|
Case Number:
|
|
SEP2010-00146
|
Received Date:
|
|
11/23/2010
|
|
Description:
|
|
Filed w/ SEP20-27
Transport line capped at both ends, permitted under SEP20-27. May be used in future.
|
Issued Date:
|
|
12/20/2010
|
|
Case Status:
|
|
DCM
|
Expiration Date:
|
|
12/20/2013
|
| | |
Final Date:
|
|
4/11/2011
|
|
Permit Applicant:
|
 
 
NORTHWEST SCHOOL OF WOODEN
|
|
Parcel No:
|
901013016
|
|
Type of Work:
|
|
ALT
|
Water Source:
|
|
PUB
|
Tank Size:
|
|
0
|
|
Number of Bedrooms:
|
|
|
Water Type:
|
|
|
Soil Type:
|
|
1A
|
|
Size of Site:
|
|
5.34
|
|
|
|
Drainfield Length:
|
|
0
|
Applic Rate:
|
|
1.0
|
|
Previous Eval?
|
|
SEP
|
Trench Width:
|
|
0.0
|
Staff:
|
|
|
|
|
|
|
Gallons Per Day:
|
|
732
|
|
|
Trench Depth:
|
|
0
|
|
Type of System:
|
|
TRANSPORT LINE
|
|
System Comments:
|
|
|
|
Septic Waiver Comments:
|
|
|
|
Case Notes:
|
|
|
|