|
Description:
|
| | |
Final Inspection
|
|
Date Completed:
|
| | |
10/26/2000
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
FINAL sign-off
|
|
Date Completed:
|
| | |
10/26/2000
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Issue Building Permit (F)
|
|
Date Completed:
|
| | |
7/6/2000
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Plan Check
|
|
Date Completed:
|
| | |
7/5/2000
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Septic Review Approval
|
|
Date Completed:
|
| | |
7/5/2000
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Stormwater Review
|
|
Date Completed:
|
| | |
6/27/2000
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Critical Area Review
|
|
Date Completed:
|
| | |
7/5/2000
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
DRD Approval (Zoning)
|
|
Date Completed:
|
| | |
6/30/2000
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Building Permit Application(F)
|
|
Date Completed:
|
| | |
6/2/2000
|
|
Disposition:
|
| | |
DONE
|
|
|
Title:
|
| | |
Bld Stormwater Inspection
|
|
Wording
|
| | |
Call Jefferson County Permit Center, Development Review Division for inspection of erosion control measures. (360) 379-4463
|
|
|
Title:
|
| | |
Bld Storage of inflammable liquid
|
|
Wording
|
| | |
The storage and handling of inflammable liquids, liquified petroleum, gases and explosives shall comply with rules and regulations falling under the jurisdiction of the fire marshal, the laws of the state and other local ordinances. Bulk storage of inflammable liquids below ground shall be located no closer to the property line than the greatest dimension (diameter, length, or height) of the tank.
|
|
|
Title:
|
| | |
Bld Outside Storage
|
|
Wording
|
| | |
Commercial and industrial developments located in all zoning districts hall screen from areas frequented by the general public, all materials stored outside buildings or structures which are not for display or immediate sale. Areas frequented by the general public shall be defined as public streets and rights-of-way, and other areas normally used by the general public located adjacent to the subject property.
|
|
|
Title:
|
| | |
Bld Noise
|
|
Wording
|
| | |
The intensity of sound emitted by any commercial or industrial activity shall not exceed levels estabished by the Washington State Department of Ecology under WAC 173-60, and by Jefferson County under Resolution No. 67-85, "Establishment of Environmental Designations for Noise Abatement Areas for Jefferson County."
|
|
|
Title:
|
| | |
Bld Noise Abatement
|
|
Wording
|
| | |
All noise emitting machinery that cannot in any other way operate below the maximum permitted noise level shall be housed in a sound-attenuating structure.
|
|
|
Title:
|
| | |
Bld Off Street Parking
|
|
Wording
|
| | |
Off street parking shall be provided in accorddance with the minimum standards set forth in Tables 3 & 4 of the Jefferson County Zoning Ordinance. For every two employees on shift, one (1) off street parking space is required. (No less than one (1) per 800 square foot of gross floor area). No less than 2% of the total number of parking spaces or a minimum or one (1) space, whichever is greater, shall be designated handicap parking and be no less than 13' 0" wide.
|
|
|
Title:
|
| | |
Bld Security/hooded lights
|
|
Wording
|
| | |
Lighting fixtures shall be designed and hooded to prevent the light source from being directly visible from outside the boundaries of the property. The intensity or brightness of all lighting, during construction and after project completion shall not adversely affect the use of surrounding properties or adjoining rights-of-way.
|
|
|
Title:
|
| | |
Bld Exterior height lights
|
|
Wording
|
| | |
Exterior lighting for commercial and industrial uses shall not exceed thirty feet (30') in height from the finished grade. Exterior lighting for residential uses shall not exceed twenty feet (20') in height from the finished grade, excepting when such lighting is an integral part of a building or structure. Ground level lighting is encouraged.
|
|
|
Title:
|
| | |
Bld loading/unloading
|
|
Wording
|
| | |
Loading and unloading must occur on site (off-street).
|
|