Title:
|
| | |
OTHER REQUIREMENTS
|
|
Wording
|
| | |
Construction of the Voice Stream Wireless telecommunication facilities is subject to the requirements of the County Building Code, Chapter 15.05 JCC, and all Building Code (UBC), the Electrical Code (NEC), the requirements of the National Electronics Industries Association/Telecommunications Industries Association (EIA/TIA) 222 Revision F Standard entitled "Structural Standards for Steel Antenna Towers and Antenna Supporting Structures" and alny additional applicable standards published by the Electronics Industries Association, the Uniform Fire Code and the Jefferson County Critical Areas Ordinance. Should an easement within the county road right-of-way be required for the purpose or electrical power to the facility, the appropriate approvals or easements shall be obtained.
|
|
|
Title:
|
| | |
SURVEY OF LEASE AREA
|
|
Wording
|
| | |
Prior to issuance of a building permit, a survey of the leased area shall be prepared by a licensed land surveyor and recorded with the Jefferson County Auditor. A copy of the recorded survey shall be submitted to the Jefferson County Department of Community Development.
|
|
|
Title:
|
| | |
EMERGENCY RESPONSE
|
|
Wording
|
| | |
Prior to operation of the telecommunication facilities the applicant shall document that the system has been integrated into the County's Emergency Response System as required by Section 18.42.050. The applicant shall officially certify that they have the capacity to meet FCC mandate that the industry must be able to locate a wireless telephone when it dials 911.
|
|
|
Title:
|
| | |
TOWER SETBACK REQUIREMENT
|
|
Wording
|
| | |
The applicant shall setback the tower at least 635 feet from all property boundaries. Techniques such as additional screening, submittal and approval of the proposed color(s), reflective qualities of the paint and painting patterns are recommended for adequate mitigation, subject to department approval.
|
|
|
Title:
|
| | |
NOISE CONDITION
|
|
Wording
|
| | |
Noise generated by the wireless telecommunication facility shall not exceed the maximum environmental noise levels established in Chapter 173-60, Washington Administrative Code, as it now is in effect or in effect or hereafter amended. In the event the applicant adds an emergency generator in the future, the applicant shall notify Jefferson County and provide noise generation data for the installed generator.
|
|
|
Title:
|
| | |
ERSOION SEDIMENT CONTROL
|
|
Wording
|
| | |
The applicant shall implement a Small Parcel Erosion and Sediment Control Plan that applies the Small Parcel Minimum Requirements from the Washington Department of Ecology Stormwater Management Manual for the Puget Sound Basin. A Small Parcel Erosion and Sediment Control Plan that mets this requirement shall be submitted to the Jefferson County Department of Public Works for review and approval prior to commencing land-disturbing activities.
|
|
|
Title:
|
| | |
CONDITION COMPLIANCE
|
|
Wording
|
| | |
The applicant is responsible to ensure that at the time an application is made for a building permit, that all documentation for compliance with conditions 1, 2, 4, 5, 9 and 13 is submitted to Jefferson County.
|
|
|
Title:
|
| | |
ZONING CONDITION COMPLIANCE
|
|
Wording
|
| | |
Prior to issuance of a certificate of zoning condition compliance or a certificate of occupancy, the applicant shall provide written documenntation that all remaining conditions of this zoning (Type A) permit have been satisfactorily met. It is the responsibility of the applicant to coordinate with the contractor in meeting the conditions of a type A zoning approval.
|
|
|
Title:
|
| | |
CONDITION DOCUMENTATION
|
|
Wording
|
| | |
For conditions 12, 18, 20, 21 & 22 the applicant may provide a written, dated, signed letter stating that you have reviewed , understand and agree to take full responsibility for compliance with those listed conditions.
|
|
|
Title:
|
| | |
FAA LIGHTING
|
|
Wording
|
| | |
If the FAA requires that lighting be placed at the top of the new 195-foot tower, the applicant shall provide documentation from the FAA verifying that the tower will be required to be lit.
|
|
|
Title:
|
| | |
SCREENING
|
|
Wording
|
| | |
Based on Design Review Standard a.8.b, prior to issuance of a final Certificate of Compliance, the applicant shall prepare a planting plan, which provides for fast growing vegetation with a minimum planted height of six feet to provide supplemental planting to aid in screening the lower portion of the tower. The plan shall be reviewed and approved by the project planner or Director to verify that the proposed supplemental planting vegetation will be adequate to screen the facility. For all screening, the use of trees with significant height and fullness upon maturity shall be adequate to screen the facility. For all screening, the use of trees with significant height and fullness upon maturity shall be required. In lieu of compliance with this requirement, the applicant may apply for a variance pursuant to Section 18.42.120 Variances.
|
|
|
Title:
|
| | |
TF-Paint Standards
|
|
Wording
|
| | |
Prior to issuance of a building permit, the applicant shall provide information related to the color(s), the paint reflective qualities, and the proposed paint patterns for the attached antennas and equipment enclosure for review and approval by staff.
|
|
|
Title:
|
| | |
TF-Lighting
|
|
Wording
|
| | |
Security lighting for the equipment enclosure shall be minimized. Any newly installed security lighting shall be oriented downward and shielded so that light falls only within the boundaries of the property and shall be triggered only by a motion sensor.
|
|
|
Title:
|
| | |
TF-Signs
|
|
Wording
|
| | |
Signs, symbols, flags, banners or other devices shall not be attached to or painted or inscribed upon any tower or antenna. A telephone number and person to call for information or in the event of an emergency shall be posted at the site.
|
|
|
Title:
|
| | |
TF-Maintenance
|
|
Wording
|
| | |
The applicant shall protect the facility from unauthorized access consistent with the purpose of protecting the public health, safety and welfare. The applicant shall maintain the facility in a good and safe condition and preserve its original appearance and concealment or camouflage elements incorporated into the design at the time of approval. Maintenance shall include, but not be limited to, such items as painting, structural repair, repair of equipment and maintenance of landscaping.
|
|
|
Title:
|
| | |
TF-Building Permit
|
|
Wording
|
| | |
The type "A" land use permit for this facility shall automatically expire and become void if the applicant fails to obtain a building permit within one year of the effective date of the land use permit. The Director may extend the permit for a period of one year, provided that the applicant files a written request for extension not less than 60 days prior to the expiration that specifies good cause for the extension.
|
|
|
Title:
|
| | |
TF-Transfer
|
|
Wording
|
| | |
If the applicant transfers, assigns, or subleases a wireless communication facility, a copy of the land use agreement and FCC license shall be submitted in writing to the Director, as well as the name and telephone number of a person responsible for the facility, who is capable of responding immediately.
|
|
|
Title:
|
| | |
TF-Expenses
|
|
Wording
|
| | |
The applicant shall be responsible for all direct and indirect expenses incurred related to review and compliance with conditions of approval. All fees shall be as authorized by County Ordinance.
|
|
|
Title:
|
| | |
TF-Abandonment
|
|
Wording
|
| | |
In the event the wireless telecommunication facility is unused for a period of 180 consecutive days will be declared abandoned by the County. The property owner shall remove abandoned facilities within 180 days from the date of abandonment. Failure to remove an abandoned facility shall be considered a public nuisance subject to penalties.
|
|
|
Title:
|
| | |
TF-Extensions
|
|
Wording
|
| | |
Upon written application, prior to the expiration of the 180-day period, the Director shall in writing grant a 180-day extension for reuse of the facility. Additional extensions beyond the first 180 day extension may be granted by the Director, subject to any conditions required to bring the project or facility into compliance with current law(s) and make it compatible with surrounding development.
|
|
|
Title:
|
| | |
TF-Removal
|
|
Wording
|
| | |
If an abandoned facility is not removed within 180 days or a longer period of time determined in writing by the Director, the County shall have the authority to enter the property and remove the facilities. All reasonable and documented costs of such removal shall be charged to the provider and/or landowner of record.
|
|
|
Title:
|
| | |
TF-Removal
|
|
Wording
|
| | |
If an abandoned facility is not removed within 180 days or a longer period of time determined in writing by the Director, the County shall have the authority to enter the property and remove the facilities. All reasonable and documented costs of such removal shall be charged to the provider and/or landowner of record.
|
|