Permit Case Summary

Case Number: Search Help

Case Number:BLD2002-00224 Case Status:Finaled Date Received:4/18/2002
Description:POLE BUILDING / GARAGE Date Issued:6/21/2002
Applicant:PHYLLIS OLSON Expiration Date:6/21/2003 12:00:00 AM
Site Address:360 CEDAR ST Case Finaled:7/19/2002
Parcel No:986401301 Other Cases Parcel Data Map It More Details Parcels Images

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: File Archived
Date Completed: 12/6/2004
Disposition: DONE
Description: Final Plumbing/BLD Inspection
Date Completed: 7/19/2002
Disposition: DONE
Description: Approve Permit-UF
Date Completed: 6/21/2002
Disposition: DONE
Description: Issue Building Permit (F)
Date Completed: 6/21/2002
Disposition: DONE
Description: Review Complete-U
Date Completed: 6/20/2002
Disposition: DONE
Description: Document Recorded
Date Completed: 6/4/2002
Disposition: DONE
Description: Det. of Completeness-UF
Date Completed: 5/8/2002
Disposition: DONE
Description: Additional Info Request-U
Date Completed: 6/5/2002
Disposition: DONE
Description: Application Received-UF
Date Completed: 4/22/2002
Disposition: DONE
Description: App Substantially Complete-U
Date Completed: 5/8/2002
Disposition: DONE
Description: Case Entered
Date Completed: 4/19/2002
Disposition:
Description: Plan Check
Date Completed: 6/20/2002
Disposition: DONE
Description: Septic Review Complete-U
Date Completed: 4/23/2002
Disposition: DONE
Description: Contractor License/Bond Info
Date Completed: 4/19/2002
Disposition: DONE
Description: Stormwater Review-U
Date Completed: 6/5/2002
Disposition: DONE
Description: Env. Sensitive Area Review-U
Date Completed: 6/5/2002
Disposition: DONE
Description: Consistency Review-U
Date Completed: 6/5/2002
Disposition: DONE
Description: RAP Review Complete-U
Date Completed: 4/19/2002
Disposition: DONE
Description: Building Permit Application(F)
Date Completed: 4/19/2002
Disposition:

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: Bld Setbacks
Wording Cedar Avenue is classified as a local access road and requires a minimum 20-foot front yard setback from the road. The side and rear lot lines shall be a minimum 5-feet. All setbacks shall be measured from the lot lines to the proposed development.

Title: Bld building height
Wording The building height is not to exceed 35 feet.

Title: Bld lot coverage
Wording Maximum lot coverage is not to exceed 25%. Lot coverage is defined by the amount of impervious surface which includes concrete, roof tops, driveways, etc.

Title: Aquifer Recharge Conditions (SFR)
Wording Critical Aquifer Recharge Areas may require special protection measures to mitigate water quality degradation. The submitted proposal does not require additional aquifer protection measures. However, during construction the project shall follow the Best Management Practices (BMPs) and facility design standards as identified and defined in the Stormwater Management Manual for the Puget Sound Basin (see attached).

Title: BMPs
Wording The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.


Case Findings
Below is a list of findings for this permit case. Findings typically record facts that the staff are using as the basis of their permit processing decisions.
Title: F-Confirmed ESAs
Wording The application was reviewed by the Jefferson County Department of Community Development staff on 5/8/02 for the potential presence of Environmentally Sensitive Areas (ESAs) under the provisions of the Unified Development Code (UDC). After an initial Geographic Information Systems mapping review and an investigative site inspection, the following ESAs were confirmed to be present on the subject property: Susceptible Aquifer Recharge Area.

Title: F-Aquifer Recharge Area
Wording Aquifer Recharge Areas in Jefferson County are characterized by porous geological formations that allow percolation of the surface water into the soils and the underlying zone of saturation. Aquifers are geologic formations that contain sufficient saturated permeable material to yield significant quantities of water to wells and springs. Aquifers serve as the source of drinking water within most of the rural portions of Jefferson County.

Title: F-Susc. Aquifer Recharge Area
Wording Susceptible Aquifer Recharge Areas are those with geologic and hydrologic conditions that promote rapid infiltration of recharge waters to groundwater aquifers.

Title: F-Stormwater
Wording The applicant is proposing to create or add 520 square feet of impervious surface. Sections 6.6 and 6.7 of the Jefferson County Unified Development Code requires that your proposal adhere to Best Management Practices (BMPs) to control sedimentation and erosion on the subject property.

Title: F-Site Plan Changes
Wording The site plan as submitted with the building application on 4/18/02 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated 6/5/02 shall be resubmitted for review and approval by Jefferson County Department of Community Development.

Title: F-Custom Case Specific Finding
Wording The proposal will be constructed utilizing two seperate legal lots of record (lots 1 & 2) of Phillips Addition. The applicant has filed a Declaration of Restrictive Covenant to construct across the lots. The document was filed under Auditors File No. 456604.

Title: F-Custom Case Specific Finding
Wording The proposed structure will be placed on an vacated easement. The Jefferson County Dept. of Public Works found the easement underwent a standard vacation and was vacated on 7/23/79.