|
Case Number:
|
|
SEP2019-00060
|
Received Date:
|
|
3/19/2019
|
|
Description:
|
|
Adding an ATU ONLY for new BLD that will be processing apples into cider. Effluent
pumped to SEP16-09 main drainfield
|
Issued Date:
|
|
2/25/2020
|
|
Case Status:
|
|
F
|
Expiration Date:
|
|
2/25/2023
|
| | |
Final Date:
|
|
2/26/2020
|
|
Permit Applicant:
|
 
 
FINNRIVER NORTH LLC
|
|
Parcel No:
|
901151004
|
|
Type of Work:
|
|
ALT
|
Water Source:
|
|
|
Tank Size:
|
|
1500
|
|
Number of Bedrooms:
|
|
|
Water Type:
|
|
|
Soil Type:
|
|
1
|
|
Size of Site:
|
|
32.76
|
|
|
|
Drainfield Length:
|
|
|
Applic Rate:
|
|
1.0
|
|
Previous Eval?
|
|
SEP
|
Trench Width:
|
|
|
Staff:
|
|
|
|
|
|
|
Gallons Per Day:
|
|
300
|
|
|
Trench Depth:
|
|
|
|
Type of System:
|
|
AEROBIC UNIT
|
|
System Comments:
|
|
This system serves the cider processing building.
|
|
Septic Waiver Comments:
|
|
|
|
Case Notes:
|
|
|
|