|
Case Number:
|
|
SEP2015-00015
|
Received Date:
|
|
2/10/2015
|
|
Description:
|
|
tank & transport line only to SEP12-104 filed here
|
Issued Date:
|
|
4/17/2015
|
|
Case Status:
|
|
F
|
Expiration Date:
|
|
4/17/2018
|
| | |
Final Date:
|
|
2/4/2016
|
|
Permit Applicant:
|
 
 
POPE RESOURCES
|
|
Parcel No:
|
801361001
|
|
Type of Work:
|
|
CON
|
Water Source:
|
|
PRV
|
Tank Size:
|
|
1000
|
|
Number of Bedrooms:
|
|
|
Water Type:
|
|
|
Soil Type:
|
|
3
|
|
Size of Site:
|
|
624.00
|
|
|
|
Drainfield Length:
|
|
0
|
Applic Rate:
|
|
0.8
|
|
Previous Eval?
|
|
SEP
|
Trench Width:
|
|
|
Staff:
|
|
|
|
|
|
|
Gallons Per Day:
|
|
490
|
|
|
Trench Depth:
|
|
|
|
Type of System:
|
|
SEP TANK/PUMP CHAM TO IND SYS
|
|
System Comments:
|
|
|
|
Septic Waiver Comments:
|
|
|
|
Case Notes:
|
|
|
|