|
Case Number:
|
|
SEP2017-00127
|
Received Date:
|
|
7/3/2017
|
|
Description:
|
|
Filed with SEP1996-00150. Total GPD has been reduced from 869gpd to 698gpd to account for elevated BOD of
current bussiness. Due to minimum land area no more than 869gpd can be disposed of on this property IF THE WASTE STRENGTH MEETS TL-E.
|
Issued Date:
|
|
11/7/2018
|
|
Case Status:
|
|
C
|
Expiration Date:
|
|
11/7/2021
|
| | |
Final Date:
|
|
|
|
Permit Applicant:
|
 
 
M & J INVESTMENTS
|
|
Parcel No:
|
901024110
|
|
Type of Work:
|
|
ALT
|
Water Source:
|
|
PUB
|
Tank Size:
|
|
2000
|
|
Number of Bedrooms:
|
|
|
Water Type:
|
|
|
Soil Type:
|
|
1/2
|
|
Size of Site:
|
|
0.96
|
|
|
|
Drainfield Length:
|
|
174
|
Applic Rate:
|
|
0.1
|
|
Previous Eval?
|
|
|
Trench Width:
|
|
5.0
|
Staff:
|
|
|
|
|
|
|
Gallons Per Day:
|
|
698
|
|
|
Trench Depth:
|
|
24
|
|
Type of System:
|
|
SAND LINED BED
|
|
System Comments:
|
|
Due to minimum land area no more than 869gpd of TL-E wastewater can be disposed of on this property.
|
|
Septic Waiver Comments:
|
|
|
|
Case Notes:
|
|
|
|