Description:
|
| | |
File Archived
|
|
Date Completed:
|
| | |
12/17/2002
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Final Inspection
|
|
Date Completed:
|
| | |
9/26/2001
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
FINAL sign-off
|
|
Date Completed:
|
| | |
9/26/2001
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
SEPTIC system FINALED
|
|
Date Completed:
|
| | |
9/11/2001
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Issue Mobile Home Permit (F)
|
|
Date Completed:
|
| | |
7/25/2001
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Approve Permit-UF
|
|
Date Completed:
|
| | |
7/25/2001
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Review Complete-U
|
|
Date Completed:
|
| | |
7/24/2001
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Print Dummy UDC Permit-UF
|
|
Date Completed:
|
| | |
7/24/2001
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Application Received-UF
|
|
Date Completed:
|
| | |
7/9/2001
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
App Substantially Complete-U
|
|
Date Completed:
|
| | |
7/24/2001
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Case Entered
|
|
Date Completed:
|
| | |
7/6/2001
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Plan Check
|
|
Date Completed:
|
| | |
7/23/2001
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Septic Review Complete-U
|
|
Date Completed:
|
| | |
7/20/2001
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Potable Water Approval
|
|
Date Completed:
|
| | |
7/6/2001
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Stormwater Review-U
|
|
Date Completed:
|
| | |
7/24/2001
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Env. Sensitive Area Review-U
|
|
Date Completed:
|
| | |
7/24/2001
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Consistency Review-U
|
|
Date Completed:
|
| | |
7/24/2001
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
RAP Review Complete-U
|
|
Date Completed:
|
| | |
7/6/2001
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Building Permit Application(F)
|
|
Date Completed:
|
| | |
7/6/2001
|
|
Disposition:
|
| | |
DONE
|
|
|
Title:
|
| | |
Bld Setbacks
|
|
Wording
|
| | |
Minimum setback from Chimacum Road shall be 20 feet. Minimum side and rear setbacks shall be 5 feet.
|
|
|
Title:
|
| | |
Bld building height
|
|
Wording
|
| | |
The building height shall not exceed 35 feet.
|
|
|
Title:
|
| | |
Bld lot coverage
|
|
Wording
|
| | |
Maximum lot coverage shall not exceed 25%.
|
|
|
Title:
|
| | |
Custom Universal Condition
|
|
Wording
|
| | |
A minimum of two (2) parking spaces is required for the manufactured home.
|
|
|
Title:
|
| | |
Aquifer Recharge Conditions (SFR)
|
|
Wording
|
| | |
Critical Aquifer Recharge Areas may require special protection measures to mitigate water quality degradation. The submitted proposal does not require additional aquifer protection measures. However, during construction the project shall follow the Best Management Practices (BMPs) and facility design standards as identified and defined in the Stormwater Management Manual for the Puget Sound Basin.
|
|
|
Title:
|
| | |
BMPs
|
|
Wording
|
| | |
The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.
|
|
|
Title:
|
| | |
F-Custom Universal Finding
|
|
Wording
|
| | |
The parcel has an existing church (BLD92-0522) that was finaled on December 12, 1996.
|
|
|
Title:
|
| | |
F-Custom Universal Finding
|
|
Wording
|
| | |
A building permit (BLD93-0356) was finaled on November 9, 1993 for sprinkler installation on the church.
|
|
|
Title:
|
| | |
F-Custom Universal Finding
|
|
Wording
|
| | |
A building permit (BLD99-0440) was finaled on August 25, 1999 for a covered picnic shelter.
|
|
|
Title:
|
| | |
F-Custom Universal Finding
|
|
Wording
|
| | |
A critical area review (CAR99-0278) was finaled on July 13, 1999 for the covered picnic shelter (BLD99-0440).
|
|
|
Title:
|
| | |
F-Custom Universal Finding
|
|
Wording
|
| | |
An environmental review (ENV92-0001) was finaled on October 12, 1992 for the church (BLD92-0522).
|
|
|
Title:
|
| | |
F-Custom Universal Finding
|
|
Wording
|
| | |
A septic permit (SEP01-0103) for a tank only will be issued simultaneously with the building permit (BLD01-0389).
|
|
|
Title:
|
| | |
F-Custom Universal Finding
|
|
Wording
|
| | |
A septic permit (SEP86-0123) was finaled on July 28, 1999 for the church.
|
|
|
Title:
|
| | |
F-Confirmed ESAs
|
|
Wording
|
| | |
The application was reviewed by the Jefferson County Department of Community Development staff on July 24, 2001 for the potential presence of Environmentally Sensitive Areas (ESAs) under the provisions of the Unified Development Code (UDC). After an initial Geographic Information Systems mapping review and an investigative site inspection, the following ESAs were confirmed to be present on the subject property: SUSC aquifer recharge, seismic, landslide hazard area 1.
|
|
|
Title:
|
| | |
F-Aquifer Recharge Area
|
|
Wording
|
| | |
Aquifer Recharge Areas in Jefferson County are characterized by porous geological formations that allow percolation of the surface water into the soils and the underlying zone of saturation. Aquifers are geologic formations that contain sufficient saturated permeable material to yield significant quantities of water to wells and springs. Aquifers serve as the source of drinking water within most of the rural portions of Jefferson County.
|
|
|
Title:
|
| | |
F-Susc. Aquifer Recharge Area
|
|
Wording
|
| | |
Susceptible Aquifer Recharge Areas are those with geologic and hydrologic conditions that promote rapid infiltration of recharge waters to groundwater aquifers.
|
|
|
Title:
|
| | |
F-Geohazard Area
|
|
Wording
|
| | |
Geologically Hazardous Areas in Jefferson County are characterized by slope, soil type, geologic material, and groundwater that may combine to create problems with slope stability, erosion, and water quality during and after construction or during natural events such as earthquakes or severe rainstorms.
|
|
|
Title:
|
| | |
F-SEPA Exempt
|
|
Wording
|
| | |
Jefferson County determined that this proposal is categorically exempt from review under the State Environmental Policy Act (SEPA) pursuant to WAC 197-11-800(1)(b)(i).
|
|
|
Title:
|
| | |
F-Site Plan Changes
|
|
Wording
|
| | |
The site plan as submitted with the building application on July 6, 2001 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated July 24, 2001 shall be resubmitted for review and approval by Jefferson County Department of Community Development.
|
|
|
Title:
|
| | |
F-Approval for _____ Only
|
|
Wording
|
| | |
This approval is for a manufactured home & septic installation only. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits.
|
|