title: LANDSCAPING
Wording Landscaping areas shall be kept free of trash.

Title: MATERIALS OUTSIDE
Wording All materials stored outside buildings or structures, which are not for display or immediate sale shall be screened from areas frequented by the general public. Areas frequented by the general public shall be defined as public streets and rights-of-ways, and other areas normally used by the general public located adjacent to the subject property.

Title: NOISE
Wording Noise levels shall not exceed those levels established by the Washington State Department of Ecology under WAC 173-60, and by Jefferson County under Resolution No 67-85 , "Establishment of Environmental Designations for Noise Abatement Areas for Jefferson County".

Title: SETBACKS
Wording The minimum setbacks are required: Setback from Elkins Road: 20 feet Setback from Chimacum Road: 30 feet North and east setbacks: 35 feet

Title: PARKING
Wording A minimum fo 20 parking spaces is required. Revised parking plan identifies a net gain of 26 parking spaces. The ADA requirements raised by Jefferson Transit shall be addressed, which may require some redesign of parking/circulation to achieve as much of the ADA objectives as possible inaccordance with Finding 9 and Conclusion 2 of the Open Record Hearing Examiners decision dated March 27, 2003, subject to approval by Development Review.

Title: PARKING
Wording The applicant shall comply with Table 6-3 of the UDC for minimum dimensions for parking stalls and aisles.

Title: PARKING
Wording A minimum of one (1) handicap parking space is required and shall be not less than 13 feet 0 inches wide.

Title: PARKING
Wording The handicap parking spaces shall be designated with appropriate signage consistent with state requirements.

Title: PARKING
Wording Parking spaces shall be developed so vehicles entering and leaving the parking lot are headed in a forward motion.

Title: PARKING
Wording Parking lots and accesses shall be provided with an all-weather surface.

Title: PARKING
Wording Parking spaces shall be designated by wheel stops, striping, or similar measures.

Title: PARKING
Wording No loading and off-loading shall occur on the road rights-of-way.

Title: ADDRESS
Wording The address plate(s) shall be located in accordance with the provisions of the Jefferson County 911 Emergency Locator System Ordinance.

Title: SIGNS
Wording All street signs, traffic signs, and traffic striping shall be installed prior to final approval.

Title: SIGNS
Wording Proposed signs are subject to separate application and review. Proposed signs may require a building permit.

Title: ARCHAEOLOGICAL
Wording If during excavation or development of the site an area of potential archaeological significance is uncovered, all activity in the immediate area shall be halted, and the Administrator shall be notified at once.

Title: FINAL ZONING
Wording Prior to final building inspection, the applicant shall contact the Development Review Division to ensure that the above conditions have been met.

Title: Landslide Vegetative Buffer
Wording A vegetative buffer of 30-feet shall be permanently maintained from the top or edge of the Landslide Hazard Area. All buffers shall be measured perpendicularly from the top of the Landslide Hazard Area.

Title: Slide Buffer-Native Vegetation
Wording Landslide Hazard Areas and their associated buffers shall remain naturally vegetated. Should buffer disturbance occur during construction, the Unified Development Code (UDC) Administrator shall require replanting with native vegetation. No alterations shall be made to the Landslide Hazard Area or its associated buffer without prior authorization by the UDC Administrator.

Title: Identify Landslide Hazard Buffer
Wording Prior to and during approved construction activities, the perimeter of the landslide hazard area buffer shall be marked with a temporary sign. The sign shall be placed in such a manner that it can be directly observed from the construction area. The sign shall contain the following statement: "Landslide Hazard Area and Buffer - Do not Remove or Alter Existing Vegetation."

Title: Do Not Disturb Buffer
Wording All construction activities shall not encroach upon the buffer. This includes the storage or preparation of materials.

Title: Permanent Landslide Boundary
Wording The applicant shall permanently separate the boundary of the Landslide Hazard Area Buffer from the remainder of the subject property through installing logs, trees, a hedge row, or any other prominent physical marking approved by the UDC Administrator.

Title: Stormwater Plan
Wording Applicant/contractor(s) shall comply with the requirements, recommendation, and/or conditions of the stormwater site plan that includes a temporary erosion and sediment control plan and a permanent stormwater quality control plan as prepared by the consultant and approved by the Department of Public Works. Stormwater detention facilities shall be constructed in accordance with approved specified plans.


Case Findings
Below is a list of findings for this permit case. Findings typically record facts that the staff are using as the basis of their permit processing decisions.
Title: F-Confirmed ESAs
Wording The application was reviewed by the Jefferson County Department of Community Development staff on November 14, 2002 for the potential presence of Environmentally Sensitive Areas (ESAs) under the provisions of the Unified Development Code (UDC). After an initial Geographic Information Systems mapping review and an investigative site inspection, the following ESAs were confirmed to be present on the subject property: seismic; landslide 1; SUSC aquifer recharge; mineral lands adjacent.

Title: F-Aquifer Recharge Area
Wording Aquifer Recharge Areas in Jefferson County are characterized by porous geological formations that allow percolation of the surface water into the soils and the underlying zone of saturation. Aquifers are geologic formations that contain sufficient saturated permeable material to yield significant quantities of water to wells and springs. Aquifers serve as the source of drinking water within most of the rural portions of Jefferson County.

Title: F-Susc. Aquifer Recharge Area
Wording Susceptible Aquifer Recharge Areas are those with geologic and hydrologic conditions that promote rapid infiltration of recharge waters to groundwater aquifers.

Title: F-Geohazard Area
Wording Geologically Hazardous Areas in Jefferson County are characterized by slope, soil type, geologic material, and groundwater that may combine to create problems with slope stability, erosion, and water quality during and after construction or during natural events such as earthquakes or severe rainstorms.

Title: F-Adj. Mineral Land Disclosure
Wording Jefferson County has determined that the use of certain properties for mineral resource extraction and processing activities is necessary to ensure resource availability in the County. The County will not consider to be a nuisance those inconveniences or discomforts arising from extraction and processing operations, if such operations are consistent with commonly acceped best management practices and comply with local, state, and federal laws. If your property is within five hundred (500) feet of property designated as Mineral Resource Land (MRL), you may be subject to inconveniences or discomforts arising from such operations, including but not limited to noise, tree removal, odors, fumes, dust, smoke, the operation of machinery, and the storage and disposal of aggegate products. One or more of the inconveniences described may occur as a result of extraction and processing operations which are in conformance with existing laws and regulations.

Title: F-Stormwater
Wording Applicant/contractor(s) shall comply with all conditions of the Stormwater Permit (BLD03-0104) approved March 6, 2003 by the Department of Community Development.